March Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

C2090-623 Questions and Answers

Question # 6

A CQM report successfully runs in another environment but fails in IBM Cognos Analytics. Environments are identical except for the versions.

How could the issue be identified?

A.

Perform a UDA trace.

B.

Modify the ipfserverconfig.xml.

C.

Increase the logging level of the Query service.

D.

Restart the IBM Cognos Analytics service to eliminate all remaining BIBus processes.

Full Access
Question # 7

An administrator created a Content Store export and included the user account information.

How can a listing of the content be exported?

A.

Within the export, ensure the Recording level option is set to Trace.

B.

By default when the Content Store is backed up, a full detailed listing is generated and available in the Logs folder.

C.

Modify the Advanced settings on the ContentManagerService by adding the parameter CM.DeploymentDetailEntireContent with a value of true.

D.

Modify the Advanced settings on the ContentManagerService by adding the parameter CM.DeploymentIncludeConfiguration with a value of true.

Full Access
Question # 8

An administrator wants to start the LifeCycle Manager service.

How can this be done?

A.

Open IBM Cognos Configuration and start the service.

B.

Open Administrative tools, Services, and start the LCM service.

C.

Use the lcm_start.bat command from a command prompt window.

D.

Type the URL in a browser, http://server_name:port_number/lcm_servlet/webcontent/app/main.

Full Access
Question # 9

A high user load and interactive reporting system on a distributed installation is throwing timeout error messages.

How is this resolved?

A.

Increase the JVM heap settings in IBM Cognos Configuration under Services.

B.

Edit the install_location/bin CQEConfig.xml and change the DB_Connection_Pool value to 120, save and restart the service.

C.

Edit the install_location/webapps/p2pd/WEB-INF/services reportservice.xml and increase the async_wait_timeout_ms, save and restart the service.

D.

Increase the number of Report Processes under IBM Cognos Administration on the Status tab under System, set properties to equal 2 times the number of total processor cores.

Full Access