HPE7-J02 Questions and Answers

Question # 6

A financial services company is planning to upgrade its data center infrastructure. Their considerations are:

Budget Management: Prefer one-time expense, avoid variable costs.

Flexibility: Growth planned in yearly budget cycles.

Ownership: Want to own equipment outright.

Operational Control: Full control of equipment lifecycle and customization.

Which procurement option best meets these needs?

A.

Operating lease

B.

Capital lease

C.

Consumption model

D.

Capital purchase

Full Access
Question # 7

Refer to the exhibit of Zerto Vault architecture.

Which statement about the Zerto Vault architecture is correct?

A.

Data is replicated via encrypted periodic replication between Production and the Replication Target.

B.

Data is replicated via encrypted periodic replication between the Replication Target and the Vault.

C.

The Resilience Automation Server manages port access between Production and the Replication Target.

D.

Immutable snapshots of all Zerto components are taken at the Replication Target and replicated to the Vault.

Full Access
Question # 8

Exhibit shows HPE StoreOnce Catalyst Store Security Settings:

Server Controlled Data Immutability enabled (7 days).

Maximum ISV Controlled Data Immutability Retention (90 days).

Which statement is correct?

A.

Maximum ISV Controlled Data Immutability Retention allows the ISV backup application to manage item-level immutability.

B.

Server-Controlled Data Immutability is required to achieve the highest immutability with Veeam v12 backups.

C.

Server-Controlled and ISV-Controlled Data Immutability values do not need to match when both are configured.

D.

The Maximum ISV Controlled Data Immutability Retention parameter must be set to 0 for optimal Veeam v12 support.

Full Access
Question # 9

Your customer has 2 Alletra 6000 arrays configured for asynchronous replication. The facilities team is planning grid maintenance in the datacenter hosting the source array. They want to proactively move all host I/O to the target array.

Which action needs to be done on the Alletra group level to move the host I/O to the other datacenter?

A.

Failover

B.

Promote

C.

Demote

D.

Handover

Full Access
Question # 10

Refer to the exhibit.

Your customer had an unexpected failure of their current storage array, causing them to lose some of their critical data. As a result, they are looking for a storage array with a guarantee of 100% data availability to prevent this failure and loss in the future.

They need 80TB raw and two new 25GbE top-of-rack switches to connect to their environment.

They expect 5% annual growth.

Which correction should be made to the configuration in the exhibit to meet the customer’s requirements?

A.

Change to 25G networking

B.

Decrease to 20 × 3.84TB drives

C.

HPE GreenLake financial model

D.

Add 2× Aruba 8325 switches

Full Access
Question # 11

An HPE Alletra 6030 with 138TB flash kit needs a storage expansion. The BOM lists only a 46TB Expansion Shelf, including price.

What should you take into account?

A.

The expansion shelf needs to include the 24G SAS cables.

B.

Total supported capacity will be exceeded with the proposed configuration.

C.

Both Controllers need 100Gb OCP adapters for the expansion shelf connection.

D.

QSFP+ DAC cables are required if NVMe media is used.

Full Access
Question # 12

A growing technology company is planning to upgrade its data center infrastructure. Their considerations:

Budget: Predictable monthly payments, no upfront CapEx.

Flexibility: Long-term use, no forced returns.

Ownership: Prefer eventual ownership, spread payments.

Control: Full customization and upgrades.

Which procurement option best meets their needs?

A.

Consumption based

B.

Operating lease

C.

Capital purchase

D.

Capital lease

Full Access
Question # 13

Refer to the exhibit.

The array is experiencing frequent cache misses for read operations.

Which action plan would you suggest to correct the issue?

A.

Upgrade the setup with additional expansion shelf.

B.

Upgrade the controllers to Alletra 5050 models.

C.

Increase the pinned cache size.

D.

Increase the flash to disk ratio.

Full Access
Question # 14

Your customer wants to use their HPE Alletra Storage MP B10000 array to store persistent data for Kubernetes-based applications. After deploying the CSI driver using Helm and creating the secret with the command kubectl create -f hpe-backed.yaml, what is the next required step to enable the containerized applications to consume persistent volumes on the Alletra MP array?

A.

Update the Helm repository by using helm repo update to recognize the CSI driver

B.

Create a PersistentVolumeClaim by using kubectl create -f my-pvc.yaml

C.

Create a PersistentVolume by using kubectl create -f pv.yaml

D.

Define a StorageClass by running kubectl create -f storageclass.yaml

Full Access
Question # 15

Two HPE Alletra 6000 arrays are configured for peer persistence between datacenters A and B, which have a fiber distance of 50km (31mi). The datacenter B hardware will be relocated to a new location that will increase the fiber distance to 150km (93mi).

Which condition is valid once the relocation is finished?

A.

The peer persistence configuration is supported, when latency remains <10ms.

B.

The peer persistence replication links need to be changed to RC transport.

C.

The peer persistence setup needs to be changed to active peer persistence.

D.

The fiber distance exceeds the distance supported for peer persistence setup.