Weekend Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

 Construction-Manager Dumps with Practice Exam Questions Answers

Questions: 65 Questions and Answers With Step-by-Step Explanation

Last Update: Oct 18, 2025

Construction-Manager Question Includes: Single Choice Questions: 65,

Construction-Manager Questions and Answers

Question # 1

When applying Business Intelligence (also known as data mining) to manage large volumes of construction project data, the source data must

A.

first exist in hard copy format.

B.

include advanced algorithms.

C.

first exist in digital format.

D.

include outliers and missing data.

Question # 2

Bid contract documents have been prepared for LEED certification, but the owner has decided not to formally register for LEED certification. The owner still requires LEED equivalency. How does the CM proceed with the bid process?

A.

Inform owner that LEED process as specified in the specifications will not be implemented.

B.

Notify bidders at prebid conference of changes in LEED registration.

C.

Instruct architect to make changes to bid documents to reflect deletion of LEED registration.

D.

Issue bid instructions that owner will not register project for LEED certification but the contract terms remain unchanged.

Question # 3

During the design phase of a project, the owner had requested the design team develop mitigating strategies due to expected budget concerns. During the procurement process, the agency CM should advise the owner consider

A.

incorporating Time and Material Alternates into the bid documents.

B.

incorporating Add/Deduct Alternates into the bid documents.

C.

evaluating Phase Alternates in the bid documents.

D.

evaluating Schedule Alternates in the bid documents.

Question # 4

A construction manager is responsible for the bid review and evaluation of an $85 million high school project. All bids must be submitted in person at the client's Purchasing Office by 1:00 PM EST and stamped by the CM's team. While preparing for the bid opening, the CM noticed that one of the contractor's bids was submitted a day earlier to a new clerk, but was date and time stamped after the bids were due. What should the CM do in this situation?

A.

Put the contractor's unopened bid in tight security until the bid opening has been completed.

B.

Send the bid back to the contractor and apologize for the mishap.

C.

Include the unopened bid. since it clearly was an oversight.

D.

Inform the Owner and review the instructions to bidders for guidance on how to proceed.

Question # 5

The CM is tasked with analyzing the schedule variance of a project on a regular basis. The contractor's recent payment application includes a dramatic increase in earned hours than what was budgeted for the project. This MOST likely indicates

A.

the contractor is making more profit than anticipated.

B.

the project is ahead of schedule.

C.

the contractor will be submitting change orders.

D.

the project is behind schedule.

Construction-Manager Exam Last Week Results!

20

Customers Passed
CMAA Construction-Manager

88%

Average Score In Real
Exam At Testing Centre

88%

Questions came word by
word from this dump

An Innovative Pathway to Ensure Success in Construction-Manager

DumpsTool Practice Questions provide you with the ultimate pathway to achieve your targeted CMAA Exam Construction-Manager IT certification. The innovative questions with their interactive and to the point content make your learning of the syllabus far easier than you could ever imagine.

Intensive Individual support and Guidance for Construction-Manager

DumpsTool Practice Questions are information-packed and prove to be the best supportive study material for all exam candidates. They have been designed especially keeping in view your actual exam requirements. Hence they prove to be the best individual support and guidance to ace exam in first go!

Construction-Manager Downloadable on All Devices and Systems

CMAA Certified Construction Manager Construction-Manager PDF file of Practice Questions is easily downloadable on all devices and systems. This you can continue your studies as per your convenience and preferred schedule. Where as testing engine can be downloaded and install to any windows based machine.

Construction-Manager Exam Success with Money Back Guarantee

DumpsTool Practice Questions ensure your exam success with 100% money back guarantee. There virtually no possibility of losing CMAA Certified Construction Manager Construction-Manager Exam, if you grasp the information contained in the questions.

24/7 Customer Support

DumpsTool professional guidance is always available to its worthy clients on all issues related to exam and DumpsTool products. Feel free to contact us at your own preferred time. Your queries will be responded with prompt response.

CMAA Construction-Manager Exam Materials with Affordable Price!

DumpsTool tires its level best to entertain its clients with the most affordable products. They are never a burden on your budget. The prices are far less than the vendor tutorials, online coaching and study material. With their lower price, the advantage of DumpsTool Construction-Manager Certified Construction Manager (CCM) Practice Questions is enormous and unmatched!

Related Certification Exams

CMAA Construction-Manager Practice Exam FAQs

1. To what extent DumpsTool Construction-Manager products are relevant to the Real Exam format?

DumpsTool products focus each and every aspect of the Construction-Manager certification exam. You’ll find them absolutely relevant to your needs.

2. To what extent DumpsTool’s products are relevant to the exam format?

DumpsTool’s products are absolutely exam-oriented. They contain Construction-Manager study material that is Q&As based and comprises only the information that can be asked in actual exam. The information is abridged and up to the task, devoid of all irrelevant and unnecessary detail. This outstanding content is easy to learn and memorize.

3. What different products DumpsTool offers?

DumpsTool offers a variety of products to its clients to cater to their individual needs. DumpsTool Study Guides, Construction-Manager Exam Dumps, Practice Questions answers in pdf and Testing Engine are the products that have been created by the best industry professionals.

4. What is money back guarantee and how is it applicable on my failure?

The money back guarantee is the best proof of our most relevant and rewarding products. DumpsTool’s claim is the 100% success of its clients. If they don’t succeed, they can take back their money.

5. What is DumpsTool’s Testing Engine? How does it benefit the exam takers?

DumpsTool Construction-Manager Testing Engine delivers you practice tests that have been made to introduce you to the real exam format. Taking these tests also helps you to revise the syllabus and maximize your success prospects.

6. Does DumpsTool offer discount on its prices?

Yes. DumpsTool’s concentration is to provide you with the state of the art products at affordable prices. Round the year, special packages and discounted prices are also introduced.