Question # 6

Which of the following would NOT be a common metric used for monitoring test preparation and execution?

A.

Number of Test cases passed and failed

B.

Percentage of planned test cases designed

C.

Number of test plan review comments

D.

Percentage of tasks complete in test environment preparation

Full Access
Question # 7

Which type of review has the following main purposes:

discussing, making decisions, evaluating alternatives, finding defects, solving technical problems and checking conformance to specifications, plans, regulations, and standards?

A.

Technical Review

B.

Inspection

C.

Walkthrough

D.

Informal review

Full Access
Question # 8

Your task is to compile a test execution schedule for the current release of software.

The system specification states the following logical dependencies:

• An admin user must create/amend/delete a standard user.

• A standard user is necessary to perform all other actions.

The test plan requires that re-tests must be performed first, followed by the highest priority tests. To save time, the test plan states that tests should be scheduled to create test data for the subsequent tests in the schedule.

The following test cases have been designed, with an indication of priority (1 being the highest priority) and whether the test has previously failed.

Which test execution schedule meets the test plan requirements and logical dependencies?

A.

a, d, c, b, e

B.

a, c, b, d, e

C.

e, a, b, c, d

D.

e, a, d, c, b

Full Access
Question # 9

Test script TransVal 3.1 tests transaction validation via screen TRN 003B. According to the specification (PID ver 1.3 10b iv) the validation screen should not accept future dated transactions. Test script TransVal 3.1 passes. Test script eod 1.4 tests end of day processing and is run after the execution of TransVal 3.1 using data entered during that test

Which of the following is the BEST detail on an incident report? [K3]

A.

Title. End of Day failure.. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached.

B.

Title. Transaction input screen validation..Reproducible. Yes. Description. Script eod 1..4 fails . Screen shot of the failure attached. Validation of transaction entryon screen TRN-003B should not allow future dated transactions – see PID ver 1.3 para 10b iv.

C.

Title. Screen TRN-003B validation of transaction date.. Reproducible. No. Description. When a future dated transaction is processed by the end of day process, a failure can occur. This does not always happen. Screen shot of the failure attached.

D.

Title. Screen TRN-003B validation of transaction date. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached. Validation of transaction entry on screen TRN-003B should not allow future dated transactions – see PID ver 1.3 para 10b iv.

Full Access
Question # 10

Refer to the exhibit

The following test cases need to be run, but time is limited, and it is possible that not all will be completed before the end of the test window

The first activity is to run any re-tests, followed by the regression test script. Users have supplied their priority order to tests.

Which of the following gives an appropriate test execution schedule, taking account of the prioritisation and other constraints? [K3]

A.

b, c, g, d, e, i, a, f, h

B.

a, c, d, b, g, e, i, f, h

C.

c, a, d, b, e, g, i, h, f

D.

d, c, a, e, b, g, i, f, h

Full Access
Question # 11

What is the difference between system integration testing and acceptance testing?

A.

System integration testing is testing non-functional requirements Acceptance testing concentrates on the functionality of the system

B.

System integration testing is executed by the developers. Acceptance testing is done by the customer

C.

System integration testing verifies that a system interfaces correctly with other systems. Acceptance testing verifies compliance to requirements

D.

System integration testing verifies compliance to requirements Acceptance testing verifies correct interaction with other systems existing in the user's environment

Full Access
Question # 12

A software company decided to buy a commercial application for its accounting operations. As part of the evaluation process, the company decided to assemble a team to test a number of candidate applications.

Which team would be the most suitable for this goal?

A.

A team from an outsourcing company which specializes in testing accounting software

B.

A team with a mix of software testers and experts from the accounting department

C.

A team of users from the accounting department that will need to use the application on dairy basis

D.

A team from the company's testing team, due to their experience in testing software

Full Access
Question # 13

Which of the following is a task of the Test Analysis and Design activity of the test process?

A.

Measuring the percentage of prepared test cases with what was actually prepared

B.

Identifying necessary test data to support the test conditions and test cases

C.

Verifying that the test environment has been set up correctly

D.

Checking test logs against the exit criteria specified in test planning

Full Access
Question # 14

Which of the following is a correct set of boundary values to test the "Group Size" parameter, as defined by the following statement;

"In a reservation system for groups visiting a small museum, the graphical user interface presents a field asking the number of group members. Group size can be anywhere from 2 to 20 visitors"

A.

0,1,8,21,22

B.

0,1,2,3,10,19,20,21,22

C.

2,3,19,20

D.

1,2,20,21

Full Access
Question # 15

Out of the following, what is not needed to specify in defect report?

A.

How to fix the defect

B.

Severity and priority

C.

Test environment details

D.

How to reproduce the defect

Full Access
Question # 16

Which of the following errors CANNOT be found with structure-based testing techniques?

A.

Memory is leaking

B.

Features are only partially implemented

C.

Data structures that are used before initialization

D.

Division by zero

Full Access
Question # 17

Which of the following tool types is the most useful one for a test manager?

A.

Modeling tool

B.

Static analysis tool

C.

Coverage measurement tool

D.

Defect tracking tool

Full Access
Question # 18

When testing a mission critical system a high coverage should be achieved. Which of the following techniques should be implemented as a structural based coverage technique in order to achieve highest coverage?

A.

multiple condition coverage

B.

decision table

C.

use case testing

D.

statement coverage

Full Access
Question # 19

Which of the following is NOT an example of a common test metric?

A.

Percentage of work done in test environment creation

B.

Average number of expected defects per requirement

C.

Number of test cases run

D.

Deviation from test milestone dates

Full Access
Question # 20

Which of the following statements is correct?

A.

Pair programming is done with developer and tester pairing together

B.

Pair programming is an alternative term for code inspection.

C.

Pair programming is used usually in waterfall model

D.

Pair programming is, among other things, an informal review method.

Full Access
Question # 21

The following diagram lists various types of operating systems, databases and application servers supported by the application under test. For complete coverage of all combinations, how many combinations of the above are to be tested?

A.

11

B.

5

C.

45

D.

3

Full Access
Question # 22

A client-server system for a web development must support a minimum of 200 enquiries per hour. In peak times, it must be available 24 hours x 7 days due to the critical nature of the application, and must have a response time lower than 20 seconds during peak loads.

Which of the following set of test types would be most appropriate to verify the non-functional requirements expressed in this statement?

A.

Performance, Usability, Regression.

B.

System, Load, Fail-over.

C.

Performance, Load, Stress.

D.

Load, Volume and Component.

Full Access
Question # 23

During which stage of the fundamental test process is the testability of requirements evaluated?

A.

Test Implementation and Execution

B.

Test Planning and Control

C.

Evaluating Exit Criteria and Reporting

D.

Test Analysis and Design

Full Access