Question # 6

Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.

A.

Result Analysis (RA) Version

B.

Result Analysis (RA) key

C.

Costing variant for preliminary costing

D.

Variance variant

Full Access
Question # 7

In SAP S/4HANA, you have decided to activate only account-based profitability analysis for your organization. You want to settle costs and revenue of a sales order item to a profitability segment. What do you need to configure?

A.

Source structure

B.

Allocation structure

C.

Cost component structure

D.

PA transfer structure

Full Access
Question # 8

What does SAP/S4HANA select line-item-based data for costing based Profitability Analysis reports?

A.

It select actual data from table CE2XXXX and plan data from CE3XXXX.

B.

It select actual data from table ACDOCA and plan data from ACDOCP.

C.

It select actual data from table CE1XXXX and plan data from CE2XXXX.

D.

It select actual data from table ACDOCA and plan data from COSP.

Full Access
Question # 9

How do you define the relationship between an operating concern and a controlling area?

A.

Many-to-many (N:M)

B.

Many-to-one (N:1)

C.

One-to-many (1:N)

D.

One-to-one (1:1)

Full Access
Question # 10

To which object do you assign a costing sheet?

A.

Valuation variant

B.

Transfer control

C.

Cost component structure

D.

Costing variant

Full Access
Question # 11

You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.

A.

Set the relevant indicators in the CO version.

B.

Set the relevant indicator in the controlling area.

C.

Set the relevant indicator in the planning profile of the order type.

D.

Set the relevant indicator in the internal order master record.

Full Access
Question # 12

What do you need to setup in order to bring the values incoming sales orders into account-based Profitability Analysis?

A.

A multi-valuation ledger

B.

A new standard G/L ledger with exclusive usage of "Prediction"

C.

An extension ledger of type "Simulation"

D.

An extension ledger of type "Prediction and Commitment"

Full Access