1z0-244 Questions and Answers

Note! Following 1z0-244 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

1z0-244 Questions and Answers

Question # 6

The planner wants to compare a Baseline plan with a Simulation plan. He or she Is having difficulties displaying the results of the Plan Comparison report.

Select the possible reason for this difficulty.

Full Access
Question # 7

Identify two entities that are supported by continuous collections, but are NOT snapshot associated.

A.

On Hand quantity

B.

Resources

C.

Safety Stock

D.

Forecasts

E.

Subinventories

Full Access
Question # 8

Identify two statements that are true for Forecast Consumption.

A.

Current Forecast equals Original Forecast plus Customer Orders.

B.

Forecast Consumption Is the process of Increasing a Forecast quantity by the quantity of a Sales Order that the Forecast expects.

C.

Forecast Consumption Is the process of decreasing a Forecast quantity by the quantity of a Sales Order that the Forecast expects.

D.

Current Forecast equals Original Forecast less Customer Orders.

Full Access
Question # 9

Company ABC Is a computer peripherals manufacturer. They have repetitive manufacturing environment and ate currently using Oracle 11.0.3 products with Supply Chain Planning.

Recently they acquired some companies that have manufacturing units globally. The demand for their products have Increased, which has lead to capacity constraints.

They are considering to Implement/Oracle R12 with Advanced Supply Chain Planning.

Identify the best option.

A.

Implement Flow Manufacturing and ASCP with Capacity Constrained Plans.

B.

Implement Repetitive manufacturing and keep the existing Supply Chain Planning.

C.

Implement Shopfloor Management and ASCP with Capacity Constrained Plans.

D.

Implement Repetitive manufacturing and ASCP with Capacity Constrained Plans.

Full Access
Question # 10

Identify five Material Constraints.

A.

Effectivity Dates of Components In Bills of Material

B.

Effectivity Dates of Operations in Routings

C.

Resource efficiency and utilization

D.

Order modifiers

E.

Change of Shift timings

F.

Tolerance fences

G.

Substitute components

Full Access
Question # 11

In a combination of forecasts for one Item, the Planning Manager consumes forecast entries according to the following procedural list:

1. It consumes the entries on the sales order line schedule date (or within the same week or period).

2. It consumes the entries on the forward consumption days (or within the same week or period).

3. It consumes the entries on the backward consumption days (or within the same week or period).

Note: No other setups are performed for consumption. Identify the correct order of consumption.

A.

2, 1, 3

B.

2, 3, 1

C.

1, 3, 2

D.

3, 1, 2

E.

3, 2, 1

F.

1, 2, 3

Full Access
Question # 12

Identify four exception messages that are most likely to appear In an unconstrained plan.

A.

Order with Insufficient lead time

B.

Planned Order uses alternate DIM of Material/Routing

C.

Resource overloaded

D.

Items with a shortage

E.

Orders with compression days

F.

Order lead time constraint

G.

Supplier Capacity overloaded

Full Access
Question # 13

End Item A can be substituted with End Item B and End Item B can be substituted with End Item C. The effective dates for these substitutions are given in the Exhibit.

Which three statements are correct?

A.

End Item A substitution with End Item C Is Inferred.

B.

The inferred substitution rule between Item A and C is effective only from 06-JAN-2008 to 10- JAN-2008.

C.

End Item A substitution with End Item C is not possible.

D.

The inferred substitution rule between Item A and C is effective from 06-JAN-2008 to 22-JAN- 2008.

E.

If End Item A Is requested, it can be satisfied with the supplies from End Items A or B or C.