MB-335 Questions and Answers

Question # 6

A company produces homeopathic lotions for pain relief. The lotions use a combination of ProductA and ProductB. ProductA is the primary ingredient. You use Products to adjust the concentration of active ingredients in the lotion. ProductC represents the remainder.

You need to ensure that the lotion final product has a consistent concentration of anti-inflammatory agents.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Set the formula line type of ProductB to Active

B.

Set the formula line type of ProductA to Compensating

C.

Set the formula line type of ProductC to None

D.

Set the formula line type of ProductA to Active.

E.

Set the formula line type of ProductB to Compensating

Full Access
Question # 7

A manufacturer uses discreet orders and manually consumes raw material after reporting products as finished.

You are performing an end-of-month closing for remaining picking lists on production orders. You must not be required to consume the full amount of material on production order picking lists as a result of improved production efficiency. When the production manager verifies that no material is left to consume, there are remaining back-ordered amounts.

You need to pick the line item short and eliminate the remaining demand.

What should you do?

A.

Enter the consumption amount on the line to match the actual amount used and select end on the production order picking list.

B.

Change the Coverage group on item option to manual

C.

Delete the item from the Bill of materials for the finished good.

D.

Enter the consumption amount on the line to match the actual amount used, and delete the remaining amount.

Full Access
Question # 8

You are using the manufacturing execution module in Dynamics 365 Supply Chain Management. License plate labels must be printed for products in the Report as finished step. You need to use the manufacturing execution functionality that meets this requirement. What should you use?

A.

Work templates

B.

Load planning workbench

C.

License plates

D.

Job card device

Full Access
Question # 9

You need to resolve the issue for UserF.

What should you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 10

You need to resolve the issue for UserC.

Which two options should you configure? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Best before period in days

B.

Best advice period in days

C.

Backward tracing

D.

Forward tracing

E.

Shelf life period in days

Full Access
Question # 11

A discrete manufacturer uses Dynamics 365 Supply Cham Management for time and attendance registrations on the shop floor.

Production worker A and production worker 8 clock in at 7 AM. They clock out at different times. Their work schedules are shown in the following table.

You need to determine how the current configuration will book the time.

What is logged in the system for each worker? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 12

You need to resolve the issue for UserB.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Set up configuration and weight for partial visibility.

B.

Create a product master with predefined variants for ounces and boxes.

C.

Set up configuration and weight for full visibility.

D.

Create a catch weight item.

Full Access
Question # 13

You need to resolve the issue for UserG.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 14

You need to resolve the issue for UserE.

Which configuration options should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 15

You need to configure the system to track the cost and delivery performance of VendorZ.

Which two actions should you perform? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Add an activity to the production route for deliveries.

B.

Create a service product and set Stocked product - Yes.

C.

Add an activity to the production flow for deliveries.

D.

Create a service product and set Stocked product = No.

Full Access
Question # 16

You need to configure the system to meet the requirements.

What should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 17

You need to report newly manufactured bicycles as finished products.

Which three options can you use? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Route card journal

B.

Standard production order update

C.

Handheld warehouse device

D.

Job card journal

E.

Report as finished journal

Full Access
Question # 18

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Full Access
Question # 19

You need to set up the chocolate items.

Which values should you select? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 20

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Full Access
Question # 21

You need to create the production orders for standard model bicycles.

Which method should you use?

A.

Sales order line

B.

Master planning execution

C.

Supply schedule form

D.

Released item

E.

All production orders form

Full Access
Question # 22

You need to configure the bicycles’ production resource.

Which option should you use?

A.

Exclusive capacity set to yes and enter a Batch capacity.

B.

Exclusive capacity set to no and infinite capacity.

C.

Exclusive capacity set to yes and infinite capacity.

D.

Exclusive capacity set to no and enter a Batch capacity.

Full Access
Question # 23

You need to configure the manufacturing groups for the standard model bicycle and the new limited-edition bicycle for the summer season.

Which object should you use?

A.

Commerce channels

B.

Operating units

C.

Teams

D.

Legal entities

E.

Departments

Full Access
Question # 24

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Full Access
Question # 25

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 26

You need to configure production operations for the pine and orange scent solutions.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.

B.

Use a purchase agreement as a service agreement.

C.

Allocate subcontracted work in its own cost breakdown block.

D.

Configure a costing resource and requirement to point to a Vendor type resource.

E.

Configure the BOM line to be of type Vendor and associate the corresponding vendor account.

Full Access
Question # 27

You need to implement the scheduled Kanban requirements.

Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Full Access
Question # 28

You need to configure production control parameters for liquid cleaning solution manufacturing.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Require an electronic signature when the formula is approved.

B.

Select Block editing and approve the formula.

C.

Select the Block removal of approval option for the formula

D.

Select the Block editing option only.

D18912E1457D5D1DDCBD40AB3BF70D5D

Full Access
Question # 29

You need to configure costing for raw materials used to manufacture unscented cleaning solution.

Which form should you use?

A.

Cost basis type

B.

Quantity and margin template

C.

Pricing calculation

D.

Pricing template

Full Access
Question # 30

You need to plan scheduling for Customer1’s order of unscented solution.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Schedule production based on the availability of raw material.

B.

Split and plan operations in detail for each of the resources.

C.

Schedule productions based on the capacity of the resources.

D.

Run master planning with a specific time fence.

E.

Plan scheduling of the production at the resource group level.

Full Access
Question # 31

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 32

You need to modify the production order defaults for the manufacturing execution production order Start process.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 33

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Set the operation route type as Standard.

B.

Set the input warehouse on the resource to the vendor warehouse.

C.

Set the operation route type as Vendor.

D.

Set all BOM lines warehouse to the production warehouse.

E.

Set all the BOM lines to resource consumption.

Full Access
Question # 34

You need to set up the system to calculate the overhead rates automatically for production.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Full Access
Question # 35

You need to set up the configuration model to price the motorcycles correctly. What should you do?

A.

Set Order type in price model to Sales Order and Pricing method in Version to Attribute based

B.

Set Order type in price model to Sales Order and Pricing method in Version to Cost based.

C.

Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.

D.

Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based

Full Access
Question # 36

You need to create the constraint for the ML seat selection.

Which expression constraint should you use?

A.

Implies[Trim==Legend,Seat==ML]

B.

Seat!=ML

C.

[Trim==Legend|Seat==ML]

D.

Implies[Seat==ML,Trim==Legend]

Full Access
Question # 37

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

unmachined plastic pieces

B.

mold tooling

C.

machined plastic pieces

D.

excess plastic

Full Access
Question # 38

You need to configure each item for plastic manufacturing.

Which production types should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 39

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 40

You need to resolve the ModelA charging issue.

Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Ignore scheduled execution

B.

Asset

C.

Tool

D.

Worker

E.

Ignore schedule

Full Access
Question # 41

You need to configure the solution for the two issues the production manager reported.

How should you complete the configurations? To answer, move the appropriate configurations to the correct issues. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Full Access
Question # 42

You need to resolve the ModelT issue reported by the golf course manager.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Service subscription

B.

Counter-based maintenance plan lines

C.

Maintenance plan lines for the location

D.

Service type item

E.

Time-based maintenance plan lines

Full Access
Question # 43

You need to configure the controller's ModelB asset requirements for the off-season.

What should you do?

A.

Use the default functional location

B.

Create a functional location.

C.

Create a location profile.

D.

Create a location type.

Full Access
Question # 44

You need to configure the production requirements of the controller.

What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Full Access
Question # 45

You need to resolve the issue reported by Buyer1.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Assign new engineering version for parent BOM.

B.

Enable active for planning for lifecycle status.

C.

Assign lifecycle state for parent BOM.

D.

Disable active for planning for lifecycle status.

E.

Assign lifecycle state for subassembly.

Full Access
Question # 46

You need to configure the production requirements for the QA team. What should you configure?

A.

product readiness policies

B.

quality order

C.

quarantine order

D.

inventory status

Full Access
Question # 47

You need to configure the reservation methods prototype production order as planned by the engineering team.

How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Full Access
Question # 48

A manufacturer is implementing Dynamics 365 Supply Chain Management with warehouse management processes (WMS).

Warehouse workers use hand-held devices to pick and stage batch-tracked products for production. The warehouse manager requires that products are removed from on-hand inventory and consumed when they are picked and staged for production.

You need to remove the products from on-hand inventory.

What should you configure?

A.

mobile device menu item, start production order

B.

flushing principle, available at location

C.

flushing principle, start

D.

manufacturing execution, job card device

Full Access
Question # 49

You need to meet the substitution requirements for User4 and User5.

What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Full Access
Question # 50

You need to enable the features and configuration keys for the firepits.

Which two features should you enable? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point

A.

Engineering attributes

B.

Change management for process manufacturing

C.

Engineering product variants

D.

Engineering change management

E.

Production floor execution management

Full Access
Question # 51

You need to address the ignition switch issue.

Which three actions should you perform? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Set product readiness to manual,

B.

Copy link and products.

C.

Define business impact.

D.

Change product lifecycle state.

E.

Set product readiness to automatic.

Full Access
Question # 52

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 53

You need to meet the needs for the large teakwood furniture order.

What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Full Access
Question # 54

You need to meet the requirements for User2.

What should you configure?

A.

Process over/under transactions.

B.

Create a transfer journal.

C.

Cancel the product receipt.

D.

Correct the product receipt.

E.

Create a movement journal.

Full Access
Question # 55

You must ensure that the firepit product is available for sale. How should the product be released?

A.

Release the engineering product version and then assign the route.

B.

Connect the BOM to an engineering product version before release.

C.

Connect a route to an engineering version before release.

D.

Release the engineering product version and then assign BOM.

Full Access