93-Tall-Mass-Timber-Buildings Questions and Answers

Question # 6

Concealed spaces in a Type IV-C building must be protected with:

A.

sprinklers per NFPA 13.

B.

a lining of fire-retardant-treated wood.

C.

the same protection as used for interior spaces in a Type IV-C.

D.

noncombustible materials with at least 40 minutes of assigned protection time.

Full Access
Question # 7

Which of the following products is not included in the definition of mass timber?

A.

Solid sawn lumber

B.

Prefabricated wood I-joists

C.

Glued laminated timber

D.

Cross-laminated timber

Full Access
Question # 8

Which of the following best describes circumstances for which a separate inspection by a building official would be required for the fire protection of structural connections in buildings of Type IV-B construction?

A.

When connections do not integrate full mass timber member bearing on other mass timber elements

B.

When connection fire resistance is provided by a fire resistance rated joint system in accordance with Section 715

C.

When connection fire resistance is provided by wood cover calculated to meet the requirements of Section 2304.10.1

D.

When connections are made without additional noncombustible protection beyond what is required for the connected elements

Full Access
Question # 9

Refer to the exhibit by clicking on the EXHIBIT button above.

Question # 9

In the detail shown, if the connections at the glulam beam and the steel plate required a fire-resistance rating of one (1) hour and the wood cover is designed per AWC Technical Report 10 to provide the entire one (1) hour of protection, the minimum required thickness for the wood block member providing protection for the bolt connections is _____ inches.

A.

1.5

B.

1.75

C.

2

D.

3

Full Access
Question # 10

In mass timber construction of Type IV-B, each of the following is suitable for use as fireblocking except:

A.

mineral wool.

B.

one-half-inch gypsum board.

C.

7/16-inch wood structural panels.

D.

mass timber complying with IBC Section 2304.11.

Full Access
Question # 11

The building owner shall be responsible for each of the following for fire safety during construction except:

A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

Full Access
Question # 12

Which of the following is the best definition of Type IV-B construction?

A.

100% noncombustible protection on all mass timber surfaces

B.

50% noncombustible protection on the exterior and interior mass timber elements

C.

100% exposed mass timber except: shafts, concealed spaces, and outside of exterior walls

D.

Noncombustible protection on all surfaces of mass timber except for limited exposed mass timber elements

Full Access
Question # 13

Fire-resistance ratings of members and assemblies can be established by all of the following except:

A.

calculations per IBC Section 722.

B.

fire-resistance testing in accordance with ASTM E84.

C.

fire-resistance designs documented in approved sources.

D.

prescriptive designs of fire-resistance-rated building elements, components or assemblies as prescribed in IBC Section 721.

Full Access
Question # 14

Materials acceptable for use in fire-protecting connections in Type IV-A construction includes each of the following except:

A.

steel plates.

B.

gypsum board.

C.

a coating approved for the required fire endurance time.

D.

additional wood cover applied over the connection.

Full Access
Question # 15

For a sprinklered Business Occupancy (Group B) in a 15-story building of Type IV-A construction, the maximum allowable building area is:

A.

54,000 sq. ft.

B.

648,000 sq. ft.

C.

972,000 sq. ft.

D.

unlimited.

Full Access
Question # 16

The building owner shall be responsible for each of the following for fire safety during construction except:

A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

Full Access
Question # 17

Fire-resistance ratings of members and assemblies can be established by all of the following except:

A.

calculations per IBC Section 722.

B.

fire-resistance testing in accordance with ASTM E84.

C.

fire-resistance designs documented in approved sources.

D.

prescriptive designs of fire-resistance-rated building elements, components or assemblies as prescribed in IBC Section 721.

Full Access
Question # 18

In Type IV-C construction, a connection between two members of the primary structural frame supporting a floor is required to be protected to achieve a minimum fire-resistance rating of:

A.

1 hour

B.

1-1/2 hours

C.

2 hours

D.

3 hours

Full Access
Question # 19

Refer to the figure by clicking on the EXHIBIT button above.

Question # 19

Question # 19

The exterior wall section shown in the Figure provides the prescribed noncombustible protection required by which Construction Type?

A.

Type IV-A

B.

Type IV-B

C.

Type IV-C

D.

Type IV-HT

Full Access
Question # 20

What fire-resistance rating is required for floors in Type IV-A, IV-B and IV-C construction?

A.

1 hour

B.

2 hours

C.

3 hours

D.

4 hours

Full Access
Question # 21

Each of the following is true regarding the fire-resistance rating for exterior bearing walls except:

A.

Type IV-C must be 1 hour

B.

Type IV-A must be 3 hours

C.

Type IV-B must be 2 hours

D.

Type IV-C must be 2 hours

Full Access
Question # 22

Refer to the figure by clicking on the EXHIBIT button above.

Question # 22

Question # 22

The exterior wall section shown in the Figure provides the prescribed noncombustible protection required by which Construction Type?

A.

Type IV-A

B.

Type IV-B

C.

Type IV-C

D.

Type IV-HT

Full Access
Question # 23

Adhesives used to resist passage of air in construction Type IV-C, shall be in accordance with which of the following standards?

A.

UL 263

B.

ASTM A653

C.

ASTM D3498

D.

ASTM F1575

Full Access
Question # 24

Refer to the exhibit by clicking on the EXHIBIT button above.

Question # 24

Given: The connections between the glulam beam and CLT panels all require a fire-resistance rating of 2 hours, and wood cover is designed per AWC Technical Report 10 to provide the entire 2 hours of protection.

The bearing area between the CLT and glulam is the minimum required.

What are the minimum dimensions, in inches, for the wood block shown in red?

A.

1.5 x 1.5

B.

2 x 2

C.

3 x 3

D.

4 x 4

Full Access