H19-132_V1.0 Questions and Answers

Question # 6

Which of the following statements regarding FusionModule800 is incorrect?

A.

FusionModule800 is suitable for small-scale data center scenarios. It only supports N+l power distribution and does not support 2N power distribution architecture.

B.

The FusionModule800 supports optional built-in fire suppression modules, eliminating the need for fire protection system reconstruction.

C.

FusionModule800 supports IT loads ≤ 40 kW.

Full Access
Question # 7

Which of the following statements are incorrect about the “capability of safety and quality planning” among the “four capabilities” of SQA professional skills?

Select All that Apply.

A.

Quality planning is the process of identifying and developing quality objectives for projects and products, as well as the techniques, processes, tools, key measures, etc., required to achieve these objectives and to ensure that the end result meets customer requirements.

B.

SQA is the primary owner for project quality planning.

C.

Quality planning is independently completed by the SQA.

D.

With delivery as the ultimate goal, make the requirements clear to the team in advance by planning activities. Preparedness ensures success, while unpreparedness spells failure.

Full Access
Question # 8

In-row air-cooled cooling is utilized in the FusionDC1000A-40ft-IT solution.

A.

True

B.

False

Full Access
Question # 9

The installation height requirement for the FusionModule2000 is greater than 2.6 m.

A.

True

B.

False

Full Access
Question # 10

The total IT capacity for the IT scenario of FusionDC1000A is __________ kW.

A.

30

B.

60

C.

100

D.

54

Full Access
Question # 11

What does the safety color yellow indicate?

A.

Danger

B.

Do Not

C.

Actions That Must Be Carried Out

D.

Follow Me

Full Access
Question # 12

FusionModule2000 in-row air conditioners are available in two types: 25/35 kW and 46/65 kW.

A.

True

B.

False

Full Access
Question # 13

Which of the following Sparts can be ordered through the SCT?

A.

EOS (End of Service & Support) Spart

B.

Prohibited Spart

C.

EOP (End of Production) Spart

D.

Not EOM (End of Marketing) Spart

Full Access
Question # 14

Which of the following actions can be performed on a BOQ from theMy Quotationpage?

Select All that Apply.

A.

Submit

B.

Copy

C.

Share

D.

Split

Full Access
Question # 15

When submitting a BOQ, a prompt stating“Dynamic package instance part number is missing”appears. What should I do next?

A.

Ignore the prompt and continue to submit the BOQ

B.

Insert a replacement part number manually

C.

Delete the error part number

D.

Apply for package part

Full Access
Question # 16

FusionModule2000 supports facial recognition for opening the aisle doors.

A.

True

B.

False

Full Access
Question # 17

The integrated cooling unit in the FusionModule500 is optional.

A.

True

B.

False

Full Access
Question # 18

According to the training materials, construction-site safety management can be classified into __________.

Select All that Apply.

A.

Safety technology management

B.

Site and facility management

C.

Safety organization management

D.

Behavior control

Full Access
Question # 19

After a BOQ is created, you can promptly set its basic information, such as the BOQ name, BOQ type, office, and remarks.

A.

True

B.

False

Full Access
Question # 20

FusionDC1000A meets level 12 wind-force requirements on the Beaufort scale.

A.

True

B.

False

Full Access
Question # 21

When using Meta CPQ for the first time, you must apply for an account and the associated permissions.

A.

True

B.

False

Full Access
Question # 22

Which of the following is not a business type offered by Meta CPQ?

A.

Commerce application

B.

Draft

C.

Project archiving

D.

Contract/PO

Full Access
Question # 23

Which of the following statements are correct about “Raise a sense of responsibility” in Huawei Digital Power’s quality guideline?

Select All that Apply.

A.

We encourage mutual supervision and weakness identification in neighboring domains, and proactively promote business improvement in neighboring domains.

B.

Only when everyone in our organization shoulders their own responsibilities can we ensure a sound operation during every end-to-end phase, and the high quality of products and services.

C.

When problems arise, we encourage everyone to first reflect on their unsatisfactory attitudes and behaviors. We oppose the behavior to blame others for their attitudes and behaviors while one fails to fulfill one's own duties.

D.

We encourage the exposure of problems and the positive attitude upon a newly found problem.

Full Access
Question # 24

The FusionModule500 uses the typical configuration mode, with core components preinstalled at the factory. How long does it take to roll out services on site?

A.

2 days

B.

1 day

C.

4 hours

D.

3 days

Full Access
Question # 25

After obtaining the total product volume and weight details in the Meta CPQ BOQ, to which of the following businesses can the BOQ be submitted?

A.

Logistics goods volume estimation

B.

Draft

C.

Commerce application

D.

Manual review (exporting databases)

Full Access
Question # 26

Which of the following door-opening methods are not used for the end doors of the FusionDC1000A prefabricated integrated data center?

Select All that Apply.

A.

Can be opened from both inside and outside

B.

Externally opening only

C.

Inward opening only

Full Access
Question # 27

What cooling mode is supported by FusionModule800?

A.

Water-cooling

B.

Air-cooling

C.

Liquid-cooling

Full Access
Question # 28

ECC800-Pro serves as the local monitoring system for FusionModule2000.

A.

True

B.

False

Full Access
Question # 29

When exporting a BOQ, Meta CPQ validates the BOQ. If an error alarm is present in the configuration quotation, you can ignore the error and continue exporting the BOQ.

A.

True

B.

False

Full Access
Question # 30

Which of the following UPSs does the FusionModule500 support?

Select All that Apply.

A.

10kVA

B.

3kVA

C.

6kVA

D.

15kVA

Full Access
Question # 31

According to the training materials, which safety-management phase is described by the following statement? Statement: Proactively correct other people’s violations, and demonstrate concern for others’ safety, team honor, and safety beyond work.

A.

Supervision and management

B.

Team management

C.

By instinct

D.

Self-management

Full Access