When two UPS5000-E share battery strings, the battery capacity of each UPS should be set to the total capacity of battery strings.
For UPS battery installation, the installation tools are not require to insulate.
When connecting UPS5000-E in parallel, the parallel cables are not required to connect in a loop.
What should be done if the humidifier cylinder needs to be removed and maintained?
On the NetEco WebUI, one modular can be bound to a maximum of ( ) ECC800(s).
UPS2000-G-20 kVA displays that the batteries status NA, the possible reason is ().
If the electrical devices need to be checked, maintained and repaired with powering on, warning notices or indication plates should be set around the electrical devices.
When ECC800 detects that a device is connected, a communication interruption alarm will generate. The possible reasons are ().
When the compressor of NetCol5000-A started for the first time, the crankcase heating tape needs to be pre-heated for the time ( ) hours.
The color of sight glass should be ( ) if there is no water existing in refrigerant system.
The cold/hot aisle containment systems can improve cooling efficiency and reduce power consumption.
The UPS5000 anti-seismic kit is applicable to earthquake-prone ones. When earthquake occurs, it provide support for cabinets
The report of the NetEco can be dislayed in different formats, such as bar chart.
On the Current Alarm page of NetEco, filter criteria can’t set to search for the required alarms.