A customer’s legacy three-tier architecture is being modernized with an L3 spine-and-leaf topology. The CX switches in the topology will supply the overlay. The customer data center has six VRFs. The customer has requested service leaf switches to connect to two clustered firewalls that route and filter traffic between the VRFs.
How can the efficiency of traffic flow between subnets in the same VRF be maximized?
You have successfully installed, configured, and migrated the customer to the new Aruba CX data-center equipment.
Which documents are normally included in the post-installation deliverables?
You are designing a CX data center network for a customer who has stated that they must integrate the switches into their automation workflows.
Which capability allows the customer to meet this objective?
You are proposing an L3 spine-and-leaf topology to a customer. The solution includes four CX 8325-32C switches at the spine and two CX 8325-48Y8C switches in every server rack. For this customer, the leaf switches in one rack will provide the border-leaf functionality. The customer’s data center is expanding, and the customer asks how many total server racks this solution can scale to support.
What should you say?
A customer has deployed CX 10000 switches, Fabric Composer, and Pensando Policy and Services Manager (PSM). The switches are discovered in PSM, but no VRFs or networks have been added. The customer now wants to begin by applying micro-segmentation to one network. They state that they plan to add a policy containing rules that permit desired traffic from endpoints in this network. They will apply it to the network as an egress policy. At this time, they will not add any other networks to PSM or apply policies to them.
What warning should you raise to the customer about this plan?
You are presenting the proposed solution to the customer. The customer required micro-segmentation, so you designed the network to use the Aruba CX 10000 DSS. The customer has questions about implementing PVLAN.
Which statement about PVLAN is true and will help the customer understand the fundamentals of micro-segmentation?
Identify the documentation resources that provide validated information to help the architect design the solution. Choose two.
What is the recommended practice for using VSX at the core of a two-tier design?
Waratah Hospital, located in Australia, plans to relocate many data-center services to a new facility. The remaining legacy data center is outside this project’s scope. Waratah Hospital engaged an external consultant to help design the new data center network.
Based on the data center network-infrastructure requirements, the external consultant created a high-level design. The design document is summarized below.
Requirements and information:
Six racks in the data center room, arranged in a single row.
Redundant top-of-rack leaf switches with back-to-front cooling in every rack, delivering 10/25 Gbps connectivity for servers, storage, and other devices.
Four 100 GbE uplinks per leaf switch.
The customer requested that all switch ports face the rear of the racks (the hot aisle).
OOB management for servers, storage, and network devices must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building using links that provide 400 Gbps.
Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used on the firewalls for failover. The data center network must connect to these firewalls with links totaling 100 Gbps.
The external link is a direct dark-fiber link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year, with close to zero downtime.
All life-critical resources are accessed locally, and all resources are located within the hospital campus.
Waratah Hospital requires a highly secure data center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
Waratah Hospital has a mixture of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
The hospital previously experienced a security breach that caused data loss, network downtime, and identity theft.
Which valid assumptions can be made for this scenario when preparing the network design documentation? Choose two.
You are selecting switches for a new rack that must support several traffic types, including HTTPS multicast streaming and iSCSI traffic. You are deciding between the CX 8360v2-32Y6C and CX 8325-48Y8C models, both of which satisfy the rack’s port requirements.
Which technical requirement should lead you toward the 8325 model?
You are engaged by a customer with 1,115 employees to update the network after the previous network manager has left the company. Which methods can validate the present network state when the available network documentation is out of date? Choose two.
You have delivered a CX 10000-based data-center network to a customer. The customer wants to ensure a smooth transition to the new network before beginning to implement the security capabilities.
What should you recommend for the initial deployment?
Waratah Hospital, located in Australia, plans to move many data center services to a new facility. (The remaining legacy data center is not included in this project.) Waratah Hospital engaged an external consultant to help with the new data center network design.
Based on the data center network-infrastructure requirements, the external consultant has produced a high-level design. The following summarizes the design document’s contents.
Requirements and information:
Six racks in the data center room (a single row).
Redundant Top of Rack leaf switches with back-to-front cooling in every rack, delivering 10/25 Gbps connectivity to servers, storage, and other devices.
Four 100 GbE uplinks per leaf switch.
The customer requested that all switch ports face the back of the racks (hot aisle).
OOB management for servers, storage, and network must be delivered through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building with links providing 400 Gbps.
Internet access is provided through an existing firewall cluster with two firewalls, with each firewall in one data room. The second firewall operates in standby mode, and VRRP is used on the firewalls for failover. The data center network must connect to these firewalls with links totaling 100 Gbps.
The external link is a dark-fiber direct link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year with close to zero downtime.
All life-critical resources are accessed locally, and all resources are within the hospital campus.
Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
In the past, the hospital experienced a security breach that caused data loss, network downtime, and identity theft.
Refer to the scenario. You have learned that the customer must extend two VRFs between the new data center network and the firewall. To meet the scenario requirements and general best practices, what should you recommend for connecting border leaf switches to the hospital core?
Waratah Hospital, located in Australia, plans to relocate many data-center services to a new facility. (The remaining legacy data center is outside the scope of this project.) Waratah Hospital has engaged an external consultant to help design the new data-center network.
Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The following summarizes the design document.
Requirements and information:
Six racks in the data-center room (a single row).
Redundant Top-of-Rack leaf switches with back-to-front cooling in every rack, delivering 10/25 Gbps connectivity for servers, storage, and other devices.
Four 100 GbE uplinks per leaf switch.
The customer requested that all switch ports face the back of the racks (hot aisle).
OOB management for servers, storage, and networking must be delivered through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building through links providing 400 Gbps.
Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall runs in standby mode, and VRRP is used on the firewalls for failover. The data-center network must connect to these firewalls using links totaling 100 Gbps.
The external link is a dark-fiber direct link using single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year with close to zero downtime.
All life-critical resources are accessed locally, and all resources reside within the hospital campus.
Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
Previously, the hospital experienced a security breach that caused data loss, network downtime, and identity theft.
In this scenario, the customer servers are HPE Servers. For the iLO ports, you propose one 6300M switch per rack. What is the best practice for connecting these switches to the data-center data plane?