Question # 6

A team member accidentally unpinned and dragged a linked CAD file, and it is no longer aligned according to the Shared Coordinates.

How can the BIM manager realign the linked CAD file in the Revit model?

A.

Publish the Coordinates from the host model to the linked CAD file.

B.

Select the linked CAD file and use the Move command to realign the link.

C.

Select the Shared Site of the linked CAD file and move the instance to the defined Site.

D.

Ask the consultant to update the CAD file and relink it.

Full Access
Question # 7

The BIM manager oversees both design coordination and post-handover data requirements and is asked to ensure the digital deliverables align with the owner’s long-term asset-management system.

To minimize information gaps, inconsistencies in file formats, and unclear responsibilities throughout delivery, which tool should the BIM manager rely on to define who provides what information, when, and in what format, from design through facilities handover?

Note: In the context of this exam, the term Level of Development (LOD) is used interchangeably with level of information need.

A.

The file-naming protocol and model-authoring standards.

B.

The Quantity Takeoff Checklist and/or the BIM Execution Plan.

C.

The Model Element Table and Level of Development (LOD) matrix.

D.

The Master Information Delivery Plan (MIDP) and/or the BIM Execution Plan.

Full Access
Question # 8

A design team requests a focused coordination review between the Architectural and Structural published design models. They want to exclude all other trades from the clash matrix.

What should the BIM manager do to ensure only the Architectural and Structural models are included in clash detection?

A.

Request each non-relevant discipline to temporarily remove its views from the coordination environment.

B.

Merge all models into a single federated model and manually hide non-relevant elements.

C.

Run clash detection on all models but only review the issues between Architectural and Structural.

D.

Assign only the Architectural and Structural models to a dedicated coordination group before running clash detection.

Full Access
Question # 9

The BIM manager is launching a civic center project with strict sustainability and lifecycle data goals. During early planning, each discipline proposes different modelling approaches, and there is concern that downstream data handoff may be inconsistent.

To establish BIM goals and uses that ensure alignment from design through operations, what should the BIM manager do first?

Note: In the context of this exam, the term Level of Development (LOD) is used interchangeably with level of information need.

A.

Ask each team to submit its standard BEPs for review and consolidate them into one reference document.

B.

Finalize the LOD matrix and data drops based on similar past projects, updating it during the design process as needed.

C.

Begin developing the internal BIM templates and content, assuming they will be applicable to this project.

D.

Host a stakeholder session to review the project-specific requirements and BIM uses, and establish mobilization needs and modelling requirements.

Full Access
Question # 10

What is included in a BIM Execution Plan?

A.

Project schedule and design playbook.

B.

Modeling standards and technology ecosystem.

C.

LOD Matrix and project specifications.

D.

Collaboration protocols and project playbook.

Full Access
Question # 11

Which of the following would typically be included in an AECO BIM data handover package at project closeout?

A.

Internal meeting notes from model coordination sessions.

B.

Federated design models used during clash detection.

C.

3D views used for clash detection during model coordination.

D.

Record models with the required asset data embedded.

Full Access
Question # 12

The BIM manager is conducting a health check of a design model submitted by a consultant to assess its readiness for coordination. Several model performance concerns have been raised, including long open times, sluggish navigation, and excessive file size.

Which of the following actions would best help to evaluate the model’s health and identify areas of improvement?

A.

Run a performance audit using review tools and evaluate the number of warnings, file size, and modeling practices such as in-place families.

B.

Notify the consultant to reduce the model file size by deleting sheets and exporting only 3D views.

C.

Review the consultant’s coordination clash reports to determine if unresolved issues are impacting performance.

D.

Disable all linked files and re-enable them one at a time to identify which one is causing performance issues.

Full Access
Question # 13

When working with separate Revit templates for each discipline, which elements should be standardized to support collaboration and seamless coordination across the project?

A.

A coordinated set of title blocks, project units, specific view templates, and parameters that include both Project and Shared Parameters.

B.

Individually developed templates with custom levels and grids, allowing each discipline to organize models based on its own internal requirements and modelling preferences.

C.

A blank or out-of-the-box Revit template with no predefined standards, requiring each designer to set up views, parameters, and content from scratch on every project.

D.

A single template used across disciplines with shared settings, general workflows, and uniform file structure to simplify project setup and minimize variation.

Full Access
Question # 14

A client is seeking bids from a range of possible fabricators to determine which will win the contract to join the team.

What settings in Autodesk Forma allow a team to distribute files to a party that is not a project member?

A.

Audit and Compact the file and then save.

B.

Centralize the model and have the recipient create a local file.

C.

Set the permissions of the folder to allow Everyone to access.

D.

Enable the project for public sharing and send a transmittal from the files.

Full Access
Question # 15

During early coordination on a hospital project, the BIM manager runs a general clash detection between all models and generates over 3,000 clash results. Many are low-priority issues, such as wall-grid overlaps and minor duct-ceiling intersections. The project’s clash matrix outlines only high-impact clashes between structural, MEP, and architecture in specific zones.

For the BIM manager, what is the most appropriate next step to align clash reporting with the project’s coordination strategy?

A.

Share the full clash report with all project teams and instruct them to determine and resolve the issues they consider most important.

B.

Export the entire clash list into spreadsheet format so project managers can manually sort, review, and prioritize the items by trade.

C.

Disable or relax selected non-critical clash rules within the detection software to temporarily reduce the total number of reported issues.

D.

Apply the clash matrix to filter out low-priority clashes, adjust detection tolerances where appropriate, and produce reports for each discipline’s scope.

Full Access
Question # 16

A firm-wide Revit template has an advanced setup of views preset on sheets. A renovation project has a linked as-built model with levels that do not align with levels from the model template.

What method should a BIM manager use to update the levels and create grids in sync with the resource model, without requiring extensive reworking of the preset sheets?

A.

Align model levels to the linked levels and use Copy/Monitor to duplicate the linked grids.

B.

Create a Scope Box around the linked model and assign it to the template levels and grids.

C.

Delete the template’s levels and use Copy/Monitor to duplicate the linked levels and grids.

D.

Customize a View Template to hide the template levels and only show the linked levels.

Full Access
Question # 17

A BIM manager is reviewing a consultant’s architectural model before the next coordination milestone. The project requires each model to conform to a defined naming convention, include COBie parameters, and populate shared parameters according to the Model Element Table. The BIM manager notices that several elements are missing metadata and that some naming is inconsistent.

Which step best supports a systematic evaluation of completeness and compliance with project standards?

A.

Manually review each element in the Model Browser to confirm naming and parameter completeness.

B.

Use a model checker or data-validation tool to compare parameter presence, naming conventions, and required values against the established project standard.

C.

Ask the design team to re-export the model with updated information based on verbal clarification and metadata from the BIM Execution Plan.

D.

Filter out incomplete elements in a 3D view and hide them to avoid confusion during coordination.