Question # 6

What is an inspection waiver?

A.

Permission to proceed with production or shipment without having a purchaser inspection representative present

B.

Permission to proceed with production or shipment without the source inspector present at a hold point

C.

Permission to proceed with manufacturing or fabrication before a nonconformance release has been issued

D.

Permission to proceed with manufacturing or fabrication pending resolution of a nonconformance report because of a critical schedule

Full Access
Question # 7

Actual dimensions verified during a source inspection should be recorded in the:

A.

redline drawing.

B.

reference drawing.

C.

shop traveler.

D.

status report.

Full Access
Question # 8

In hazardous classified locations on process skids, electrical and instrumentation equipment installed in the classified area must be:

A.

painted red

B.

certified for the hazardous location

C.

mounted only outdoors

D.

supplied by the same manufacturer as the process equipment

Full Access
Question # 9

According to ANSI C57.12, each line terminal of a winding shall be tested to what maximum value?

A.

Switching Impulse Insulation Level

B.

Chopped Wave Insulation Level

C.

Wye-Winding Insulation Level

D.

Basic Lightning Impulse Insulation Level

Full Access
Question # 10

In addition to purchase order requirements and company standards, what document would provide the details for correct coatings application?

A.

Quality Plan

B.

Manufacturers' Recommendations

C.

ASME BPVC Section II

D.

Inspection and Test Plan

Full Access
Question # 11

What is the purpose of an insulation resistance reading?

A.

To evaluate the insulation and condition of the grounding

B.

To determine the resistance of the conductors

C.

To evaluate the condition of the insulation between conductors and ground

D.

To determine if the conductors are properly terminated

Full Access
Question # 12

A source inspection coordinator is determining whether an item should receive resident inspection rather than final inspection only. Which factor is MOST directly relevant?

A.

Color of enclosure paint

B.

Probability and consequence of failure

C.

Number of supplier sales offices

D.

Whether the item is stored indoors

Full Access
Question # 13

According to IEEE C57.12.00, a durable, metal, name plate shall be affixed to each transformer by the:

A.

manufacturer.

B.

owner.

C.

purchaser.

D.

QA/QC Inspector.

Full Access
Question # 14

Which of the following is primarily concerned with providing confidence that quality requirements will be fulfilled rather than detection and curing of problems?

A.

Inspection

B.

Quality control

C.

Quality planning

D.

Quality assurance

Full Access
Question # 15

As part of a purchase order, what type of documents typically supplement industry standards?

A.

Supplier Quality Standards

B.

Manufacturing Standards

C.

Material Test Reports

D.

Client Standards

Full Access
Question # 16

According to API RP 540, threaded conduit joints for explosionproof connections should be made with at least how many fully engaged threads?

A.

2

B.

3

C.

4

D.

5

Full Access
Question # 17

According to NETA, for low voltage cables a visual inspection must verify that:

A.

color codes comply with IEEE requirements.

B.

the shield on power cables is properly grounded.

C.

connections are in accordance with the single-line diagram.

D.

all cables are connected to terminals via ring tongue lugs.

Full Access
Question # 18

According to NFPA 70, equipment shall be marked to show the hazardous environment for which it has been evaluated. Markings on this equipment shall include which of the following?

A.

Class, voltage, current, material of construction, equipment temperature

B.

Class, division, material classification group, equipment temperature, ambient temperature range

C.

Class, voltage, material classification group, operating temperature, ambient temperature range

D.

Class, division, material of construction, equipment temperature, ambient temperature range

Full Access
Question # 19

Which of the following is identified in the guide as a key MCC design item?

A.

Ground bus

B.

Transformer conservator

C.

Buchholz relay

D.

Tap changer handle

Full Access
Question # 20

According to API 541, determination of efficiency and power, locked-rotor current, power factor, torque, full-load current and slip are some of the tests verified when performing a:

A.

complete test.

B.

compliance test.

C.

design test.

D.

routine test.

Full Access
Question # 21

According to the referenced API standard in the guide, special purpose induction motors covered by API STD 541 are:

A.

100 hp and larger

B.

250 hp and larger

C.

375 kW (500 hp) and larger

D.

1000 kW and larger only

Full Access
Question # 22

What does the second letter of the four-letter cooling code on liquid-immersed transformers identify?

A.

Internal cooling medium in contact with the windings

B.

Circulation mechanism for internal cooling medium

C.

External cooling medium

D.

Circulation mechanism for external cooling medium

Full Access
Question # 23

What tool is designed to measure mechanical oscillations?

A.

Techometer

B.

Spectroscope

C.

Oscilloscope

D.

Vibration Meter

Full Access
Question # 24

Metallic shielding components such as tapes, wires, or braids shall be connected to a:

A.

equipment grounding busbar.

B.

low voltage ceramic insulator.

C.

low voltage connector.

D.

center tap of a transformer.

Full Access
Question # 25

According to API 541, when shall the vendor provide calculated data from the final witness testing?

A.

Two weeks following testing

B.

Upon request

C.

At time of final shipment

D.

Immediately upon completion of testing

Full Access
Question # 26

Deviations from specifications must be approved by the:

A.

manufacturer's engineer.

B.

vendor's quality manager.

C.

inspection coordinator.

D.

responsible engineer.

Full Access
Question # 27

Apparent power is measured in:

A.

mhos.

B.

vars.

C.

volt-amperes.

D.

watts.

Full Access
Question # 28

According to API 541, the combined runout for areas on the shaft that are to be observed by radial vibration probes shall not exceed:

A.

the maximum vibration amplitude specified in the manufacturer's test criteria.

B.

12.7 µm 0.5 mils.

C.

10% of allowed unfiltered peak to peak vibration amplitude or 3.2 µm 0.125 mils, whichever is greater.

D.

25% of allowed unfiltered peak to peak vibration amplitude or 6.4 µm 0.25 mils, whichever is greater.

Full Access
Question # 29

During switchgear source inspection, which item must be verified to prevent opening a medium-voltage door when the isolation switch handle is in the full ON position?

A.

Space heater thermostat

B.

Door interlock operation

C.

Meter accuracy class

D.

CT polarity marking

Full Access
Question # 30

Which switchgear-related item is explicitly identified in the guide table of contents as an inspection topic?

A.

Cable tray color coding

B.

Metering

C.

Turbine nozzle alignment

D.

Firewater pump casing hardness

Full Access
Question # 31

What document provides information on design and installation of electrical systems for fixed and floating offshore petroleum facilities for unclassified and Class I, Zone 0, Zone 1 and Zone 2 locations?

A.

NFPA 70

B.

IEEE 841

C.

API RP 14F

D.

API RP 14FZ

Full Access
Question # 32

What is an insulation resistance test?

A.

A test that determines the adequacy of electrical insulation for the normally occurring over voltage transient

B.

A test that determines the corrosive contaminants around the conductors, terminal spacing problems, and tolerance errors in cables

C.

A spot overvoltage test which uses an applied DC voltage to measure ohms

D.

A test that determines the voltage that electrical insulation can withstand during normal operation

Full Access
Question # 33

Which of the following tools is used for inspection of coating?

A.

Dry film thickness DFT

B.

Digital surface profile gauge

C.

Surface profile replica tape

D.

Ultrasonic thickness meter

Full Access