LEED-AP-BD+C Questions and Answers

Question # 6

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

A.

Planting density, soil conditions, irrigation efficiency and rainfall

B.

Relative humidity, site exposure, plant species and planting density

C.

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

Full Access
Question # 7

A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

A.

Protects greenfields and farmland

B.

Preserves habitat and natural resources

C.

Reduces need for new utility infrastructure

D.

Reduces potential damage to an existing stream

Full Access
Question # 8

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing ofRaw Materials,

Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental Product

Declarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Full Access
Question # 9

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

A.

Owner

B.

Contractor

C.

Occupants

D.

Facility manager

Full Access
Question # 10

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

A.

U.S. Internal Revenue Service

B.

U.S. Department of Agriculture

C.

U.S. Environmental Protection Agency

D.

U.S. Department of Housing and Urban Development

Full Access
Question # 11

When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be

A.

included in the calculation

B.

excluded from the calculation

C.

excluded if the total volume is less than 25% of the building being reused

D.

excluded if the total volume is more than 25% of the building being reused

Full Access
Question # 12

What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

A.

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided

B.

Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided

C.

Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

D.

Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Full Access
Question # 13

What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?

A.

LEED v4, LEED for Neighborhood Development Conditional Approval

B.

LEED for Neighborhood Development Pilot, Stage 3 LEED for Neighborhood Development Certified Project

C.

LEED for Neighborhood Development Pilot, Stage 1 LEED for Neighborhood Development Pre-reviewed Plan

D.

LEED 2009, Stage 1 Conditional Approval of LEED for Neighborhood Development Plan

Full Access
Question # 14

What phase of the integrative process gives the team the greatest chance of success in meeting the project's environmental goals cost-effectively?

A.

Design

B.

Discovery

C.

Operations

D.

Construction

Full Access
Question # 15

The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)

A.

Exemplary Performance for a related credit

B.

Special Circumstances within a related credit

C.

Regional Priority Credit

D.

Innovation Credit

Full Access
Question # 16

An owner has requested that the project team redesign a large office building. As part of the redesign, the owner would like to move the main entrance to the opposite side of the building. Achievement of which credit may be affected by the move?

A.

Location and Transportation Credit, High-Priority Site

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses

D.

Location and Transportation Credit, LEED for Neighborhood Development Location

Full Access
Question # 17

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

A.

Site Development-Protect or Restore Habita

B.

Site Assessment

C.

Heat Island Reduction

D.

Light Pollution Reduction

Full Access
Question # 18

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

A.

$90

B.

$225

C.

$360

D.

$405

Full Access
Question # 19

During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highlyreflective roof. Which option should the LEED AP recommend to best address these concerns?

A.

Install a vegetative roofing system

B.

Change the design to reduce the amount of roofing area

C.

Change the roofing material to a dark material to eliminate the issue

D.

Increase the parapet height

Full Access
Question # 20

What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

A.

Local building code

B.

ASHRAE 62.1-2010

C.

International Mechanical Code 2012

D.

The ventilation code requiring the greatest volume of outside air

Full Access
Question # 21

A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?

A.

Use ground source heat pump

B.

Install efficient plumbing fixtures

C.

Ergonomics design for classrooms and computer rooms

D.

Purchase all materials locally to minimize road transportation

Full Access
Question # 22

Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?

A.

Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Interior Lighting

B.

Indoor Environmental Quality Credit, Low-Emitting Materials and Sustainable Sites Credit, Site Assessment

C.

Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Minimum Indoor Environmental Quality Performance

D.

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies and Indoor Environmental Quality Prerequisite, Minimum Indoor Environmental Quality Performance

Full Access
Question # 23

When a project team sustainably develops a project site, the design should

A.

increase water runoff

B.

maximize construction pollution

C.

remediate sites already in decline

D.

replace natural water flow patterns

Full Access
Question # 24

Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

A.

Retail

B.

Hospitality

C.

Core and Shell Development

D.

New Construction

Full Access
Question # 25

The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team

decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor

Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?

A.

0.144 CFM/ft2 (0.73 (L/s)/m2)

B.

0.156 CFM/ft2 (0.79 (L/s)/m2)

C.

0.168 CFM/ft2 (0.85 (L/s)/m2)

D.

0.30 CFM/ft2 (1.5 (L/s)/m2)

Full Access
Question # 26

Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

A.

Floor decking

B.

Asbestos insulation

C.

Exterior glazing

D.

Plumbing fixtures

Full Access
Question # 27

Which of these is a method to assess the regional context of a building's design for sustainability?

A.

Conducting a site analysis

B.

Consulting with neighbors

C.

Improving a design threshold

D.

Performing an energy analysis of the building

Full Access
Question # 28

Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the

conventional approach for rainwater management by

A.

replicating a site's natural hydrology

B.

discharging rainwater at a faster rate

C.

increasing a site's impervious surface

D.

providing a greater volume of rainwater detention

Full Access
Question # 29

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

A.

Buildable land within 1/4 mi. (0.40 km) of the project boundary

B.

Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

C.

Surface parking areas within 1/2 mi. (0.80 km) of the project boundary

D.

University campus land areas within 1/2 mi. (0.80 km) of the project boundary

Full Access
Question # 30

Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project's landscape water requirement be reduced by what percentage from the calculated baseline for the project site's peak watering month?

A.

20%

B.

25%

C.

30%

D.

40%

Full Access
Question # 31

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Full Access
Question # 32

When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?

A.

Perform a preliminary water budget analysis before the completion of schematic design

B.

Install permanent metering on both the water sources and the waste water leaving the site

C.

At the completion of schematic design, count the fixtures and apply the maximum flow rate

D.

Estimate consumption by using 20 gal. per day (76 I per day) for each Full Time Equivalent (FTE) scheduled to occupy the building

Full Access
Question # 33

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

A.

Neighbors can plan for future construction

B.

It will help streamline the permitting process

C.

Potential partnerships with the community can be revealed

D.

The owner can determine financial strategies based on the public's input

Full Access
Question # 34

Which energy efficient lamp type is free from mercury?

A.

Compact Fluorescent

B.

High Pressure Sodium

C.

Light Emitting Diode

D.

T-8 Fluorescent

Full Access
Question # 35

Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?

A.

Material reuse

B.

Bio-based elements

C.

Extended producer responsibility

D.

Forest Stewardship Council (FSC) wood products

Full Access
Question # 36

A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?

A.

Track waste materials per occupant

B.

Track waste materials used on site

C.

Document total waste by project cost

D.

Document total waste per building floor area

Full Access
Question # 37

Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?

A.

Ground-source heat pumps

B.

Tidal-based electrical production

C.

Municipal solid waste combustion

D.

Passive solar and daylighting strategies

Full Access
Question # 38

A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

A.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction

B.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

C.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction

D.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction

Full Access
Question # 39

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

A.

The credit is not feasible for this project

B.

The credit may be achieved by using nonroof measures only

C.

The credit is applicable for projects that document this special condition

D.

The credit can only be achieved by using an alternative compliance path

Full Access
Question # 40

Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite,Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

A.

50,000 ft2 (4 645 m2) office project

B.

80,000 ft2 (7 432 m2) hospital project

C.

110,000 ft2 (10 219 m2) school project

D.

140,000 ft2 (13 006 m2) retail project

Full Access
Question # 41

When calculating the reverberation time of a room, which of the following pieces of information is least relevant?

A.

Height and width of room

B.

Noise reduction coefficient of the ceiling surface

C.

Sound absorption coefficient of the floor surface

D.

Operating sound level of nearest HVAC equipment

Full Access
Question # 42

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?

A.

All applicable codes and standards

B.

Interior finishes related to the project

C.

All project team members and applicable roles

D.

Energy efficiency goals and training requirements

Full Access
Question # 43

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6

m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2)

of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be

physically accessible when calculating the Sustainable Sites Credit, Open Space?

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Full Access
Question # 44

A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green

Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to

meet the Option 2 requirements?

A.

Install a preferred drop-off lane for buses meeting the emission requirements

B.

Provide calculations showing that the average fleet bus meets the emission requirements

C.

Inventory the school fleet to develop and create a plan for all buses to meet the emission requirements

D.

Document that all buses serving the project achieve a minimum green score of 30 on the American Council foran Energy Efficient Economy (ACEEE) annual vehicle rating guide

Full Access
Question # 45

Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?

A.

Retail

B.

Schools

C.

Healthcare

D.

Core and Shell

Full Access
Question # 46

What percentage of a building's surface area may be excluded from the calculation for Materials and ResourcesCredit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because ofdeterioration or damage when maintaining existing building structure, enclosure and interior structural elements?

A.

5%

B.

10%

C.

25%

D.

50%

Full Access
Question # 47

What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?

  • Energy and Atmosphere Credit, Demand Response

  • Energy and Atmosphere Credit, Advanced Energy Metering

  • Energy and Atmosphere Credit, Building Level Energy Metering

A.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Full Access
Question # 48

The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction

Practices?

A.

$10,000

B.

$12,500

C.

$22,500

D.

$25,000

Full Access
Question # 49

Which of the following characteristics are a requirement of a compliant water meter?

A.

Must be digital

B.

Must be permanently installed

C.

Must transmit data to a remote location

D.

Must be capable of storing data for 36 months

Full Access
Question # 50

A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution. Which of the following suggestions should the LEED AP give to the project owner?

A.

Modify the design to enclose the performance areas

B.

Calculate the return on investment over the 20-year life of the project

C.

Compare the energy consumption against an alternative

D.

Inform the owner that the LED fixture is exempt from Sustainable Sites Credit, Light Pollution Reduction

Full Access
Question # 51

What LEED Building Design and Construction project type should exclude weekend transit service from the transit service level calculations for Location and Transportation Credit, Access to Quality Transit, if the project occupants do not commute to the building during weekends?

A.

Schools

B.

Data centers

C.

Hospitality

D.

Warehouses and distribution centers

Full Access
Question # 52

Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

A.

At least 6 ft. (2 m) above the floor

B.

At least 3 ft. (1 m) away from windows

C.

Between 3 ft. and 6 ft. (1 m and 2 m) above the floor

D.

On the ceiling 3 ft. (1 m) away from adjacent walls

Full Access
Question # 53

At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

A.

environmental zone

B.

longitude and latitude

C.

ASHRAE 90.1 - 2010 climate zone

D.

Environmental Protection Agency Phase I Assessment

Full Access
Question # 54

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission his own installations and share the results with the project owner

C.

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.

The building's mechanical engineer should commission his own installations and share the results with the project owner

Full Access
Question # 55

Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit,

Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

A.

Architectural floor plans, mechanical plans, lighting plans

B.

Photometric plans, mechanical schedules, lamp specifications

C.

Lighting plans, surveys of occupants, sequence of operations

D.

Surveys of occupants, photometric plans, mechanical schedules

Full Access
Question # 56

Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Alkalinity testing and ENERGY STAR® rating

B.

Non potable water sources and bacteria testing

C.

Water treatment calculations and system performance narrative

D.

Makeup water meters, conductivity controllers and overflow alarms

Full Access
Question # 57

Every location in the U.S. identifies how many regional credits?

A.

Four

B.

Five

C.

Six

D.

Seven

Full Access
Question # 58

A contractor wants to use an adhesive that exceeds the allowed Volatile Organic Compound (VOC) content limit under Indoor Environmental Quality Credit, Low Emitting Materials. This credit canbe earned if

A.

the VOC budget method is applied for VOC content

B.

the adhesive is not included in the LEED documentation

C.

75% of the adhesives used comply with the VOC content limit and emissions requirements

D.

95% of the adhesives used comply with the VOC content limit and emissions requirements

Full Access
Question # 59

A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?

A.

Energy Modeler and Contractor

B.

Construction Manager and Energy Modeler

C.

Energy Modeler and Commissioning (Cx) Agent

D.

Commissioning (Cx) Agent and Facilities Manager

Full Access
Question # 60

An existing vacant office building will be completely renovated and new mechanical, electrical and plumbingsystems will be installed. 20% of the building's gross floor area will be complete at the time of certification. Therewill be a data center and some retail stores on the ground floor of the building at a future date. Which rating systemis applicable for the building?

A.

LEED BD+C: Retail

B.

LEED BD+C: Data Centers

C.

LEED BD+C: Core & Shell Development

D.

LEED BD+C: New Construction & Major Renovation

Full Access
Question # 61

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

A.

Site's impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Full Access
Question # 62

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

A.

Light Pollution Reduction, Places of Respite, Open Space

B.

Heat Island Reduction, Places of Respite, Site Master Plan

C.

Direct Exterior Access, Heat Island Reduction, Rainwater Management

D.

Heat Island Reduction, Light Pollution Reduction, Rainwater Management

Full Access
Question # 63

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?

A.

Excavated soil

B.

Wood derived fuel

C.

Items sent to the local incinerator

D.

Alternate Daily Cover

Full Access
Question # 64

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

A.

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Full Access
Question # 65

Which of the following should be analyzed when pursuing an Integrative Design Process focusing on Energy-Related

Systems?

A.

Site conditions

B.

Potable water availability

C.

Acoustic performance of the project

D.

Applicability of Green Vehicles to the project

Full Access
Question # 66

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

A.

Healthcare

B.

Schools

C.

Data centers

D.

Hospitality

Full Access
Question # 67

A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials

B.

Materials and Resources Prerequisite, Construction and Demolition - Waste Management Planning

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Full Access
Question # 68

A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEEDbaseline. What does this mean to the team in terms of pursuing LEED?

A.

The project cannot pursue LEED

B.

The project may pursue Water Efficiency Credit, Indoor Water Use Reduction

C.

The project does not meet Water Efficiency Prerequisite, Indoor Water Use Reduction, but can make up the points elsewhere in the rating system

D.

The project can meet the Water Efficiency Prerequisite, Indoor Water Use Reduction, but cannot earn any points under Water Efficiency Credit, Indoor Water Use Reduction

Full Access
Question # 69

A new school with a 20 car parking lot has set aside four preferred parking spaces for green vehicles. What else must the project team provide to achieve Location and Transportation Credit, Green Vehicles?

A.

Nothing; the project team has met the credit requirements

B.

Provide secure bike racks for 5% of the building occupants

C.

Provide an additional parking space for a low-emitting and fuel-efficient vehicle

D.

Provide qualifying electrical vehicle supply equipment in 2% of all parking spaces