Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
Which of the following transit modes is considered to be walkable if it is within 1/2 mile (0.8 km) of the functional entry of a project?
A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?
Which of the following scenarios contributes to earning credit under MRc1: Materials and Resources, Option 2. Materials Reuse?
Which of the following strategies supports energy resilience by enhancing the grid interactivity of a building?
The design team for a school project finds that they can achieve an 18% savings in indoor water use from the baseline. If the team adds a rainwater harvesting system that reduces water use by another 10%, they can earn:
A consultant specifies the required U-value, solar heat gain coefficient, and visible light transmittance for a project. What type of building envelope assembly would require these attributes?
What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?
A request to change the lighting fixtures in a conference room is made by a tenant. Which of the following credit scorecard changes will be directly and indirectly impacted by the change in lighting fixtures?
When planning a water-efficient landscape design, the designer should consider including
The current facilities requirements (CFR) and operations and maintenance plan (OMP) required for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification must include
During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?
Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by
Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?
Which of the following is an example of a diverse use as defined by Location and Transportation Credit, Surrounding Density and Diverse Uses?
Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?
When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?
A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if
When designing a building that includes Electric Vehicle Supply Equipment (EVSE), which capability is needed to ensure maximum energy efficiency and cost savings?
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?
Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
Which of the following methods is the referenced standard for demonstrating compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
A new office-building project has implemented several water-saving strategies, achieving a 25% reduction in potable-water consumption through low-flow fixtures, efficient irrigation systems, and related measures. The project has also integrated a rainwater-harvesting system that contributes an additional 10% reduction in potable-water use.
The project team seeks to maximize its points under WEc2: Enhanced Water Efficiency by adopting the Whole-Project Water Use approach. How many total points can the project potentially earn for potable-water reduction, considering its use of alternative water sources?
An office project has the following items in its break room kitchen: a kitchen sink, a residential-style dishwasher, and a coffee machine. How would these items be addressed in Water Efficiency Prerequisite, Indoor Water Use Reduction?
To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?
A project's massing and site orientation can have a direct impact on which of the following prerequisites?
What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?
The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?
The Water Efficiency Prerequisite, Outdoor Water Use Reduction requires a reduction over a baseline that is calculated for the site:
When a project team sustainably develops a project site, the design should
A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?
Which of the following statements is correct when defining the project boundary?
A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?
A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?
A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?
According to the Integrative Process Credit, Integrative Process, the goal-setting workshop should identify
In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?
Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,
Storage and Collection of Recyclables?
Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?
How much value would these two doors contribute toward Material and Resources Credit, Building Product Disclosure and Optimization – Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?
Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?
Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?
A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?
Which of the following Sustainable Sites credits are eligible to be used as a campus approach?
Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?
A critical factor in determining a project’s eligibility for LTc3: Compact and Connected Development, Option 2. Access to Transit, Path 1. Public Transit Service is the:
Which of the following descriptions defines an Environmental Product Declaration (EPD) in the context of MRc4: Building Product Selection and Procurement?
A core and shell project is located in a dense urban area that is known to have frequent fluctuations in the power supply grid (brown-outs). The project team is seeking LEED Platinum certification. Which credit should be pursued when considering the regional context?
Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to
To achieve SSc6: Light Pollution Reduction using the Backlight, Uplight, and Glare (BUG) Rating Method, projects must demonstrate that all luminaires:
A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum
Energy Performance, what option is used?
Which of the following design features helps ensure thermal safety in buildings during extreme heat events by allowing passive cooling?
Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?
A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?
Which of the following management measures is used to minimize the spread of infection in indoor environments?
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?
In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?
What aspects of each space should the LEED consultant consider to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits?
Which of the following features is commonly included in a building’s leak-detection system to enhance water efficiency?
What is the reference standard that defines the requirements for LEED energy modeling?
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:
What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Which of the following strategies is essential for a project to comply with EQc2: Occupant Experience, Option 1. Biophilic Environment?
A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?
Which of the following is an example of a nonroof measure for Sustainable Sites Credit, Heat Island Reduction?
In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for
both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?
A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?
A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of
An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:
Which of the following standards is used to perform a Whole-Building Life-Cycle Assessment to measure the Global Warming Potential of materials in LEED projects?
Which would contribute to compliance with Sustainable Sites Credit, Open Space?
In an area where carbon-emission regulations are becoming progressively stricter, the goal is to future-proof the building for complete electrification and eliminate on-site fossil-fuel combustion. Which of the following measures can the project team use to maximize the building’s readiness for electrification while minimizing on-site combustion sources?
According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:
For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?
Which of the following is omitted from the assessment while performing preliminary energy modeling?
A new mixed-use development includes residential units and commercial spaces. The project is in an urban area with existing pedestrian paths and public transportation infrastructure. How can the project team minimize exposure to emissions from vehicle traffic around the property while ensuring compliance with LEED strategies?
Which of the following pairs of strategies can help reduce the landscape water demand beyond the prerequisite level in Water Efficiency Credit, Outdoor Water Use Reduction?
The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.
What credits should the LEED AP suggest to meet this goal?
A design team is working on a new building project and is employing an integrated, whole-building approach. The architects want to increase the size of a glazed opening on the south facing wall. Which team members are first
affected by this change?
Which of the following products must always be included in Materials and Resources credits?
During preliminary energy analysis, what energy reduction strategies can best help in reducing the energy load in the new building construction project?
During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?
Which of the following credits advocates the values and benefits of green building design and construction as well as outdoor physical activity?
For Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan, which of the following
items is required for credit compliance?
Which of the following components is critical for developing a successful water-balance model for WEc2: Enhanced Water Efficiency, Option 1. Whole-Project Water Use?
U.S. Green Building Council (USGBC)'s vision for using LEED internationally includes
Commissioning (Cx) and verification are requirements to qualify for LEED certification. What are the basic systems that need to be commissioned?
A design team is evaluating strategies to ensure that a healthcare facility remains operational for critical services during frequent power outages. The building currently relies on a diesel generator for emergency power, but the owner is interested in sustainable alternatives that can also contribute to the project’s energy efficiency during normal operations.
Which of the following strategies should the design team recommend to provide energy resilience for the healthcare facility while enhancing energy efficiency during regular operations?
Which of the following credit categories identifies environmental issues that are most relevant for a project's chapter area or country?
For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?
Which of the following strategies enhances energy resilience by ensuring that critical loads are powered during a grid outage?
A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?
A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?
Questions 1–5 are based on the same project scenario. Please use the scenario information when answering.
A hospital certified under LEED V5 in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.
The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.
The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.
The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.
The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.
The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.
The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.
Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?
A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?
A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much
outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?
A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?
A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED
AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?
In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?
What percentile of runoff from a regional development of an office building must a project manage on site by using low-impact development and green infrastructure to achieve three points under the Sustainable Sites Credit-Rainwater Management, Option 1. Percentile of Rainfall Events?
For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to
The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?
The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve
The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if
Location and Transportation Credit, Reduced Parking Footprint calculations must include
What information must be provided to demonstrate compliance with the Owner’s Project Requirements (OPR)?
Which of the following ventilation strategies is essential for maintaining acceptable indoor air quality while balancing energy use?
Which of the following types of water should a project team focus on utilizing to achieve water savings and acquire points under WEc2: Enhanced Water Efficiency, Option 6. Water Reuse, Path 1. Reuse-Ready System, while reducing reliance on potable water?