LEED-AP-BD+C Questions and Answers

Question # 6

What requirements are needed to earn Regional Priority credits?

A.

Full name and specialty credential of LEED AP

B.

Points are awarded automatically

C.

Exemplary performance

D.

Related credits registration

Full Access
Question # 7

A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

A.

Protects greenfields and farmland

B.

Preserves habitat and natural resources

C.

Reduces need for new utility infrastructure

D.

Reduces potential damage to an existing stream

Full Access
Question # 8

The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?

A.

Increases the rainwater infiltration capacity

B.

Decreases the amount of bicycle parking that must be provided

C.

Increases the overall SR (solar reflectance) of the hardscape area

D.

Decreases the required amount of on-street parking that must be provided

Full Access
Question # 9

During the early stages of a LEED project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected a paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

A.

IPc1: Integrative Design Process

B.

PRc1: Project Priorities

C.

EQc2: Occupant Experience

D.

MRc5: Construction and Demolition Waste Diversion

Full Access
Question # 10

Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

A.

Two Level (on, off)

B.

Three Level (on, 25%, off)

C.

Three Level (on, 50%, off)

D.

Three Level (on, 75%, off)

Full Access
Question # 11

What are the three phases within the Integrative Process Credit, Integrative Process?

A.

Pre-design, Discovery, Design and Construction

B.

Discovery, Design and Construction, Operations and Feedback

C.

Schematic Design, Design and Construction, Operations and Feedback

D.

Design Charrette, Schematic Design, Operations and Feedback

Full Access
Question # 12

An office project has the following items in its break room kitchen: a kitchen sink, a residential-style dishwasher, and a coffee machine. How would these items be addressed in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

The kitchen sink is included in fixture calculations, the dishwasher and coffee machine must be ENERGY STAR® or performance equivalent

B.

The kitchen sink is included in fixture calculations, the dishwasher must be ENERGY STAR® or performance equivalent, and the coffee machine is not included in the prerequisite

C.

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine is not included in the prerequisite

D.

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine should be included in fixture calculations

Full Access
Question # 13

Which of the following scenarios contributes to earning credit under MRc1: Materials and Resources, Option 2. Materials Reuse?

A.

Donate salvaged wood to a local nonprofit organisation that repurposes materials

B.

Reuse salvaged metal beams in the construction of the new project

C.

Sell recovered bricks to a salvage retailer for off-site reuse

Full Access
Question # 14

Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

A.

Any changes in schedules or setpoints for different seasons, days of the week, and times of day

B.

Only changes in schedules or setpoints for peak usages during seasons, days of the week, and times of day

C.

Any changes in schedules during peak times, or for different seasons, peak-usage days of the week, and times of day

D.

Any changes in schedules or setpoints focusing on only the hottest and coldest periods of the seasons, peak-use days of the week, and times of day

Full Access
Question # 15

Which of the following filtration methods is recommended for an infection risk management mode to enhance indoor air quality (IAQ) in healthcare facilities?

A.

Activated carbon filtration

B.

Plate-and-frame filters

C.

Ultraviolet germicidal irradiation (UVGI)

Full Access
Question # 16

When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?

A.

Perform a preliminary water budget analysis before the completion of schematic design

B.

Install permanent metering on both the water sources and the waste water leaving the site

C.

At the completion of schematic design, count the fixtures and apply the maximum flow rate

D.

Estimate consumption by using 20 gal. per day (76 I per day) for each Full Time Equivalent (FTE) scheduled to occupy the building

Full Access
Question # 17

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

A.

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse & Innovation Credit, Innovation, Exemplary Performance

B.

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment ofProducts & Innovation Credit, Innovation, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment ofProducts & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

Full Access
Question # 18

For minimum acoustic performance, peak-hour is defined as M

A.

lowest noise level over a specified sample time

B.

highest noise level over various periods of time

C.

an energy-average of the noise level over a specified sample time

D.

an energy-average of noise level divided by total sample time and area of the space

Full Access
Question # 19

A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

A.

Heat gain will reduce the air conditioning load

B.

Having the lights off reduces the electricity use

C.

Reduction in lighting fixture use reduces re-lamping

D.

There would be passive solar heating benefits to all of the classrooms

Full Access
Question # 20

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

A.

At least75% of qualifying land areas within ¾ mile (1.20 km)are previously developed

B.

At least75% of qualifying land areas within ½ mile (0.80 km)are previously developed

C.

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.

The project is a Federal Renewal Community site

Full Access
Question # 21

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a post office and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Full Access
Question # 22

What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?

A.

1.05 gpf (4 lpf)

B.

1.19 gpf (4.5 lpf)

C.

1.23 gpf (4.66 lpf)

D.

1.32 gpf (5 lpf)

Full Access
Question # 23

How can a building owner promote both energy efficiency and thermal comfort in a building?

A.

Survey occupants about their comfort on a regular basis

B.

Provide occupants with individual space heaters in the winter

C.

Ask the cleaning contractor to turn off all of the lights after cleaning

D.

Institute a flexible dress code that permits seasonally appropriate clothing

Full Access
Question # 24

Which of the following prerequisites or credits are affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit. Thermal Comfort?

A.

Energy and Atmosphere Credit. Demand Response

B.

Energy and Atmosphere Credit. Advanced Energy Metering

C.

Energy and Atmosphere Prerequisite. Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite. Building Level Energy Metering

Full Access
Question # 25

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

A.

U.S. Internal Revenue Service

B.

U.S. Department of Agriculture

C.

U.S. Environmental Protection Agency

D.

U.S. Department of Housing and Urban Development

Full Access
Question # 26

Which of the following criteria must a Commissioning Authority (CxA) comply with in order to meet the requirements of the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification of Building Energy Systems?

A.

Document commissioning authority experience for at least one building project

B.

Review the owner ' s project requirements (OPR) for project goals and expectations

C.

Be a part of the project ' s design and construction management team

D.

Report results, findings, and recommendations directly to the architect

Full Access
Question # 27

Which of the following are all considered regular building occupants?

A.

Staff, primary/secondary students, volunteers, and residents

B.

Staff, primary/secondary students, higher education students, and residents

C.

Higher education students, retail customers, periodic volunteers, and visitors

D.

Residents, volunteers, retail customers, and staff

Full Access
Question # 28

A Core and Shell developer pursuing the IPc2 Green Leases credit has drafted lease language. Which provision meets the intent of the credit for binding tenant sustainability commitments?

A.

Tenant shall submit quarterly energy and water consumption reports and achieve a minimum 50% waste diversion rate verified through waste hauler documentation.

B.

Owner will provide tenant with LEED design guidelines and green building best-practices handbook within 30 days of lease execution for reference.

C.

Tenant acknowledges that the building has achieved LEED certification and agrees to maintain awareness of sustainable building operations during occupancy.

Full Access
Question # 29

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

A.

Neighbors can plan for future construction

B.

It will help streamline the permitting process

C.

Potential partnerships with the community can be revealed

D.

The owner can determine financial strategies based on the public ' s input

Full Access
Question # 30

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

A.

6 months

B.

12 months

C.

24 months

D.

36 months

Full Access
Question # 31

A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?

A.

Discounted rail pass availability

B.

Rail line station construction completion date

C.

Connections to transfer routes

D.

Passenger capacity

Full Access
Question # 32

Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

A.

it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

B.

it is specifically exempted by ASHRAE

C.

it will be installed by the owner

D.

the lamp wattage has not been determined

Full Access
Question # 33

What is the maximum walking distance allowed between short-term bicycle storage and a main entrance according to LTc4: Transportation Demand Management?

A.

600 ft. (182.88 m)

B.

800 ft. (243.84 m)

C.

400 ft. (121.92 m)

Full Access
Question # 34

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team ' s top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Full Access
Question # 35

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

A.

Site ' s impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Full Access
Question # 36

Which of the following variables must be included in the calculations for Indoor Environmental Quality Credit, Quality Views?

A.

Ceiling heights

B.

Building furniture

C.

Movable partitions

D.

Permanent interior obstructions

Full Access
Question # 37

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission his own installations and share the results with the project owner

C.

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.

The building ' s mechanical engineer should commission his own installations and share the results with the project owner

Full Access
Question # 38

Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?

A.

A bus stop served by two bus lines Monday through Friday, located 1/8 mi. (0.20 km) from the project building

B.

A rail station served by one train line Monday through Sunday, located 1/2 mi. (0.80 km) from the project building

C.

A rail station served by two train lines Monday through Sunday, located 1 mi. (1.60 km) from the project building

D.

A private shuttle bus stop providing hourly service Monday through Friday to a rail station two hours away, located across the street from the project building

Full Access
Question # 39

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

In addition to the vegetated terraces, the project team is considering installing a green roof with walkways, fountains, and seating areas for patients, visitors, and staff. If the project attempts SSc2: Accessible Outdoor Space, what percentage of the required outdoor space must be vegetated?

A.

20%

B.

25%

C.

30%

Full Access
Question # 40

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Which LEED v5 rating system is appropriate for this project?

A.

LEED for New Construction and Major Renovations

B.

LEED for Commercial Interiors

C.

LEED for Healthcare

Full Access
Question # 41

Landscape irrigation practices consume large quantities of potable water. By evaluating the project ' s outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

A.

earn Water Efficiency Credit, Water Metering

B.

earn Sustainable Sites Credit, Rainwater Management

C.

estimate and optimize water use in landscape designs

D.

estimate and optimize water use in outdoor fountains and pools

Full Access
Question # 42

Which of the following actions should be taken to ensure that project team members understand and prioritize the selection of materials compliant with the Materials and Resources Credit: Building Product Disclosure and Optimization?

A.

Select locally sourced and manufactured materials

B.

Procure materials directly from raw material suppliers

C.

Include all building materials in a whole-building life-cycle analysis

D.

Include the material requirements in the project specifications

Full Access
Question # 43

Which of the following characteristics of a biophilic environment supports occupant quality of life?

A.

Direct line of sight to natural environments

B.

Use of artificial lighting throughout the space

C.

Mechanical ventilation systems

Full Access
Question # 44

Which of the following strategies is essential for a project to comply with EQc2: Occupant Experience, Option 1. Biophilic Environment?

A.

Incorporate the five principles adapted fromThe Practice of Biophilic Design

B.

Encourage positive interactions between people and nature

C.

Select only the most relevant principles adapted fromThe Practice of Biophilic Design

Full Access
Question # 45

Which of the following strategies will aid in reducing indoor water use?

A.

Design drip irrigation for landscape

B.

Use high-efficiency HVAC systems

C.

Exclude janitor closets in the building

D.

Optimize consumption of showerheads

Full Access
Question # 46

What percentile of runoff from a regional development of an office building must a project manage on site by using low-impact development and green infrastructure to achieve three points under the Sustainable Sites Credit-Rainwater Management, Option 1. Percentile of Rainfall Events?

A.

98th percentile

B.

85th percentile

C.

95th percentile

D.

100th percentile

Full Access
Question # 47

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

A.

Develop the building energy model

B.

Optimize the green strategies across all aspects

C.

Calculate the life cycle cost of the building

D.

Choose an appropriate Commissioning Authority (CxA)

Full Access
Question # 48

A design team working on a new building in a coastal city is considering climate resilience strategies. The team refers to the Intergovernmental Panel on Climate Change (IPCC) Sixth Assessment Report to incorporate different emissions scenarios on projected climate changes.

The design team can use emissions scenarios to enhance the climate resilience of their building project by utilizing the:

A.

Scenarios consistent with current global policies and historical emissions trends

B.

Mid-range scenarios, as they are most likely to occur

C.

Scenarios appropriate for the geographic location of the project that take into account local climate action plans

Full Access
Question # 49

What aspects of each space should the LEED consultant consider to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits?

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Average number of occupants standing or seated

D.

Typical duration of occupancy in each space per day

Full Access
Question # 50

The Water Efficiency Prerequisite, Outdoor Water Use Reduction requires a reduction over a baseline that is calculated for the site:

A.

Over the entire year

B.

For the watering month

C.

For the average watering month

D.

Over the driest three-month portion of the year

Full Access
Question # 51

Which of the following requires standard appliances for indoor water reduction?

A.

CEE Tier 3A

B.

GreenSeal

C.

ASHRAE Standard 62.1-2010

D.

ISO 14044-2006

Full Access
Question # 52

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner’s Project Requirements (OPR) be created and updated?

A.

Prior to beginning design and are generally not updated

B.

Once the project design is completed and edited throughout the project

C.

During predesign and are edited throughout the project

D.

After the design is completed and are generally not updated

Full Access
Question # 53

Which of the following is an example of a diverse use as defined by Location and Transportation Credit, Surrounding Density and Diverse Uses?

A.

Automated Teller Machine (ATM)

B.

Informal day care

C.

Public park

D.

Private university gym

Full Access
Question # 54

Which of the following water management practices can be applied to identify and address hidden leaks in the water system of a commercial building?

A.

Implement a comprehensive reporting system for water usage

B.

Set up a separate meter for each floor of the building

C.

Install an advanced system with sensors throughout the plumbing network

Full Access
Question # 55

A real estate development company plans to build a mixed-use facility in an urban area. Which of the following strategies should the developer implement to support the local economy?

A.

Provide location-efficient affordable housing

B.

Provide workforce training

C.

Employ individuals from the local community

Full Access
Question # 56

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

A.

Buildable land within 1/4 mi. (0.40 km) of the project boundary

B.

Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

C.

Surface parking areas within 1/2 mi. (0.80 km) of the project boundary

D.

University campus land areas within 1/2 mi. (0.80 km) of the project boundary

Full Access
Question # 57

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

A.

$75

B.

$150

C.

$750

D.

$1,500

Full Access
Question # 58

An electrical team installs photovoltaic panels over a parking lot. This action contributes to which of the following credits?

A.

Optimize Energy Performance

B.

Light Pollution Reduction

C.

Low-Emitting Materials

D.

Demand Response

Full Access
Question # 59

A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?

A.

Use ground source heat pump

B.

Install efficient plumbing fixtures

C.

Ergonomics design for classrooms and computer rooms

D.

Purchase all materials locally to minimize road transportation

Full Access
Question # 60

When should collaboration start for the integrative process?

A.

Before finalizing the design

B.

During predesign

C.

Before competitive project bidding

D.

Before construction

Full Access
Question # 61

In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?

A.

Zero

B.

One

C.

Two

D.

Three

Full Access
Question # 62

An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

A.

Four points for Water Efficiency Credit, Indoor Water Use Reduction

B.

Zero points because the Water Efficiency Prerequisites are not met

C.

One point for Water Efficiency Credit, Outdoor Water Use Reduction

D.

One point for Water Efficiency Credit, Outdoor Water Use Reduction and four points for Water Efficiency Credit, Indoor Water Use Reduction

Full Access
Question # 63

LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?

A.

Batch project

B.

Group project

C.

Master Site project

D.

Neighborhood project

Full Access
Question # 64

Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?

A.

Ground-source heat pumps

B.

Tidal-based electrical production

C.

Municipal solid waste combustion

D.

Passive solar and daylighting strategies

Full Access
Question # 65

Smoking is prohibited inside LEED-certified buildings in order to eliminate the health risks associated with environmental tobacco smoke. Which building type could have limited exceptions from this requirement?

A.

Warehouse projects

B.

Residential projects

C.

Healthcare projects

D.

Office projects

Full Access
Question # 66

Every location in the U.S. identifies how many regional credits?

A.

Four

B.

Five

C.

Six

D.

Seven

Full Access
Question # 67

Which of the following components is critical for developing a successful water-balance model for WEc2: Enhanced Water Efficiency, Option 1. Whole-Project Water Use?

A.

Identify all end uses within the project scope, including fixtures and fittings

B.

Prioritise alternative water sources to offset overall water demand

C.

Require equipment specifications to align with the contract documents

Full Access
Question # 68

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

A.

One

B.

Two

C.

Four

D.

Six

Full Access
Question # 69

In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?

A.

One-way streets

B.

Bike share

C.

Slow speed roadways

D.

Traffic lights

Full Access
Question # 70

Which of the following should be evaluated to assess a project’s human-use and health impacts?

A.

Access to essential transportation routes

B.

Proximity to manufacturing plants

C.

Access to medical services

Full Access
Question # 71

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

A.

Healthcare

B.

Schools

C.

Data centers

D.

Hospitality

Full Access
Question # 72

A new athletic facility contains a laundry room which is adjacent to the locker rooms. Which strategy will contribute toward the Interior Cross-Contamination Prevention strategy in Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

A.

Relocate the laundry facility to the basement

B.

Naturally ventilate the laundry space per ASHRAE 62.1-2010

C.

Install particle filters, with a MERV of 13 or higher or F7

D.

Provide a ventilation system specifically for the laundry facility that has no recirculating air

Full Access
Question # 73

Which of the following must be included in the Sustainable Sites Credit, Site Assessment?

A.

A targeted Brownfield remedy plan

B.

Historic preservation plan to include neighboring properties

C.

Proximity of vulnerable populations to major sources of air pollution

D.

The surrounding density within a 1/4 mi. (0.40 km) radius of the project boundary

Full Access
Question # 74

In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens

A.

must be calculated using at least 20% from an alternative water source

B.

must be calculated using 100% potable water

C.

may be included or excluded from the calculations

D.

may be calculated using a standard 20% reduction from baseline

Full Access
Question # 75

Which of the following items must have safe collection, storage, and disposal for Materials and Resources Prerequisite, Storage and Collection of Recyclables?

A.

Food waste

B.

Medical waste

C.

Electronic waste

D.

Landscape waste

Full Access
Question # 76

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner ' s Project Requirements (OPR)?

A.

All applicable codes and standards

B.

Interior finishes related to the project

C.

All project team members and applicable roles

D.

Energy efficiency goals and training requirements

Full Access
Question # 77

U.S. Green Building Council (USGBC) ' s vision for using LEED internationally includes

A.

allowing more stringent credit requirements for countries outside of the U.S. so that all projects can achieve LEED

B.

creating multiple LEED rating systems for different countries

C.

modifying U.S. reference standards, such as ASHRAE 90.1, to be more appropriate for regions outside the U.S.

D.

providing opportunities for alternative compliance paths that meet the unique needs of a particular region

Full Access
Question # 78

In addition to Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Materials Reuse, salvaged materials contribute to the achievement of

A.

Materials and Resources Prerequisite, Storage and Collection of Recyclables

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

C.

Materials and Resources Credit, Construction and Demolition Waste Management

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Full Access
Question # 79

A developer is building a new shopping mall in a temperate climate. The developer wants to reduce operating costs and improve occupant experience. Which design scheme should the project team present?

A.

A design that increases peak thermal loads in the office and administrative spaces

B.

A design that reduces the overall parking footprint and provides preferred parking for electric-vehicle charging

C.

A design with a narrow floor plate that maximizes daylight in retail areas and minimizes the need for electric lighting

D.

A design with a large roof that collects rainwater to reduce stormwater runoff

Full Access
Question # 80

For a new project with a $10 million construction cost, the weight of the total recycled content is 0.9 tons (816.5 kilograms) each for post-consumer and pre-consumer recycled content. The value of the total recycled content is one million each for post-consumer and pre-consumer recycled content. What is the percentage of recycled content that contributes toward Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2, Leadership Extraction Practices?

A.

33%

B.

20%

C.

40%

D.

18%

Full Access
Question # 81

A new facility has a comprehensive advanced energy metering system that measures energy consumption across multiple subsystems. The facilities manager aims to use this data to enhance energy management practices and improve overall building performance.

The facilities manager can utilize the advanced energy metering system to optimize energy use and reduce costs in the new student center by:

A.

Adjusting the setpoints of the HVAC system based solely on outdoor temperature changes

B.

Using automated alerts from the metering system to address sudden spikes in energy use

C.

Scheduling regular audits for all installed lighting systems to ensure compatibility with energy meters

Full Access
Question # 82

In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for temporary use (formwork, bracing and scaffolding) on the project?

A.

Temporary wood products cannot be included in the calculations

B.

If any temporary wood materials are included in the calculation, all wood materials must be included in the calculation

C.

Only Forest Stewardship Council (FSC)-certified wood materials are included in the calculation; non-certified wood materials contribute to other credits

D.

FSC-certified wood materials purchased for more than one project can be applied to other projects seeking LEED Certification

Full Access
Question # 83

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

Full Access
Question # 84

The Lakeside Resort is a hotel in a rural area located about 60 mi. (96.6 km) from the nearest town, which has a population of 10,500. There are no other towns for over 200 mi. (321.9 km). The surrounding community is largely made up of ranches and federal- and state-owned land.

The project consists of a single building that includes the following:

• 150 guest rooms

• A small restaurant

• An indoor pool

• Conference spaces

• Event spaces

• Six tenant spaces

A lease has been secured for a future spa, gift shop, coffee shop, and tour operator. Two of the six tenant spaces have not yet been leased. The property is 10 acres, adjacent to a lake, and has trail access to public lands for hiking. It is anticipated that occupants will mostly arrive by car, but there is one public bus trip per day from the nearest town.

The project consists of the building, parking lots for overnight guests and daily visitors, a walking path to the lake, and hiking trails leading to the public lands. The project has a goal of being Gold certified under LEED for New Construction.

When determining occupancy for the project, how should the project team account for the occupancy for the future spa, gift shop, coffee shop, tour operator space, and the two unknown tenant spaces?

A.

Use zero as the number of occupants for unleased spaces

B.

Use an estimate of the number of occupants based on the project team ' s discretion

C.

Use the default occupancy counts from the LEED Reference Guide for the incomplete spaces

Full Access
Question # 85

Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by

A.

replicating a site ' s natural hydrology

B.

discharging rainwater at a faster rate

C.

increasing a site ' s impervious surface

D.

providing a greater volume of rainwater detention

Full Access
Question # 86

A project team is considering implementing a strategy that has previously been awarded as an Innovation credit on another project. Which actions should be followed if the project team wishes to gain formal pre-approval of the same strategy on the new project?

A.

Consult the LEED Administrator for the previous project

B.

Submit a Project Credit Interpretation Request (CIR) to GBCI

C.

Submit to Green Business Certification Inc. (GBCI) as-is

D.

The project is ineligible for an Innovation credit

Full Access
Question # 87

Which of these is a method to assess the regional context of a building ' s design for sustainability?

A.

Conducting a site analysis

B.

Consulting with neighbors

C.

Improving a design threshold

D.

Performing an energy analysis of the building

Full Access
Question # 88

Which of the following strategies reflects a synergy between EQc2: Occupant Experience, Option 5. Lighting Environment and Energy and Atmosphere credits?

A.

Design open spaces to support community interaction and connectivity while preserving natural site topography and ecological balance

B.

Introduce light pipes into enclosed areas that do not have direct exposure to the exterior

C.

Use double-glazed windows to improve thermal comfort while ensuring uniform temperature distribution

Full Access
Question # 89

Which of the following is omitted from the assessment while performing preliminary energy modeling?

A.

Massing and orientation

B.

Thermal comfort ranges

C.

Supply sources

D.

Plug and process loads

Full Access
Question # 90

A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:

A.

At least 75% of qualifying land areas within 3/4 mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within 1/2 mile (0.80 km) are previously developed

C.

The project is a Federal Renewal Community site

D.

The site is a brownfield as defined by the Environmental Protection Agency

Full Access
Question # 91

Which of the following documents contains the design team ' s interpretation of the Owner ' s Project Requirements?

A.

Basis of Design (BOD)

B.

Simple Box Energy Model Analysis

C.

System ' s manual

D.

Integrated Project Delivery report

Full Access
Question # 92

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

Full Access
Question # 93

When attempting Regional Priority Credit, what must be provided in LEED Online?

A.

Latitude and longitude

B.

Heating and cooling degree days

C.

Climate zone

D.

ENERGY STAR® score

Full Access
Question # 94

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Full Access
Question # 95

A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?

A.

Energy and Enhanced Commissioning

B.

Indoor Environmental Quality, Thermal Comfort

C.

Energy and Atmosphere, Optimize Energy Performance

D.

Indoor Environmental Quality, Interior Lighting

Full Access
Question # 96

Location and Transportation Credit, Reduced Parking Footprint calculations must include

A.

motorbike spaces

B.

on-street parking in public rights-of-way

C.

parking within 1/4 mi. (0.40 km) radius of the project boundary

D.

parking outside the project boundary but used by the project

Full Access
Question # 97

When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be

A.

included in the calculation

B.

excluded from the calculation

C.

excluded if the total volume is less than 25% of the building being reused

D.

excluded if the total volume is more than 25% of the building being reused

Full Access
Question # 98

A facility manager cleaning highly reflective paving material is

A.

unnecessarily wasting water

B.

reducing the heat island effect

C.

increasing the heat island effect

D.

lowering the Solar Reflectance Index (SRI)

Full Access
Question # 99

Which of the following strategies can increase the climate resilience of a project during site-specific natural hazard events?

A.

Enhancing roof insulation

B.

Utilizing drought-tolerant landscaping

C.

Increasing indoor ventilation rates

Full Access
Question # 100

Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

A.

At least 6 ft. (2 m) above the floor

B.

At least 3 ft. (1 m) away from windows

C.

Between 3 ft. and 6 ft. (1 m and 2 m) above the floor

D.

On the ceiling 3 ft. (1 m) away from adjacent walls

Full Access
Question # 101

Which of the following credit options can a project team attempt if a local, national, or international organization indicates that the neighborhood site of the project has a significant cultural value?

A.

Historic district

B.

Priority designation

C.

Brownfield remediation

D.

Diverse uses

Full Access
Question # 102

Major renovation projects must meet which of the following minimum percentage savings when taking credit for renewable energy systems?

A.

5%

B.

3%

C.

2%

D.

8%

Full Access
Question # 103

If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term

bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle

Facilities?

A.

Three

B.

Four

C.

Five

D.

Ten

Full Access
Question # 104

What percentage of all energy usage is attributable to buildings?

A.

60%

B.

30%

C.

40%

D.

50%

Full Access
Question # 105

Which of the following design features enhances accessibility for physical diversity in a mixed-use development project?

A.

Use high-contrast colours for signage and wayfinding

B.

Provide non-text diagrams and symbols for signage

C.

Create meeting spaces that accommodate mobility devices

Full Access
Question # 106

For WEp1: Water Metering and Reporting, the intent is to identify opportunities to manage future water savings. Water metering should:

A.

Include total water consumption for potable and alternative water sources

B.

Include submeters for mechanical equipment

C.

Include only indoor water consumption including manufacturing processes

D.

Provide separate data for indoor and outdoor water consumption

Full Access
Question # 107

Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

A.

Floor decking

B.

Asbestos insulation

C.

Exterior glazing

D.

Plumbing fixtures

Full Access
Question # 108

Which of the following actions should be taken to ensure that project teams understand and prioritize the selection of materials compliant with the Materials and Resources Credit, Building Product Disclosure and Optimization?

A.

Include the material requirements in the project specifications

B.

Select locally sourced and manufactured materials

C.

Include all building materials in a whole-building life-cycle analysis

D.

Procure materials directly from raw material suppliers

Full Access
Question # 109

Which of the following descriptions defines an Environmental Product Declaration (EPD) in the context of MRc4: Building Product Selection and Procurement?

A.

A third-party certification that guarantees a product is free of harmful chemicals and pollutants

B.

A verified document that provides transparent and standardized information about a product’s environmental impacts

C.

A self-declared statement regarding a material’s recycled content and manufacturing process

Full Access
Question # 110

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental ProductDeclarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Full Access
Question # 111

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

A.

Mercury containing lamps

B.

Contaminated soil or groundwater

C.

Asphalt construction waste

D.

Asbestos tile and glue

Full Access
Question # 112

What is the basis of energy consumption in determining the percentage of green power or carbon offsets?

A.

Quality

B.

Quantity

C.

Efficiency

D.

Performance

Full Access
Question # 113

A vegetated roof contributes to earning which of the following credits?

A.

Sustainable Sites Credit, Heat Island Reduction

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Sustainable Sites Credit, Site Assessment

D.

Sustainable Sites Credit, Light Pollution Reduction

Full Access
Question # 114

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

A.

At the main entrance, 10 ft. (3 m) from the door

B.

At the main entrance, 25 ft. (7.5 m) from the door

C.

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors

D.

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors

Full Access
Question # 115

While working on a 12,000 ft² (1,114.8 m²) medical building, a LEED AP asks the flooring manufacturer to submit the Environmental Product Declaration (EPD) for the flooring specified. The manufacturer doesn ' t have an EPD for their products, but all products meet ISO 14040/44 for Life Cycle Assessment (LCA). They ask if it would be acceptable to send the ISO 14040/44 LCA information in lieu of an EPD. How do you respond?

A.

Contact another manufacturer that has a comparable product with an EPD

B.

Exclude the flooring from the LEED credit as non-compliant

C.

Request recycled content information, as the ISO 14040/44 LCA is not sufficient for compliance

D.

Use the ISO 14040/44 LCA information just like an EPD to complete the documentation for the LEED credit

Full Access
Question # 116

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

A.

Measure densities within a 1/4 mi. (0.40 km) radius of the project boundary

B.

Measure densities within a 1/2 mi. (0.80 km) radius of the project boundary

C.

Measure densities within a 1/3 mi. (0.53 km) radius of the project boundary

D.

Measure densities within a 3/4 mi. (1.20 km) radius of the project boundary

Full Access
Question # 117

In the context of Core and Shell projects, which of the following strategies effectively aligns tenant spaces with LEED goals for sustainability?

A.

Mandating quarterly indoor air quality assessments for tenant areas

B.

Implementing a shared lighting control system throughout the entire building

C.

Developing comprehensive tenant guidelines outlining sustainable practices

Full Access
Question # 118

Which item is included in the reuse calculation for MRc1: Building and Materials Reuse?

A.

Roofing membranes

B.

Asbestos insulation

C.

Floor decking

D.

Exterior glazing

Full Access
Question # 119

How much value would these two doors contribute toward Material and Resources Credit, Building Product Disclosure and Optimization – Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

A.

$150.00

B.

$50.00

C.

$100.00

D.

$125.00

Full Access
Question # 120

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

A.

3%

B.

1%

C.

2%

D.

4%

Full Access
Question # 121

At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project ' s

A.

environmental zone

B.

longitude and latitude

C.

ASHRAE 90.1 - 2010 climate zone

D.

Environmental Protection Agency Phase I Assessment

Full Access
Question # 122

According to ASHRAE 90.1-2019, small commercial buildings under 25,000 ft² (2,323 m²) require energy monitoring:

A.

At 15-minute intervals for total project electricity use

B.

At least monthly for submetered end-use electricity

C.

At least monthly for whole-building energy use for each energy source

Full Access
Question # 123

A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of

supply air for the entire building flush-out?

A.

3,500,000 ft3 (99 108 m3)

B.

10,000,000 ft3 (283 168 m3)

C.

14,000,000 ft3 (396 435 m3)

D.

35,000,000 ft3 (991 089 m3)

Full Access
Question # 124

Which of the following design features helps ensure thermal safety in buildings during extreme heat events by allowing passive cooling?

A.

Double-glazed windows

B.

Operable windows

C.

High-performance insulation

Full Access
Question # 125

A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?

A.

Utility cost savings over the lifetime of the system must offset the higher initial cost

B.

Higher initial cost must exceed the cost of the utility over the lifetime of the system

C.

Higher initial cost must exceed the savings on the utility cost over the lifetime of the system

D.

Utility cost savings over the lifetime of the system must be lower than the higher initial cost of the system

Full Access
Question # 126

The Exemplary Performance threshold for Sustainable Sites Credit, Rainwater Management requires:

A.

Utilizing a rain garden to manage the 98th percentile rainfall event

B.

Managing 100% of rainfall that falls within the project boundary

C.

Achievement of both Option 1. Percentile of Rainfall Events and Option 2. Natural Land Cover Conditions

D.

Utilizing a combination of both structural and non-structural measures to manage the 98th percentile rainfall event

Full Access
Question # 127

During a design charrette, community neighbors raise a concern about potential glare resulting from a project ' s highly reflective roof. Which option should the LEED AP recommend to best address these concerns?

A.

Install a vegetative roofing system

B.

Change the design to reduce the amount of roofing area

C.

Change the roofing material to a dark material to eliminate the issue

D.

Increase the parapet height

Full Access
Question # 128

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

A.

Site Assessment

B.

Site Development - Protect or Restore Habitat

C.

Heat Island Reduction

D.

Light Pollution Reduction

Full Access
Question # 129

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

A.

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Full Access
Question # 130

A furniture manufacturer is designing a new line of office chairs and wants to ensure that the products align with circular-economy principles. Which of the following strategies should the manufacturer prioritize to align with the principles of material stewardship?

A.

Use virgin materials for all chair components to ensure reliability

B.

Implement a take-back program for end-of-life chairs

C.

Source only locally available materials to reduce transportation impacts

Full Access
Question # 131

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

The project team is designing the maternity ward to increase patient interaction with the vegetated terraces and green roof to promote healing and reduce recovery time. Which of the following credits or prerequisites can be achieved through this design approach?

A.

EQc2: Occupant Experience

B.

SSc1: Biodiverse Habitat

C.

IPp2: Human Impact Assessment

Full Access
Question # 132

A design team is evaluating strategies to ensure that a healthcare facility remains operational for critical services during frequent power outages. The building currently relies on a diesel generator for emergency power, but the owner is interested in sustainable alternatives that can also contribute to the project’s energy efficiency during normal operations.

Which of the following strategies should the design team recommend to provide energy resilience for the healthcare facility while enhancing energy efficiency during regular operations?

A.

Install a new natural-gas generator as the primary source of backup power

B.

Implement solar photovoltaic panels with a battery energy-storage system

C.

Increase the capacity of the existing diesel generator

Full Access