Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?
A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?
The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve
Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?
Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for
project development?
When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?
What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?
What phase of the integrative process gives the team the greatest chance of success in meeting the project's environmental goals cost-effectively?
The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)
An owner has requested that the project team redesign a large office building. As part of the redesign, the owner would like to move the main entrance to the opposite side of the building. Achievement of which credit may be affected by the move?
An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?
A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?
During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highlyreflective roof. Which option should the LEED AP recommend to best address these concerns?
What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?
A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?
Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?
When a project team sustainably develops a project site, the design should
Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?
The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team
decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor
Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?
Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?
Which of these is a method to assess the regional context of a building's design for sustainability?
Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the
conventional approach for rainwater management by
Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?
Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project's landscape water requirement be reduced by what percentage from the calculated baseline for the project site's peak watering month?
The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will
When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?
What is a benefit of including the public in a charrette for a new school before the pre-design phase?
Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?
A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?
Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?
A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?
A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this
project comply with Sustainable Sites Credit, Heat Island Reduction?
Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite,Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
When calculating the reverberation time of a room, which of the following pieces of information is least relevant?
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?
A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6
m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2)
of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be
physically accessible when calculating the Sustainable Sites Credit, Open Space?
A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green
Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to
meet the Option 2 requirements?
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?
What percentage of a building's surface area may be excluded from the calculation for Materials and ResourcesCredit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because ofdeterioration or damage when maintaining existing building structure, enclosure and interior structural elements?
What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?
The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction
Practices?
Which of the following characteristics are a requirement of a compliant water meter?
A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution. Which of the following suggestions should the LEED AP give to the project owner?
What LEED Building Design and Construction project type should exclude weekend transit service from the transit service level calculations for Location and Transportation Credit, Access to Quality Transit, if the project occupants do not commute to the building during weekends?
Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's
A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?
Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit,
Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?
Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?
A contractor wants to use an adhesive that exceeds the allowed Volatile Organic Compound (VOC) content limit under Indoor Environmental Quality Credit, Low Emitting Materials. This credit canbe earned if
A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?
An existing vacant office building will be completely renovated and new mechanical, electrical and plumbingsystems will be installed. 20% of the building's gross floor area will be complete at the time of certification. Therewill be a data center and some retail stores on the ground floor of the building at a future date. Which rating systemis applicable for the building?
A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?
Which of the following Sustainable Sites credits are eligible to be used as a campus approach?
The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?
A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?
Which of the following should be analyzed when pursuing an Integrative Design Process focusing on Energy-Related
Systems?
What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?
A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?
A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEEDbaseline. What does this mean to the team in terms of pursuing LEED?
A new school with a 20 car parking lot has set aside four preferred parking spaces for green vehicles. What else must the project team provide to achieve Location and Transportation Credit, Green Vehicles?