Question # 6

Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

A.

50,000 ft2 (4 645 m2) office project

B.

80,000 ft2 (7 432 m2) hospital project

C.

110,000 ft2 (10 219 m2) school project

D.

140,000 ft2 (13 006 m2) retail project

Full Access
Question # 7

Which of the following transit modes is considered to be walkable if it is within 1/2 mile (0.8 km) of the functional entry of a project?

A.

Taxi stand

B.

Ferry terminal

C.

Local bus stop

D.

Streetcar stop

Full Access
Question # 8

A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?

A.

Discounted rail pass availability

B.

Rail line station construction completion date

C.

Connections to transfer routes

D.

Passenger capacity

Full Access
Question # 9

Which of the following scenarios contributes to earning credit under MRc1: Materials and Resources, Option 2. Materials Reuse?

A.

Donate salvaged wood to a local nonprofit organisation that repurposes materials

B.

Reuse salvaged metal beams in the construction of the new project

C.

Sell recovered bricks to a salvage retailer for off-site reuse

Full Access
Question # 10

Which of the following strategies supports energy resilience by enhancing the grid interactivity of a building?

A.

Install smart meters to provide real-time data on energy consumption

B.

Install energy-storage systems that can deploy energy during peak-demand periods

C.

Use occupancy sensors to turn lights on and off automatically

Full Access
Question # 11

The design team for a school project finds that they can achieve an 18% savings in indoor water use from the baseline. If the team adds a rainwater harvesting system that reduces water use by another 10%, they can earn:

A.

Zero points because they have not fulfilled the Water Efficiency Prerequisite, Indoor Water Use Reduction

B.

Only the Water Efficiency Prerequisite, Indoor Water Use Reduction

C.

Two points for Water Efficiency Credit, Indoor Water Use Reduction

D.

One or two points for Water Efficiency Credit, Indoor Water Use Reduction depending on the type of metering installed

Full Access
Question # 12

A consultant specifies the required U-value, solar heat gain coefficient, and visible light transmittance for a project. What type of building envelope assembly would require these attributes?

A.

Floors

B.

Roofs

C.

Walls

D.

Windows

Full Access
Question # 13

What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?

A.

Permanently reduce the energy consumption in the building by 5%

B.

Demonstrate submetering of the two highest electrical end uses

C.

Demonstrate a load shift reduction of 5% in the building

D.

Create a comprehensive plan for meeting a demand response event

Full Access
Question # 14

A request to change the lighting fixtures in a conference room is made by a tenant. Which of the following credit scorecard changes will be directly and indirectly impacted by the change in lighting fixtures?

A.

Indoor Environmental Quality Credit, Interior Lighting and Sustainable Sites Credit, Light Pollution Reduction

B.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

C.

Energy and Atmosphere Credit, Advanced Energy Metering and Indoor Environmental Quality Credit, Daylight

D.

Indoor Environmental Quality Credit, Thermal Comfort and Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Full Access
Question # 15

When planning a water-efficient landscape design, the designer should consider including

A.

potable water

B.

sprinkler system

C.

native vegetation

D.

permeable pavement

Full Access
Question # 16

The current facilities requirements (CFR) and operations and maintenance plan (OMP) required for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification must include

A.

issue logs

B.

functional performance tests

C.

minimum outside air requirements

D.

installation verification (construction) checklists

Full Access
Question # 17

During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

A.

Innovation Credit, Innovation

B.

Integrative Process Credit

C.

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Full Access
Question # 18

Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by

A.

replicating a site's natural hydrology

B.

discharging rainwater at a faster rate

C.

increasing a site's impervious surface

D.

providing a greater volume of rainwater detention

Full Access
Question # 19

Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

A.

Floor decking

B.

Asbestos insulation

C.

Exterior glazing

D.

Plumbing fixtures

Full Access
Question # 20

Which of the following is an example of a diverse use as defined by Location and Transportation Credit, Surrounding Density and Diverse Uses?

A.

Automated Teller Machine (ATM)

B.

Informal day care

C.

Public park

D.

Private university gym

Full Access
Question # 21

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

A.

A sink in an office restroom

B.

A sink in a school classroom

C.

A sink in a hotel room bathroom

D.

A sink in a shared office restroom

Full Access
Question # 22

When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?

A.

Furnished, teacher speaking, HVAC operating at maximum flow rates

B.

Unfurnished, teacher speaking, HVAC operating at typical level

C.

Furnished, no occupants, HVAC operating at typical level

D.

Unfurnished, no occupants, HVAC operating at maximum flow rates

Full Access
Question # 23

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if

A.

the Phase II ESA uncovers suspected contamination

B.

contamination was identified by the certified facility

C.

the certified facility's Phase I ESA is older than 180 days

D.

the local equivalent standard is more stringent than ASTM E1527-05

Full Access
Question # 24

When designing a building that includes Electric Vehicle Supply Equipment (EVSE), which capability is needed to ensure maximum energy efficiency and cost savings?

A.

Install EVSE that operates only during peak hours to ensure availability

B.

Integrate EVSE with demand-response programs and load-management strategies

C.

Install Level 1 charging stations with 120-volt service for all spaces

Full Access
Question # 25

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

A.

Training requirements

B.

Allowable tolerance for facility operations

C.

Facility, system and assembly performance assumptions

D.

Environmental, energy efficiency and sustainability goals

Full Access
Question # 26

Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

A.

At least 6 ft. (2 m) above the floor

B.

At least 3 ft. (1 m) away from windows

C.

Between 3 ft. and 6 ft. (1 m and 2 m) above the floor

D.

On the ceiling 3 ft. (1 m) away from adjacent walls

Full Access
Question # 27

Which of the following methods is the referenced standard for demonstrating compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

A.

ASHRAE 62.2 - 2007

B.

ASHRAE 90.1 - 2010

C.

ASHRAE 55 - 2010

D.

ASHRAE 62.1 - 2010

Full Access
Question # 28

A new office-building project has implemented several water-saving strategies, achieving a 25% reduction in potable-water consumption through low-flow fixtures, efficient irrigation systems, and related measures. The project has also integrated a rainwater-harvesting system that contributes an additional 10% reduction in potable-water use.

The project team seeks to maximize its points under WEc2: Enhanced Water Efficiency by adopting the Whole-Project Water Use approach. How many total points can the project potentially earn for potable-water reduction, considering its use of alternative water sources?

A.

3

B.

2

C.

4

Full Access
Question # 29

An office project has the following items in its break room kitchen: a kitchen sink, a residential-style dishwasher, and a coffee machine. How would these items be addressed in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

The kitchen sink is included in fixture calculations, the dishwasher and coffee machine must be ENERGY STAR® or performance equivalent

B.

The kitchen sink is included in fixture calculations, the dishwasher must be ENERGY STAR® or performance equivalent, and the coffee machine is not included in the prerequisite

C.

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine is not included in the prerequisite

D.

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine should be included in fixture calculations

Full Access
Question # 30

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

A.

Design guidelines for orientation of parking garages along street frontages

B.

Minimum dimensions for on-street parking spaces required by the zoning code

C.

Building code standards for structured parking garages

D.

Minimum number of parking spaces required by the zoning code

Full Access
Question # 31

A project's massing and site orientation can have a direct impact on which of the following prerequisites?

A.

Minimum Energy Performance

B.

Minimum Indoor Air Quality Performance

C.

Construction Activity Pollution Prevention

D.

Fundamental Commissioning and Verification

Full Access
Question # 32

What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?

A.

1.05 gpf (4 lpf)

B.

1.19 gpf (4.5 lpf)

C.

1.23 gpf (4.66 lpf)

D.

1.32 gpf (5 lpf)

Full Access
Question # 33

The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

A.

Use MERV 8 (F5), or higher, filters

B.

Provide a hard-lid ceiling

C.

Create positive pressure in the room

D.

Provide a large opening to dilute air contaminates

Full Access
Question # 34

The Water Efficiency Prerequisite, Outdoor Water Use Reduction requires a reduction over a baseline that is calculated for the site:

A.

Over the entire year

B.

For the watering month

C.

For the average watering month

D.

Over the driest three-month portion of the year

Full Access
Question # 35

When a project team sustainably develops a project site, the design should

A.

increase water runoff

B.

maximize construction pollution

C.

remediate sites already in decline

D.

replace natural water flow patterns

Full Access
Question # 36

A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?

A.

Energy and Enhanced Commissioning

B.

Indoor Environmental Quality, Thermal Comfort

C.

Energy and Atmosphere, Optimize Energy Performance

D.

Indoor Environmental Quality, Interior Lighting

Full Access
Question # 37

Which of the following statements is correct when defining the project boundary?

A.

The LEED project boundary cannot include non-contiguous land

B.

The LEED project boundary cannot include more than one building

C.

The land associated with the project supports typical operation

D.

The gross floor area of the LEED project should be no less than 1% of the gross land area within the LEED project boundary

Full Access
Question # 38

A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?

A.

Utility cost savings over the lifetime of the system must offset the higher initial cost

B.

Higher initial cost must exceed the cost of the utility over the lifetime of the system

C.

Higher initial cost must exceed the savings on the utility cost over the lifetime of the system

D.

Utility cost savings over the lifetime of the system must be lower than the higher initial cost of the system

Full Access
Question # 39

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

A.

$75

B.

$150

C.

$750

D.

$1,500

Full Access
Question # 40

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Full Access
Question # 41

According to the Integrative Process Credit, Integrative Process, the goal-setting workshop should identify

A.

potential project sites

B.

targeted LEED credits

C.

expected water demand

D.

expected energy demand

Full Access
Question # 42

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

A.

Total fixture power

B.

Site area of the project

C.

Quantity of installed luminaires

D.

Total fixture lumens below 90 degrees

Full Access
Question # 43

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Full Access
Question # 44

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

A.

Owner

B.

Contractor

C.

Occupants

D.

Facility manager

Full Access
Question # 45

How much value would these two doors contribute toward Material and Resources Credit, Building Product Disclosure and Optimization – Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

A.

$150.00

B.

$50.00

C.

$100.00

D.

$125.00

Full Access
Question # 46

Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?

Full Access
Question # 47

Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Duration of use

B.

Building floor area

C.

Make and model of fixtures

D.

Proposed design fixture flow rates

Full Access
Question # 48

A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?

A.

Three years of free parking for green vehicles

B.

Preferred parking decals for 5% of occupants utilizing carpool vehicles

C.

A permanent discounted parking rate of at least 20% for all green vehicles

D.

An annual maintenance voucher for at least 5% of occupants driving green vehicles

Full Access
Question # 49

The Solar Reflectance Index (SRI) includes the measure of a material's

A.

color (shade of gray)

B.

ability to reflect solar radiation

C.

ability to absorb solar radiation

D.

ability to reflect thermal radiation

Full Access
Question # 50

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

A.

Light Pollution Reduction, Places of Respite, Open Space

B.

Heat Island Reduction, Places of Respite, Site Master Plan

C.

Direct Exterior Access, Heat Island Reduction, Rainwater Management

D.

Heat Island Reduction, Light Pollution Reduction, Rainwater Management

Full Access
Question # 51

Which of the following strategies will aid in reducing indoor water use?

A.

Design drip irrigation for landscape

B.

Use high-efficiency HVAC systems

C.

Exclude janitor closets in the building

D.

Optimize consumption of showerheads

Full Access
Question # 52

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

A.

The general contractor

B.

A LEED AP

C.

The project's mechanical engineer

D.

The owner or an owner's representative

Full Access
Question # 53

A critical factor in determining a project’s eligibility for LTc3: Compact and Connected Development, Option 2. Access to Transit, Path 1. Public Transit Service is the:

A.

Number of regularly scheduled weekend transit trips available

B.

Accessibility of safe sidewalks and pedestrian pathways

C.

Frequency of on-site shuttle services provided to the transit stop

Full Access
Question # 54

Which of the following descriptions defines an Environmental Product Declaration (EPD) in the context of MRc4: Building Product Selection and Procurement?

A.

A third-party certification that guarantees a product is free of harmful chemicals and pollutants

B.

A verified document that provides transparent and standardized information about a product’s environmental impacts

C.

A self-declared statement regarding a material’s recycled content and manufacturing process

Full Access
Question # 55

A core and shell project is located in a dense urban area that is known to have frequent fluctuations in the power supply grid (brown-outs). The project team is seeking LEED Platinum certification. Which credit should be pursued when considering the regional context?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Credit, Green Power and Carbon Offset

D.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Full Access
Question # 56

Large commercial buildings are most often dominated by

A.

internal loads

B.

lighting loads

C.

external loads

D.

envelope loads

Full Access
Question # 57

Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?

A.

ASHRAE 55-2010

B.

ASHRAE 62.1-2010

C.

ASHRAE 90.1-2010

D.

ASHRAE 189.1-2010

Full Access
Question # 58

Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

A.

earn Water Efficiency Credit, Water Metering

B.

earn Sustainable Sites Credit, Rainwater Management

C.

estimate and optimize water use in landscape designs

D.

estimate and optimize water use in outdoor fountains and pools

Full Access
Question # 59

To achieve SSc6: Light Pollution Reduction using the Backlight, Uplight, and Glare (BUG) Rating Method, projects must demonstrate that all luminaires:

A.

Meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

B.

Have a minimum correlated color temperature of 3,500 K

C.

Are mounted at least three mounting heights from the lighting boundary

D.

Are full-cutoff fixtures

Full Access
Question # 60

A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum

Energy Performance, what option is used?

A.

Whole building simulation

B.

EPA target finder rating tool

C.

Green-e Energy

D.

Advanced building core performance guide

Full Access
Question # 61

Which of the following design features helps ensure thermal safety in buildings during extreme heat events by allowing passive cooling?

A.

Double-glazed windows

B.

Operable windows

C.

High-performance insulation

Full Access
Question # 62

Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

A.

Retail

B.

Hospitality

C.

Core and Shell Development

D.

New Construction

Full Access
Question # 63

A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?

A.

Use ground source heat pump

B.

Install efficient plumbing fixtures

C.

Ergonomics design for classrooms and computer rooms

D.

Purchase all materials locally to minimize road transportation

Full Access
Question # 64

Which of the following management measures is used to minimize the spread of infection in indoor environments?

A.

Promote natural ventilation in maintenance areas

B.

Monitor and adjust indoor humidity levels only for occupant comfort

C.

Implement regular air-filtration system inspections and maintenance

Full Access
Question # 65

What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

A.

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided

B.

Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided

C.

Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

D.

Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Full Access
Question # 66

In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?

A.

One-way streets

B.

Bike share

C.

Slow speed roadways

D.

Traffic lights

Full Access
Question # 67

What aspects of each space should the LEED consultant consider to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits?

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Average number of occupants standing or seated

D.

Typical duration of occupancy in each space per day

Full Access
Question # 68

Which of the following features is commonly included in a building’s leak-detection system to enhance water efficiency?

A.

Real-time monitoring and alerts

B.

Water-use prediction algorithms based on weather data

C.

Monthly water-use analysis reports

Full Access
Question # 69

What is the reference standard that defines the requirements for LEED energy modeling?

A.

ASHRAE 62.1-2010

B.

Core Performance Guide

C.

ASHRAE Advanced Energy Design Guide

D.

ASHRAE 90.1-2010 Appendix G

Full Access
Question # 70

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:

A.

All luminaires have full cutoff fixtures

B.

All luminaires are mounted at least three mounting heights from the lighting boundary

C.

All luminaires have a minimum color temperature of 3500 K

D.

All luminaires meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

Full Access
Question # 71

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Office

B.

Hospital

C.

Warehouse

D.

Data Center

Full Access
Question # 72

Which of the following strategies is essential for a project to comply with EQc2: Occupant Experience, Option 1. Biophilic Environment?

A.

Incorporate the five principles adapted from The Practice of Biophilic Design

B.

Encourage positive interactions between people and nature

C.

Select only the most relevant principles adapted from The Practice of Biophilic Design

Full Access
Question # 73

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission his own installations and share the results with the project owner

C.

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.

The building's mechanical engineer should commission his own installations and share the results with the project owner

Full Access
Question # 74

Which of the following is an example of a nonroof measure for Sustainable Sites Credit, Heat Island Reduction?

A.

A playground with artificial turf

B.

A vegetated shading structure

C.

A shade structure with a three-year aged Solar Reflectance Index (SRI) value of 0.2

D.

A paving material with a three-year aged SRI value of 0.2

Full Access
Question # 75

In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for

both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?

A.

Flooring

B.

Furniture

C.

Composite wood

D.

Wet applied products

Full Access
Question # 76

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

A.

Site's impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Full Access
Question # 77

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

A.

12,500 ft2 (1 160 m2)

B.

15,000 ft2 (1 400 m2)

C.

25,000 ft2 (2 300 m2)

D.

35,000 ft2 (3 250 m2)

Full Access
Question # 78

An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

A.

Four points for Water Efficiency Credit, Indoor Water Use Reduction

B.

Zero points because the Water Efficiency Prerequisites are not met

C.

One point for Water Efficiency Credit, Outdoor Water Use Reduction

D.

One point for Water Efficiency Credit, Outdoor Water Use Reduction and four points for Water Efficiency Credit, Indoor Water Use Reduction

Full Access
Question # 79

Which of the following standards is used to perform a Whole-Building Life-Cycle Assessment to measure the Global Warming Potential of materials in LEED projects?

A.

ISO 50001:2018

B.

ISO 14044:2006

C.

ISO 21930:2017

Full Access
Question # 80

Which would contribute to compliance with Sustainable Sites Credit, Open Space?

A.

A mall with an indoor atrium, featuring a reflective roof

B.

A parking lot that serves as the location for a monthly flea market

C.

An intensive vegetated roof, provided the building has at least a 1.0 Floor to Area Ratio (FAR)

D.

A forested area containing nature trails, that also achieves Sustainable Sites Credit, Site Development – Protect or Restore Habitat

Full Access
Question # 81

A vegetated roof contributes to earning which of the following credits?

A.

Sustainable Sites Credit, Heat Island Reduction

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Sustainable Sites Credit, Site Assessment

D.

Sustainable Sites Credit, Light Pollution Reduction

Full Access
Question # 82

In an area where carbon-emission regulations are becoming progressively stricter, the goal is to future-proof the building for complete electrification and eliminate on-site fossil-fuel combustion. Which of the following measures can the project team use to maximize the building’s readiness for electrification while minimizing on-site combustion sources?

A.

Install natural-gas boilers as a backup heating source

B.

Plan for an electric heat-pump water-heating system

C.

Integrate rooftop solar panels to generate renewable electricity on-site

Full Access
Question # 83

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

A.

Entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year

B.

Within a floodplain subject to a 3% or greater chance of flooding every other year

C.

Outside any floodplain subject to a 2% or greater chance of flooding in any given 5-year period

D.

Entirely outside any floodplain subject to a 3% or greater chance of flooding in any given 10-year period

Full Access
Question # 84

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

A.

6 months

B.

12 months

C.

24 months

D.

36 months

Full Access
Question # 85

Which of the following is omitted from the assessment while performing preliminary energy modeling?

A.

Massing and orientation

B.

Thermal comfort ranges

C.

Supply sources

D.

Plug and process loads

Full Access
Question # 86

A new mixed-use development includes residential units and commercial spaces. The project is in an urban area with existing pedestrian paths and public transportation infrastructure. How can the project team minimize exposure to emissions from vehicle traffic around the property while ensuring compliance with LEED strategies?

A.

Establish mandatory carpooling arrangements for residents and employees

B.

Integrate indoor plants to absorb carbon dioxide

C.

Designate a no-idling zone around the building perimeter

Full Access
Question # 87

Which of the following pairs of strategies can help reduce the landscape water demand beyond the prerequisite level in Water Efficiency Credit, Outdoor Water Use Reduction?

A.

Mulched paths and weather sensor controls

B.

Artificial turf grass and alternative water sources

C.

Plant species selection and permeable pavement

D.

Alternative water sources and smart scheduling technology

Full Access
Question # 88

The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.

What credits should the LEED AP suggest to meet this goal?

A.

Sustainable Sites Credit, Heat Island Reduction and Location and Transportation Credit, Bicycle Facilities

B.

Location and Transportation Credit, Access to Quality Transit and Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses and Sustainable Sites Credit, Open Space

D.

Location and Transportation Credit, Reduced Parking Footprint and Location and Transportation Credit, Access to Quality Transit

Full Access
Question # 89

A design team is working on a new building project and is employing an integrated, whole-building approach. The architects want to increase the size of a glazed opening on the south facing wall. Which team members are first

affected by this change?

A.

Civil engineers

B.

Facility managers

C.

Landscape architects

D.

Mechanical engineers

Full Access
Question # 90

Which of the following products must always be included in Materials and Resources credits?

A.

Faucets

B.

Furniture

C.

Interior Paint

D.

Fire suppression system

Full Access
Question # 91

During preliminary energy analysis, what energy reduction strategies can best help in reducing the energy load in the new building construction project?

A.

Green roof

B.

Site conditions

C.

Massing and orientation

D.

Programmatic and operational parameters

Full Access
Question # 92

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an "anticipated" credit

Full Access
Question # 93

Which of the following credits advocates the values and benefits of green building design and construction as well as outdoor physical activity?

A.

Sustainable Sites Credit, Light Pollution Reduction

B.

Sustainable Sites Credit, Open Space

C.

Environmental Quality Credit, Quality Views

D.

Location and Transportation Credit, Reduced Parking Footprint

Full Access
Question # 94

For Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan, which of the following

items is required for credit compliance?

A.

MERV 13 (F7) filtration media

B.

Indoor Environmental Quality test results

C.

Photographic documentation

D.

Separating construction waste

Full Access
Question # 95

Which of the following components is critical for developing a successful water-balance model for WEc2: Enhanced Water Efficiency, Option 1. Whole-Project Water Use?

A.

Identify all end uses within the project scope, including fixtures and fittings

B.

Prioritise alternative water sources to offset overall water demand

C.

Require equipment specifications to align with the contract documents

Full Access
Question # 96

U.S. Green Building Council (USGBC)'s vision for using LEED internationally includes

A.

allowing more stringent credit requirements for countries outside of the U.S. so that all projects can achieve LEED

B.

creating multiple LEED rating systems for different countries

C.

modifying U.S. reference standards, such as ASHRAE 90.1, to be more appropriate for regions outside the U.S.

D.

providing opportunities for alternative compliance paths that meet the unique needs of a particular region

Full Access
Question # 97

Commissioning (Cx) and verification are requirements to qualify for LEED certification. What are the basic systems that need to be commissioned?

A.

Electrical, Mechanical, Plumbing, and Renewable Energy

B.

Electrical, Structural, Mechanical, and Lighting

C.

Electrical, Structural, Audio Visual, and Envelope

D.

Electrical, Plumbing, Telecommunications, and Fire Suppression

Full Access
Question # 98

A design team is evaluating strategies to ensure that a healthcare facility remains operational for critical services during frequent power outages. The building currently relies on a diesel generator for emergency power, but the owner is interested in sustainable alternatives that can also contribute to the project’s energy efficiency during normal operations.

Which of the following strategies should the design team recommend to provide energy resilience for the healthcare facility while enhancing energy efficiency during regular operations?

A.

Install a new natural-gas generator as the primary source of backup power

B.

Implement solar photovoltaic panels with a battery energy-storage system

C.

Increase the capacity of the existing diesel generator

Full Access
Question # 99

Which of the following credit categories identifies environmental issues that are most relevant for a project's chapter area or country?

A.

Location and Transportation

B.

Energy and Atmosphere

C.

Sustainable Sites

D.

Regional Priority

Full Access
Question # 100

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

A.

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

Full Access
Question # 101

Which of the following strategies enhances energy resilience by ensuring that critical loads are powered during a grid outage?

A.

Increase insulation in the building envelope

B.

Install a battery energy-storage system

C.

Implement energy-efficient lighting

Full Access
Question # 102

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

A.

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Full Access
Question # 103

A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?

A.

Track waste materials per occupant

B.

Track waste materials used on site

C.

Document total waste by project cost

D.

Document total waste per building floor area

Full Access
Question # 104

Questions 1–5 are based on the same project scenario. Please use the scenario information when answering.

A hospital certified under LEED V5 in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?

A.

Platinum

B.

Gold

C.

Silver

Full Access
Question # 105

A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials

B.

Materials and Resources Prerequisite, Construction and Demolition - Waste Management Planning

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Full Access
Question # 106

What is the definition of the evapotranspiration rate?

A.

Evaporation of onsite reuse water

B.

Percentage of potable water usage for irrigation

C.

Water loss from evaporation in micro irrigation systems

D.

Amount of water loss in a vegetated surface in units of water depth

Full Access
Question # 107

For minimum acoustic performance, peak-hour is defined as M

A.

lowest noise level over a specified sample time

B.

highest noise level over various periods of time

C.

an energy-average of the noise level over a specified sample time

D.

an energy-average of noise level divided by total sample time and area of the space

Full Access
Question # 108

A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much

outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?

A.

60,000 ft2 (5 574 m2) of outdoor space of which 15,000 ft2 (1 394 m2) must be vegetated

B.

60,000 ft2 (5 574 m2) of outdoor space of which 50,000 ft2 (4 645 m2) must be vegetated

C.

72,000 ft2 (6 689 m2) of outdoor space of which 18,000 ft2 (1 672 m2) must be vegetated

D.

72,000 ft2 (6 689 m2) of outdoor space of which 60,000 ft2 (5 574 m2) must be vegetated

Full Access
Question # 109

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Full Access
Question # 110

Which of the following are all considered regular building occupants?

A.

Staff, primary/secondary students, volunteers, and residents

B.

Staff, primary/secondary students, higher education students, and residents

C.

Higher education students, retail customers, periodic volunteers, and visitors

D.

Residents, volunteers, retail customers, and staff

Full Access
Question # 111

A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED

AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

A.

Airport flyover maps, mechanical plans, wall sections

B.

Patient records, wall sections, ceiling panel cut sheets

C.

Occupancy statistics, patient records, MRI machine specifications

D.

MRI machine specifications, mechanical plans, occupancy statistics

Full Access
Question # 112

In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?

A.

HVAC air system for air conditioning

B.

Electrical lighting system during peak use hours

C.

Water flow system used for public faucets and toilets

D.

Condenser water system with a cooling tower and condenser water pumps

Full Access
Question # 113

What percentile of runoff from a regional development of an office building must a project manage on site by using low-impact development and green infrastructure to achieve three points under the Sustainable Sites Credit-Rainwater Management, Option 1. Percentile of Rainfall Events?

A.

98th percentile

B.

85th percentile

C.

95th percentile

D.

100th percentile

Full Access
Question # 114

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a post office and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Full Access
Question # 115

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

A.

3%

B.

1%

C.

2%

D.

4%

Full Access
Question # 116

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental Product

Declarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Full Access
Question # 117

The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if

A.

the parcels are used for temporary uses such as parking or staging that is owned and managed by a third party

B.

the parcels directly support or are associated with normal building operations and are accessible to the project's occupants

C.

the parcels are part of an existing public preservation easement or resource protection area that is directly adjacent to the LEED project boundary

D.

the parcels are part of a land trust or conservation organization for which the LEED project provides financial support for in the Sustainable Sites Credit, Site Development Credit, Protect or Restore Habitat, Option 2. Financial Support

Full Access
Question # 118

Location and Transportation Credit, Reduced Parking Footprint calculations must include

A.

motorbike spaces

B.

on-street parking in public rights-of-way

C.

parking within 1/4 mi. (0.40 km) radius of the project boundary

D.

parking outside the project boundary but used by the project

Full Access
Question # 119

What information must be provided to demonstrate compliance with the Owner’s Project Requirements (OPR)?

A.

Preliminary data collection

B.

Basis of Design (BOD)

C.

Design charrette plan

D.

Renewable Energy Certificates (RECs)

Full Access
Question # 120

Which of the following ventilation strategies is essential for maintaining acceptable indoor air quality while balancing energy use?

A.

Natural ventilation through operable windows

B.

Mechanical ventilation with heat recovery

C.

Underfloor air-distribution systems

Full Access
Question # 121

Which of the following types of water should a project team focus on utilizing to achieve water savings and acquire points under WEc2: Enhanced Water Efficiency, Option 6. Water Reuse, Path 1. Reuse-Ready System, while reducing reliance on potable water?

A.

Desalinated ocean water provided by a utility company

B.

Graywater collected and treated on-site

C.

Harvested and stored rainwater

Full Access