Year End Sale - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpt65

C_TSCM42_67 Questions and Answers

Question # 6

Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)

A.

Batch size optimization

B.

Midpoint scheduling

C.

Lot size optimization

D.

Finite capacity scheduling

E.

Setup time reduction

Full Access
Question # 7

Which property applies for consumption with planning strategy 40 (planning with final assembly)?

A.

Consumption can result in subsequent adjustments of planned receipts.

B.

Consumption can reduce the originally planned production quantity.

C.

Consumption takes place with the planning material.

D.

Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.

Full Access
Question # 8

In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:

- Start: 7:00:00 a.m.

- End: 3:00:00 p.m.

- Break duration: 1 hour

- Rate of utilization: 80%

- Overload: 110%

- Number of individual capacities: 1

How large is the standard available capacity?

A.

8 hours

B.

5.6 hours

C.

6.16 hours

D.

7 hours

Full Access
Question # 9

In which of the following objects can you activate back flushing for production orders? (Choose three)

A.

Work center

B.

Routing

C.

Material master (finished product)

D.

Material master (component)

E.

Production scheduling profile

Full Access
Question # 10

Where can you define the valid receivers for production order costs?

A.

In the costing variant

B.

In the settlement profile

C.

In the valuation variant

D.

In the production scheduling profile

Full Access
Question # 11

Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

A.

Standard values (routing)

B.

In-house production time (material master)

C.

Transport time (routing)

D.

Formulas (work center)

E.

Operation control key (routing)

Full Access
Question # 12

An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).

What is the easiest way to fulfill this requirement?

A.

Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.

B.

Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.

C.

Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.

D.

There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.

Full Access
Question # 13

For which of the following objects can you enter a confirmation? (Choose two)

A.

Work Center

B.

Production order operation

C.

Production order

D.

Trigger Point

Full Access
Question # 14

When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.

What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?

A.

Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.

B.

Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.

C.

Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.

D.

Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.

Full Access
Question # 15

When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)

A.

General values from work scheduling view in the material master

B.

Standard value from operation in task list

C.

User-defined field from operation in task list

D.

General operation values in task list

E.

General item values in bill of materials

Full Access