C_TS422_2020 Questions and Answers

Question # 6

How would you define pegging in the context of Advanced Planning?

A.

An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.

B.

An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.

C.

An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.

D.

An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.

Full Access
Question # 7

Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

There are 2 correct answers to this question.

A.

Simultaneous

B.

100% check

C.

By usage probability

D.

First in first out (FIFO)

Full Access
Question # 8

What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question.

A.

Default values for the item status

B.

Allowed material type

C.

Default unit of measure

D.

Maximum allowed low-level code

Full Access
Question # 9

Which task list types can have parallel sequences? There are 2 correct answers to this question.

A.

Routings (N)

B.

Master recipes (2)

C.

Rate routings (R)

D.

Reference operation sets (S)

Full Access
Question # 10

Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

A.

Work center

B.

Material

C.

Production version

D.

Plant

Full Access
Question # 11

In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.

A.

Production version

B.

Production cost collector

C.

Routing

D.

Repetitive manufacturing profile

Full Access
Question # 12

Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question.

A.

Elimination of document index tables

B.

Elimination of status tables

C.

Elimination of customer master tables

D.

Elimination of output condition tables

E.

Elimination of LIS tables for rebates

Full Access
Question # 13

Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.

A.

MRP Live can priorities demand from sales orders

B.

MRP Live can propose alternative solutions

C.

MRP Live can create production orders automatically

D.

MRP Live can plan materials with recursive BOMs

Full Access
Question # 14

You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

A.

Make-to-order production (20)

B.

Planning without final assembly (50)

C.

Planning with final assembly (40)

D.

Planning at assembly level (70)

Full Access
Question # 15

In which data objects do you maintain the production in as the work center for repetitive manufacturing?

There are 2 correct answers to this question.

A.

Routing

B.

Repetitive manufacturing profile

C.

Production version

D.

Production cost collector

Full Access
Question # 16

What does a line hierarchy in repetitive manufacturing represent?

A.

A production line with a parallel sequence in the routing

B.

A production line with an alternative sequence in the routing

C.

A production line with prioritized alternative work centers

D.

A production line with more than one work center

Full Access
Question # 17

In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

A.

MRP type

B.

MRP group

C.

MRP controller

D.

MRP planning file

Full Access
Question # 18

What are pillars of SAP Activate?

There are 2 correct answers to this question.

A.

SAP Best Practices

B.

SAP MaxAttention

C.

Guided Configuration

D.

Premium engagement

Full Access
Question # 19

What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.

A.

Comparison of current data with historical data to identify trends

B.

Automatic update of story boards

C.

Strategic analysis

D.

Real time decision support

Full Access
Question # 20

What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.

A.

Only the OLAP system has a predefined subset of the data

B.

Multiple copies of the data exist

C.

Batch process are required to keep OLTP and OLAP in sync

D.

The OLAP system needs to write back the data to the OLTP system

E.

Only the OLAP system has the latest data

Full Access
Question # 21

You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

A.

When you create a sales order

B.

When you deliver a sales order

C.

When the MRP results are saved

D.

When you create a planned order

Full Access
Question # 22

Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

A.

Inspection during production

B.

Planning

C.

Engineering change management

D.

Implementation