Question # 6

Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.

A.

Increase the use of incremental lot size beyond the frozen horizon.

B.

Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.

C.

Avoid using telescopic time buckets.

D.

Keep the number of fairshare segments small.

E.

Split into multiple planning areas to support weekly vs. daily planning needs.

Full Access
Question # 7

Forecast Error CV is an input to which of the following?

A.

Time-Series-Based Supply Planning Optimizer

B.

Calculate Target Inventory Components in Inventory Planning Profile Operator

C.

Forecast Error Calculation in Inventory Planning Profile Operator

D.

Multistage Inventory Optimization in Inventory Planning Profile Operator

Full Access
Question # 8

You want to display and edit data in different Units of Measure (UOM).Which of the following must you consider before you use the UOM?Note: There are 3 correct answers to this question.

A.

Units of measure are usually not time-dependent.

B.

Unit of measure is an attribute of a master data type, such as Product.

C.

Units of measure are usually not time-independent.

D.

Analytics provide the user with the option to select the target unit ofmeasure.

E.

Conversion to the target unit of measure is handled by SAP IBP Excel UI

Full Access
Question # 9

Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to thisquestion.

A.

Decoupling Points determination in SAP IBP for demand-driven replenishment

B.

Supply Heuristics in SAP IBP for sales and operations

C.

Charts creation in SAP Supply Chain Control Tower

D.

Demand Sensing with Gradient Boosting (Full)

Full Access
Question # 10

You need to define a new logic for a key figure to drive values from thePERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.

A.

Splitting the values from aggregated to detailed level, based on the time profile attribute

B.

Splitting the values from aggregated to detailed level, based on a stored split-factor key figure

C.

Splitting the values from aggregated to detailed level using multiplication by the proportions

D.

Splitting the values from detailed toaggregated level by using a copy operator

Full Access
Question # 11

Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.

A.

A special key figure marked as an aggregate key figure (aggregate constraint)

B.

A currency conversion key figure, such as exchangerate

C.

A unit of measure key figure, such as UOMCONVERSIONFACTOR

D.

A forecast metric key figure, such FCSTMAPE

Full Access
Question # 12

You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.

A.

The name of the realignment step should be no longer than 20 characters.

B.

You must mark the realignment step as "shared" andassign the steps to users.

C.

The number of steps in the realignment run is limited to 255.

D.

A realignment step can change master data, planning objects and key figures.