H19-260_V2.0 Questions and Answers

Question # 6

Which of the following is not a key SQA role? ( )

A.

Customer voice feedback provider

B.

Safety and quality culture builder

C.

Safety and quality requirement practitioner

D.

Safety and quality result guardian

Full Access
Question # 7

Which of the following statements about the 2024 sales partner certification grace period management rules are correct?

A.

Grace period for new/upgraded certification: If the capability does not meet the requirements temporarily, the grace period cannot be applied for.

B.

Grace period for new/upgraded certifications: Meet the performance threshold requirements of the corresponding level in 2024, or the admission requirements of partners at the same level or higher in the industry.

C.

Review the capabilities on the second day after the grace period ends. If the certification threshold for 2024 is not reached, the employee will be downgraded.

D.

Expiration date of the grace period: not more than 6 months and not more than March 1 of the following year.

E.

Grace period for renewing the certification: The entry requirements for the performance threshold for the 2024 certification level must be met.

Full Access
Question # 8

Which of the following is not a feature of the residential PV+ESS on-grid scenario?

A.

Grid-connected residential PV+ESS system

B.

Composed of PV and ESS systems

C.

Unstable mains or frequent power outages

Full Access
Question # 9

According to the training materials, which phase of safety management is described by the following statement? Statement: "The management layer makes safety commitments. Safety personnel can be a deterrent to employees. Safety rules and procedures are in place. Safety supervision and accident control are emphasized.” ( )

A.

By instinct

B.

Team management

C.

Self-management

D.

Supervision and management

Full Access
Question # 10

Microgrids can be regarded as UPSs, which ensure uninterrupted power supply for loads.

A.

True

B.

False

Full Access
Question # 11

What are the challenges facing enterprises in building photovoltaic?

A.

Distributed power plants cannot be managed in a unified manner.

B.

Unable to make full use of roof area

C.

High efficiency modules are not available

D.

Poor development quality of PV power plants and many faults

E.

Hidden safety hazards of power station system

Full Access
Question # 12

Huawei residential PV-only solution does not include the optimizer.

A.

True

B.

False

Full Access
Question # 13

Huawei inverters support L4 intelligent arc protection, and the maximum arc detection range is 80 m.

A.

True

B.

False

Full Access
Question # 14

Huawei smart microgrid switch time between on grid and off grid is claimed?

A.

300ms

B.

20ms

C.

150ms

D.

200ms

Full Access
Question # 15

Which of the following is not a key activity for the SQA key role as a "continuous improvement pusher"? ( )

A.

Focus on the safety and quality results of product delivery and O & M, be target-oriented, and carry out safety and quality planning. Ensure that no safety accident and quality accident occur.

B.

Establish and implement the continuous improvement mechanism, instruct service personnel to apply scientific safety and quality engineering methods for analyzing problems and making improvement.

C.

Establish an incentive mechanism for continuous improvement, and regularly summarize and commend continuous improvement work.

D.

Regularly organize efforts to identify safety and quality improvement points and drive the continuous improvement of business.

Full Access
Question # 16

At least one HCSP-Presales-Smart PV (Commercial & Industrial) is required for the P-level certificate for the VAP pre-sales certification.

A.

True

B.

False

Full Access
Question # 17

Which of the following techniques can detect and diagnose battery thermal runaway risks?

A.

Battery rack controller

B.

Battery pack optimizer

C.

String PCS

D.

Cloud BMS+intelligent internal short circuit detection

Full Access
Question # 18

An accident in data center A interrupted many network services, including popular chat software and a mainstream e-commerce platform, for more than 24 hours, and 32,000 servers broke down, affecting services for tens of millions of users. The country's president apologized to the public for the disruption to services on online platforms.

A.

True

B.

False