Activate Your Black Friday Offer: 75% Discount on Exam Bundles! Use coupon code below! - Ends in 0d 00h 00m 00s - Coupon code: 75onlydt

HPE7-V01 Questions and Answers

Question # 6

Your customer plans to replace a legacy HPE BladeSystem solution with the HPE Synergy platform.

The customer requirements include:

    30 compute nodes to support their virtualization workloads

    Redundancy within the management subsystem

    An in-frame storage solution to support vSAN

    A redundant networking subsystem with the ability to virtualize WWNs

    Simplified management with a single logical enclosure

You are reviewing the following proposal:

    3 x HPE Synergy 12000 frames

    2 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE D3940 Storage Modules with maximum number of drives

    6 x HPE Composer2 + 30 x HPE OneView Advanced licenses

    30 x SY 480 Gen11 compute modules, each with 2 CPUs and appropriate mezzanine cards

Which statement about this proposal is true to help meet the customer requirements?

A.

Additional HPE OneView Advanced licenses should be added for the HPE Virtual Connect modules and HPE D3940 Storage Modules.

B.

30 x HPE OneView Advanced licenses should be removed from the proposal.

C.

HPE 32Gb switches should be added to the proposal to enable WWNs virtualization and profile mobility.

D.

3 x HPE Composer2 modules can be removed from the proposal, as you need one HPE Composer2 module per HPE Synergy frame for enhanced availability.

Full Access
Question # 7

Your customer is requesting an update to their data protection plan, to include a copy of several volumes to two different locations. The current environment is utilizing HPE Alletra Storage MP B10000 systems.

What is true about this solution?

A.

Synchronous replication can be used to define two destination targets, when appropriate license is installed.

B.

Synchronous replication can be configured between three arrays.

C.

Asynchronous replication can be configured between three arrays.

D.

A synchronous long-distance periodic copy configuration can be used to define two destination targets.

Full Access
Question # 8

A customer needs a data protection solution to support workloads running on an HPE Alletra MP B10000 storage array. Their requirements include:

    Protecting VMware vSphere workloads

    Conversion between hypervisors

    Pay-per-use model

    Near synchronous and block-level replication

Which solution is the most appropriate choice?

A.

HPE Alletra Storage Server 4120

B.

HPE StoreOnce 3660

C.

HPE Data Ops Manager

D.

HPE Zerto

Full Access
Question # 9

A customer is preparing for a server refresh and intends to use HPE ProLiant DL360 Gen11 servers configured with CPUs that exceed 270 watts of power usage. The customer has existing 19", 42U, air-cooled racks that they plan to reuse.

Which cooling option will allow the customer to use these servers with their existing racks, with the least amount of changes to the setup?

A.

Use of liquid-cooled racks

B.

Use of high performance fans

C.

Use of direct liquid cooling

D.

Use of closed-loop liquid cooling

Full Access
Question # 10

You are designing a solution for a customer that will support a virtualization workload based on HPE Synergy. Your customer has the following requirements:

    Dual-socket HPE Synergy compute nodes running ESXi 8.x with maximum memory supported

    Each node should have access to shared storage from HPE Alletra Storage MP B10000

    All virtual machines should be protected against host failure

    All virtual machines with vGPU must be protected with Fault Tolerance

    All compute nodes should boot from disks located in the D3940 Storage Modules protected with RAID 1

    All frames should be managed as one logical enclosure to simplify management

    All compute nodes should support two network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that you must verify. The proposal consists of:

    3 x HPE Synergy 12000 frames

    2 x HPE Synergy Composer2 modules

    4 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE Synergy D3940 Storage Modules, each with 20 SSD drives

    1152 core VMware vSphere Enterprise Plus subscriptions

    36 x HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

    A single Platinum CPU with 32 cores

    HPE Synergy 6820C 25/50Gb Converged Network Adapter

    HPE Synergy 5830C 32Gb Fibre Channel Host Bus Adapter

    HPE MR416i-o Gen11 12G SAS Mezzanine Controller

Which two statements are true regarding the proposal? (Select two.)

A.

2 HPE Synergy 50Gb Interconnect Link Modules should be removed from the proposal, as the total number of interconnects required is six.

B.

HPE MR416i-o Smart RAID controller can be removed because there are no external SAS disk enclosures included in the proposal.

C.

Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy can be removed from the proposal because all requirements are met without them.

D.

To access HPE Alletra MP B10000 arrays, FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Modules for Synergy must be purchased.

E.

vSphere Enterprise Plus subscriptions can be replaced with vSphere Standard subscriptions.

Full Access
Question # 11

A customer wants a hardware platform to run a SAP HANA workload and is evaluating HPE Superdome Flex, HPE Synergy, and HPE ProLiant systems.

Which statement about these hardware platforms is true for a SAP HANA solution?

A.

HPE Superdome Flex can scale-up to 32 sockets and 48 TB of memory for SAP HANA and provides full support for HPE Persistent Memory.

B.

HPE Superdome Flex provides higher scalability, while HPE Synergy systems provide better reliability, availability, and serviceability features.

C.

HPE ProLiant DL560 Gen10 is delivered as a SAP HANA appliance, but it is also supported in the TDI model and fully supports HPE Persistent Memory.

D.

HPE Serviceguard for Linux licenses are attached to each HPE Superdome Flex chassis and provides lower cost for a HA solution for SAP HANA.

Full Access
Question # 12

Your customer plans to deploy multiple virtual machines running database workloads. They plan to re-use and extend an existing Synergy, 3PAR, and VMware infrastructure.

What is true regarding a possible upgrade?

A.

HPE OneView for VMware vCenter can be used to deploy additional ESXi hosts.

B.

HPE OneView for Ansible Orchestrator can be used to deploy the operating system to new ESXi hosts.

C.

HPE 3PAR cannot be used with VMware infrastructure running on Synergy.

D.

HPE OneView can be used for rapid VM deployment.

Full Access
Question # 13

You are designing a VMware Virtual Cloud Foundation solution for a customer who wants to host it in a colocation datacenter. The customer does not want to purchase the hardware, so you are proposing an HPE GreenLake for a VCF solution.

Which statement is true of this design?

A.

HPE GreenLake for VCF must include an HPE Alletra Storage MP B10000.

B.

Expansion of the solution is possible per number of bare metal servers only.

C.

HPE GreenLake for VCF allows customers to get VCF with a pay-per-use model.

D.

HPE GreenLake for VCF must be hosted in an HPE managed datacenter.

Full Access
Question # 14

Your customer wants to implement a disaster recovery solution for their virtualization workload. They also want to implement a protection method that will protect the workload in case of a site failure.

Their existing environment includes the following configurations:

    All ESXi systems are located in the same datacenter

    vSphere replication is deployed for VM DR

    Some of the VMs are protected with Fault Tolerance

    HPE Synergy 480 Gen11 is a compute platform

    HPE Alletra Storage MP B10000 arrays for storage

    Orchestrated failover for all VMs using VMware tools

The customer plans to replicate the same setup at the second site. The total number of virtual machines that must be protected is 200. Your customer also expects an RPO of 0.

Which component or configuration is a necessary part of a solution that will meet all customer requirements?

A.

HPE Synergy frames from the secondary site added to the logical enclosure configured in the primary site.

B.

Storage policy-based management (SPBM) must be configured for a group of the virtual machines.

C.

Synchronous replication configured between sites to replicate the volumes used to build the datastores.

D.

Asynchronous replication configured between sites used to replicate the volumes used to build the datastores.

Full Access
Question # 15

Your customer is planning to deploy several HPE ProLiant DL360 Gen11 servers with Windows Server 2025, for a bare-metal use case with no hypervisors.

The customer is concerned about the time it takes to scan and deploy the servers for new firmware and driver updates.

What HPE management tool can be used in this scenario to apply firmware updates to servers, with direct integration to HPE repositories?

A.

HPE OneView

B.

HPE Compute Ops Management

C.

HPE iLO Amplifier

D.

Microsoft Endpoint Configuration Manager

Full Access
Question # 16

Your customer has HPE Superdome Flex running VMware ESXi 8.x. Current setup consists of:

    One Rack Management Controller

    One HPE Superdome Flex Base chassis

    One HPE Superdome Flex Expansion chassis

The existing complex has a single nPartition. The customer plans to expand the existing nPartition with two additional expansion chassis.

Which statement about the planned expansion is true?

A.

If the existing nPartition is managed using HPE OneView, it must be removed before an expansion.

B.

Customer has to replace one of the expansion chassis with base chassis, to provide I/O redundancy.

C.

In order to add two additional chassis, customer has to power off the existing nPartition.

D.

Existing nPartition must be placed in the maintenance mode using Rack Management Controller CLI.

Full Access
Question # 17

Your customer is in the early stages of an AI project. They are requesting a POC demonstrating how they can utilize on-prem data with a limited amount of rack space, in an air-cooled environment.

Performance with the AI use case of Retrieval-Augmented Generation (RAG) will be the primary factor in their decision making.

Which HPE Compute offering would be suitable in this scenario?

A.

HPE ProLiant Compute DL380a Gen12 with NVIDIA H200 NVL GPUs.

B.

HPE ProLiant Compute DL384 Gen12 with NVIDIA GH200 NVL2.

C.

HPE ProLiant Compute DL320 Gen11 with NVIDIA L4 GPUs.

D.

HPE Cray XD670 with NVIDIA H200 Tensor Core GPUs.

Full Access
Question # 18

Your customer wants to implement a disaster recovery solution for their virtualization workload. They also want to implement a protection method that will protect the workload in case of a site failure.

Their existing environment includes the following configurations:

    All ESXi systems are located in the same datacenter

    Virtual machines are protected by an HA cluster

    Some of the VMs are protected with Fault Tolerance

    HPE Synergy 480 Gen11 is the compute platform

    HPE Alletra Storage MP B10000 array for storage

    Orchestrated failover for all VMs using VMware tools

The customer plans to replicate the same setup at the second site. The total number of virtual machines that must be protected is 200. Your customer also expects an RPO of 0.

Which component or configuration is a necessary part of a solution that will meet all customer requirements?

A.

HPE Synergy frames from the secondary site added to the logical enclosure configured in the primary site.

B.

Storage policy-based management (SPBM) must be configured for a group of the virtual machines.

C.

Synchronous replication configured between sites to replicate the volumes used to build the datastores.

D.

Asynchronous replication configured between sites used to replicate the volumes used to build the datastores.

Full Access
Question # 19

A customer's HPE SimpliVity 380 Gen11 environment is currently managed only with on-premises utilities.

How can this solution be integrated into the HPE GreenLake management platform so that it can benefit from the HPE Private Cloud Business Edition features?

A.

By configuring the OmniStack integration with HPE InfoSight

B.

By redeploying the cluster as a PCBE setup integrated with DSCC

C.

By registering the iLO using the HPE Compute Ops Management activation process

D.

By deploying the Data Service Connector VM and importing the cluster to DSCC

Full Access
Question # 20

Your customer is planning to buy a new hardware platform for their HPC application.

They are considering an environment with 150 HPE Cray XD2000 systems with XD225v and XD220v servers.

Your customer has the following requirements for a management platform:

    Supports Ubuntu Linux 24.04 operating system

    Supports bare metal server operating system provisioning

    Has the ability to install operating system in parallel on multiple nodes

    Management platform is highly available

You are exploring HPE Performance Cluster Manager (HPCM) as a solution.

What statement is true in this scenario?

A.

HPE Performance Cluster Manager will fit the customer’s requirements.

B.

One server node must be reserved for the Admin Node.

C.

A different management solution must be used for parallel OS installation.

D.

The Slingshot network component must be added to the solution.

Full Access
Question # 21

Which statement identifies a correct recommended use case or workload for Qumulo?

A.

Life sciences, higher education, and manufacturing research, including select imaging, analytics, and high-performance computing use cases

B.

Second tier of storage to offload data from HPE StoreOnce, HPE ClusterStor (Luster), GPFS, HDFS, MapR from HPE, or Weka

C.

Primary S3 target for Splunk SmartStore for log and other machine data analytics

D.

Simple enterprise backup target for Commvault Complete, IBM Spectrum Protect, Oracle RMAN, Veeam, and Veritas NetBackup

Full Access
Question # 22

Your customer is currently using an HPE SimpliVity 380 Gen10 solution and is planning for a generation refresh to an HPE SimpliVity 380 Gen11.

The existing cluster is planned to be maintained as a test and dev platform for another 24–36 months while production workloads are moved to the new environment.

The new solution will be purchased as HPE GreenLake for Private Cloud Business Edition, and the customer would like to include the existing Gen10 cluster within the same management platform.

Which statement is true about combining the management of both the old and new generations?

A.

The new PCBE platform can be downgraded for on-prem management for interoperability with the Gen10.

B.

The existing SimpliVity environment needs to be redeployed as PCBE to co-exist with the new solution.

C.

The new PCBE platform can manage the old platform by utilizing the Data Services Connector OVA.

D.

The existing SimpliVity environment can be imported into the HPE GreenLake platform using Data Services Connector.

Full Access
Question # 23

A customer requested a quote for a 64Gb Fibre Channel system between two data centers with a distance of 95 KM / 60 MI between the locations, with a requirement for 14 F-ports on each switch.

Refer to exhibit

Question # 23

Which statement is true about the given configuration?

A.

A Short Wave transceiver must be removed to install the Long Wave transceiver.

B.

A Fibre Channel license needs to be modified for Extended Fabric to support the required distance.

C.

A SFP56 or SFP56-DD port can be used for the Long Wave transceiver when all SFPs are inserted.

D.

A port range of 39 to 47 can be used for the LW transceiver if ports 0 to 23 are used for SW.

Full Access