A storage administrator is creating a disaster recovery solution for HPE Alletra 9000 storage arrays. Currently, the company has three storage arrays at three different primary sites. When implementing the N-to-1 Remote Copy (RC) feature, what is the minimum number of storage arrays the storage administrator needs to plan for at the disaster recovery site?
An administrator needs to create an FCIP trunk connection between two data centers to interconnect their Brocade fibre data fabrics. Refer to the exhibit.

Based on this configuration, which statement is correct?
A storage administrator wants to set up NAS replication between two HPE StoreOnce appliances. A corresponding NAS library was created between the two systems, primary and secondary, where the secondary will receive the replicated information. When the administrator tries to create the NAS mapping on the primary StoreOnce solution, the administrator is presented with an error stating they do not have permission. What should the administrator do to solve this issue?
A customer has a diverse NoSQL big data and data analytics workload implementation. This workload runs on bare-metal servers to achieve the most efficient performance. The customer requires a new storage solution to meet their growing data needs. Which solution will be best for the customer?
A company bought an HPE StoreOnce solution as part of its data protection solution. The company has various Oracle installations that need to be backed up to StoreOnce. How should the company's administrator best implement the data protection strategy within the HPE StoreOnce user interface (UI)?
A customer purchased an HPE GreenLake for File Storage solution and implemented the replication feature. Which statement is correct regarding this feature?
An HPE customer purchased an HPE B-Series SN7000B SAN fabric switch. QoS is currently not enabled. Which two statements are correct regarding buffer-to-buffer (BB) credits and the operation of the switch? (Choose two.)
A company is going to upgrade a SAP HANA solution. The company is looking for competitive bids, and only SAP HANA hardware that is certified should be included in a bid. When building the bid, what must you first determine before you can right-size the solution with the appropriate HPE hardware?
What will occur when a new node is added to an existing HPE Alletra MP X10000 storage array?
A customer intentionally removes all three drives from a JBOF from an HPE Alletra MP X10000 used in an HPE GreenLake for File Storage solution. What is the correct description of the result of this action?
A customer needs to replace their current data protection solution, including hardware and software. They have the following requirements:
A single data management platform for data protection of hypervisor, container, cloud, physical, database, and application workloads
Eliminate data silos across backups for files, objects, and archiving
Needs to support a large, scale-out NAS solution
What is the best solution for this customer?
What is a prerequisite for a successful Fibre Channel storage array Peer Motion migration?