Pre-Summer Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

HPE0-V27 Questions and Answers

Question # 6

Match the Terms left to right

Full Access
Question # 7

What is a correct formula to calculate business value?

A.

profit = revenue / expenses

B.

profit = revenue + expenses

C.

profit = revenue * expenses

D.

profit = revenue - expenses

Full Access
Question # 8

An entertainment company wants to replace their AWS S3 environment that is comprised of approximately 1 PB of media files. The expected volume growth for the next few years is to 5 PB. The customer needs a flexible solution that can be installed on-premises and meets the following requirements:

    allow the company to reduce cost per TB

    easily integrate with current applications

    scale the media repository when necessary

    rely on a multi-site replication architecture

    keep the current OPEX model

Which solution meets these requirements?

A.

Azure Blob Storage

B.

HPE Alletra Storage MP B10000

C.

HPE GreenLake Solutions for Scality RING

D.

HPE GreenLake Solutions for Scality ARTESCA

Full Access
Question # 9

Which statement correctly describes an SLA?

A.

The agreement detailing the timeline to implement a solution.

B.

The agreement detailing measurable metrics that must be met.

C.

The agreement explaining requirements for protected data.

D.

The agreement explaining the ratio of net income and investment.

Full Access
Question # 10

Your customer needs assistance updating their database infrastructure with a modern solution that will grow with their needs and free up their IT staff to focus on value added activities.

Which of the following benefits would the customer receive by choosing HPE GreenLake for database?

A.

Cost savings with a community cloud operating model that supports sharing resources with other tenants.

B.

Time savings with a fully managed VDI solution hosted in their choice of AWS or Azure.

C.

Order prioritization with delivery and provisioning of new capacity in 7 days or fewer.

D.

Offload monitoring and modifying databases with HPE GreenLake management services.

Full Access
Question # 11

Which components are part of HPE GreenLake Data Protection. (Choose two.)

A.

Application mobility

B.

Disaster recovery

C.

Azure blob backup

D.

CSI plugin

E.

Object gateway

Full Access
Question # 12

Your customer needs a petabyte scale, geo-dispersed object Storage Platform.

Which Alliance solution will meet their requirement?

A.

HPE Solutions for Scalitv ARTESCA

B.

HPE Solutions for Qumulo

C.

HPE Solutions for Scalitv RING

D.

HPE Solutions for Cohesity

Full Access
Question # 13

Match each Data Center Bridging (DCB) protocol component with its description.

Full Access
Question # 14

Which statement about the CloudPhysics report above is correct?

A.

The cluster does not have enough resources for HA to restart all VMs in the event of a host failure.

B.

Networks indicates the number of vSwitches present in the cluster.

C.

There is 27.22TB of storage capacity in the cluster.

D.

There are 3 ESXi hosts in the cluster.

Full Access
Question # 15

You have designed an HPE Synergy solution for a customer site. The customer wants to use this solution design as a blueprint to implement the same solution in 200 locations. They want to minimize cost for installation and configuration and therefore plan to order everything Factory pre-installed and pre-configured.

Which HPE tool can you use to document the customer requirements and attach them to the order?

A.

HPE SmartCID

B.

HPE SPOCK

C.

HPE GreenLake Central

D.

HPE Assessment Foundry

Full Access
Question # 16

Which tool is available to help you to engage with the customer to present the economic impact of an HPE GreenLake solutions?

A.

HPE GreenLake Estimator

B.

HPE Assessment Foundry

C.

HPE GreenLake Quick Quote

D.

HPE GreenLake Central

Full Access
Question # 17

A customer is interested in a HPE SAP HANA solution based on HPE SuperDome Flex and HPE Alletra 9000.

Which additional product should you offer them?

A.

HPE GreenLake for Private Cloud Enterprise

B.

HPE Apollo 6500 Gen10 Plus

C.

HPE GreenLake for database

D.

HPE StoreOnce

Full Access
Question # 18

Your customer needs a compute solution. Their aging data center can only supply 5kW per rack, which is below the 15kW required for your planned solution.

Which change could you recommend to satisfy the requirement while maintaining the planned solution’s level of performance? (Choose two.)

A.

Design the solution with non-redundant power supplies.

B.

Use BMC tools to cap the power consumption of each server at 33%.

C.

Spread the infrastructure across additional racks.

D.

Host the compute solution with a colocation provider.

E.

Convert the solution to HPE GreenLake pay-per-use.

Full Access
Question # 19

Match the tool to its use category.

Full Access
Question # 20

You need to determine whether there is resource contention between VMs in an HPE Hyper-V environment.

Which tool should you use?

A.

HPE CloudPhvsics

B.

HPE Sinqle Point of Connectivity Knowledqe

C.

HPE NinjaSTARS

D.

HPE In

Full Access
Question # 21

Your customer has the following concerns about a dHCI proposal you have presented:

    The extended lead times for some parts of the solution do not meet their project timelines.

    They do not have sufficient IT resources to deploy a new solution.

    They are struggling with the initial cost outlay.

Which solution addresses all three of their concerns?

A.

Use the HPE Assessment Foundry to find ways to lower the amount of storage needed.

B.

Propose HPE GreenLake for Private Cloud Business Edition.

C.

Rebuild the solution in OCA while selecting alternative components.

D.

Use the HPE TCO and ROI calculators to develop a compelling business case.

Full Access
Question # 22

What does a Reference Architecture (RA) provide that a Reference Configuration (RC) does not?

A.

Performance configuration adjustments

B.

Hardware bill of materials guidance

C.

Overview of the business problem being solved

D.

Best practices guidelines

Full Access
Question # 23

Your customer wants to implement a software defined storage solution. They require the lowest latency possible in the back-end. Which technology should you recommend to address the customer ' s concern?

A.

HPE Aruba CX Ethernet switch family

B.

HPE M-series Ethernet switch family

C.

HPE B-series FC switch family

D.

HPE C-series FC switch family

Full Access
Question # 24

You are presenting an HPE GreenLake for private Cloud Enterprise solution to a CFO.

Which financial key performance indicator (KPI) can you show via GreenLake Central?

A.

ROI

B.

TCO

C.

Net present value

D.

Metered charges

Full Access
Question # 25

A customer is planning to replace their existing Cohesity platform. During initial deployment of the existing solution, there were several issues with compatibility that delayed implementation. What should you explain to the customer that HPE does to avoid this kind of situation?

A.

HPE Complete ensures that HPE and the ISV work collaboratively to complete the installation.

B.

HPE uses a deployment tool made by Cohesity specific to HPE hardware.

C.

HPE installs and tests the entire solution in the factory before sending it to the customer site.

D.

HPE OneView gathers current environment metrics and uses them for the new deployment.

Full Access
Question # 26

Your customer would like to containerize their applications and requires a container registry that can store, sign, and scan content. Which open source technology meets the customer requirements?

A.

Containerd

B.

Harbor

C.

Spire

D.

Spiffe

Full Access
Question # 27

A customer has asked you to provide a new server and storage platform. They want to minimize the storage and network cabling within their datacenter.

Which technology will help address this customer requirement?

A.

Containers

B.

Fabric Vision

C.

RDMA over Converged Ethernet (Ro

D.

HPE Virtual Connect

Full Access
Question # 28

What differentiated business value does HPE GreenLake provide to a customer that a traditional capital outlay purchasing model does not?

A.

Eliminate recurring costs

B.

Reduce accounts payable balance

C.

Improve liquidity

D.

Increased overprovisioning

Full Access
Question # 29

Your customer needs a new, highly-available HPE storage solution for the primary site of their main production database environment. They want a solution that offers high performance, low latency, and scalability. Which HPE solution meets the customer requirements?

A.

HPE MSA 2072 with FC connectivity

B.

HPE Alletra Storage MP B10000 with HPE NVMe-oF Host Bus Adapters

C.

HPE Alletra Storage Server 4120 with iSCSI connectivity

D.

HPE StoreOnce 5260 with Catalyst

Full Access
Question # 30

Your customer needs the smallest physical footprint for their S3 bucket storage requirement.

Which HPE alliance platform should you recommend?

A.

HPE Solutions for Scality Ring

B.

HPE Solutions for Qumulo

C.

HPE Solutions for Cohesitv

D.

HPE Solutions for Scality Artesca

Full Access
Question # 31

Your customer would like to adopt a pay-per-use consumption model with GreenLake for Private Cloud Enterprise.

Which important factor should you share with them?

A.

PCE bare metal servers are not included in pay-per-use billing.

B.

PCE is pay-per-use but must be serviced by an HPE Partner.

C.

The pay-per-use billing includes a minimum reserve.

D.

They can select any pay-per-use unit of measure they prefer.

Full Access
Question # 32

You are configuring an HPE GreenLake for Azure Stack HCI solution using the HPE Solution Sales Enablement Tool (SSET). Why are top-of-rack switches unavailable in the wizard?

A.

Switches are not included in the HPE GreenLake for Azure Stack HCI solution.

B.

SSET automatically adds switches to the BOM once necessary input is entered to the form.

C.

External switches are not needed for the HPE GreenLake for Azure Stack HCI solution.

D.

SSET cannot be used for HPE GreenLake for Azure Stack HCI sizing.

Full Access
Question # 33

You are presenting an HPE GreenLake for Private Cloud Enterprise proposal.

Which of the following statements is true?

A.

It only supports containerized workloads.

B.

It only supports virtualization workloads.

C.

It can support both containerized and virtualization workloads at the same time.

D.

It can support either containerized or virtualization workloads, but not at the same time.

Full Access