March Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

HPE0-V25 Questions and Answers

Question # 6

A customer wants to set up a site-to-site replication using FibreChannel to a Sitethat is 10 Kilometers away.

What cable must be used to achieve this?

A.

Single-mode fiber optic cable

B.

Flex fiber cable

C.

Multimode fiber optic cable

D.

Polymeroptical fiber cable

Full Access
Question # 7

you want to quickly 100k up the list price of an HPEhardware component.

Which pre-saves toolhas a QuickQuotefunction?

A.

HPE smart CID

B.

HPE CloudPhysics

C.

HPE seismic

D.

HPE ProductBlletin

Full Access
Question # 8

your customer requires a server that can support a database Of 5TB to run in memory.

Which HPE server family should you recommend?

A.

DL385 Gen10 plus v2

B.

APollo 4510 Gen10 Plus V2

C.

DL560 Gen10

D.

DL345 Gen10 Plus

Full Access
Question # 9

Match the correct scaling approach to each strategy

Full Access
Question # 10

Match the HPE storage products to their use case.

Full Access
Question # 11

Your customer has run out of storage ontheir Virtual environment.

How does migrating to HPE GreenLakehelp this customer?

A.

by implementing a reserve level to ensure there is always storage available

B.

by enabling the customer to use an installed butter and only pay for what they use

C.

by automatically ordering more storage when capacity levels reach90%

D.

by allowing the customer to over-provision their storage

Full Access
Question # 12

An RFP states that the database server requires two processors out must De available to scale tofour inside a 2Uchassis.

Whichserver would satisfy the customer requirements?

A.

DL560 Gen10 server

B.

TWO DL380 Gen 10 servers

C.

TwoDL360 Gen10 servers

D.

DL580 Gen10 server

Full Access
Question # 13

Your customer needshelp troubleshooting a Layer 3 network routing issue.

Which command should you use?

A.

showLLDP neighbor-info

B.

traceroute

C.

snow startup-config

D.

config-router

Full Access
Question # 14

Your customer wants a new server tor a File & print workload.

What are the most important factors to consider?(Select two.)

A.

support level

B.

power supply wattage

C.

storage capacity

D.

transfer rate

E.

form factor

Full Access
Question # 15

A customer who is new to HPE wants to refresh the hardware infrastructure for their VMware environment. Before meeting the customer, you need to perform an assessment to get a better of their environment

Which HPE tool should you use?

A.

OneView

B.

CloudPhysics

C.

GreenLake QuiCk Quote

D.

InfoSight

Full Access
Question # 16

Over the next two years, your customer Plans to expand from 25 to 75 employees. They currentlyhave limited space in theserver rack and will need to purchase additional servers as the business grows.

Which server type Should you recommend?

A.

Synergy12000

B.

ML 350

C.

DL360

D.

Apollo 4200

Full Access
Question # 17

your customer wants to purchase a new HPE MSA controller enclosure fully populated With SSD fives. They have four existing expansion enclosures from their previous solution that they want to connect to the new controller.

Two expansion enclosures are fully populated with SFF disks, and the other two are populated with LFF drives.

which storage controller enclosure solution should you recommend?

A.

HPF MSA 1060 with Advanced Data Service (ADS) suite LTLJ

B.

HPE MSA 1060

C.

HPF MSA 2060 with Advanced Data service (ADS) suite LTU

D.

HPE MSA 2060

Full Access
Question # 18

What is a feature Of the MSA 2060 storage array?

A.

Gains Al and machine learning operational through InfoSight

B.

Encryption can be enabled by adding 2 self-encrypted drives through Full Disk Encryptbn

C.

Supports a mixture Of both SSD and HDDs within the same system

D.

Deduplication and compression are non-intrusive and in-line

Full Access