Question # 6

Which of the following KPIs is qualitative?

1. Openness and co-operation of supplier

2. Responsiveness of supplier

3. Customer satisfactory ratings

4. Cost management

5. OTIF deliveries

A.

2 and 5 only

B.

1 and 3 only

C.

2 and 3 only

D.

1 and 4 only

Full Access
Question # 7

To expand its operation, Steel Co. decides to build a new plant. Despite of excitement, the senior management is very concerned about the complexity and risks of such project. Hugo, the procurement manager, suggests that the company can adopt a model form of contract. What is the advantage of using model form of contract?

A.

It shifts the balance of power in the favour of the buyer rather than the contractor

B.

The company could avoid the need to draft a complex contract from blank

C.

Model form of contract eliminates the need for legal advice totally

D.

The company does not need to draft the drawings as well as specification anymore

Full Access
Question # 8

In which of the following conditions, request for quotation produces the best results?

A.

With an ambiguous specification

B.

Under framework agreements

C.

Under a complex process

D.

With strategic items

Full Access
Question # 9

Which of the following is the model form of contract for construction which is recommended by World Bank?

A.

ITC

B.

JCT

C.

CIPS

D.

FIDIC

Full Access
Question # 10

A procurement manager is setting KPIs measurement for user satisfaction. He also wants to encourage users to share the reason why they feel the way they do. Which of the following types of KPI should the procurement manager apply?

A.

Quantitative measure

B.

Numerical measure

C.

Binary measure

D.

Qualitative assessment

Full Access
Question # 11

As a result of a global pandemic, a local hospital is facing significant patient capacity pressures and would like the construction of a new 50-bed ward to be prioritised and fully operational at the earliest opportunity. Which of the following pricing arrangements would support this aspiration?

A.

Incentivised contract pricing

B.

Fixed price economic adjustment pricing

C.

Time and materials arrangement pricing

D.

Penetration contract pricing

Full Access
Question # 12

In which scenarios would it be appropriate for a procurement organisation to include contractual indexation and/or price adjustment formulae clauses in a services contract? Select TWO that apply.

A.

The supplier’s directors shall be paid dividends during the term

B.

The supplier’s contract staffing costs will be subject to regulatory increase

C.

The material components were tendered as fixed costs for the term

D.

The supplier’s preference is to switch to a more expensive material specification

E.

The market rates for the supplier's material costs will vary during the term

Full Access
Question # 13

Which of the following key performance indicators are most likely to use numerical data as the main source of information?

The critical evaluation of project deliverables

The subjective responses of a satisfaction survey regarding a service

The instances of late deliveries within a given month

The occurrence of accidents and near misses in a year

A.

1 and 3 only

B.

2 and 4 only

C.

3 and 4 only

D.

1 and 2 only

Full Access
Question # 14

Which of the following are good examples of a Key Performance Indicator?

The total number of services provided

Reduction rate in goods or services

Complaints resolved within two days

Delivery of goods on time and in full

A.

1 and 2 only

B.

2 and 3 only

C.

3 and 4 only

D.

2 and 4 only

Full Access
Question # 15

Which of the following will be always automatically deemed as a consideration?

A.

Promise to perform over and above an existing obligation

B.

Promise given to a third party

C.

Implied consideration

D.

Past consideration

Full Access
Question # 16

Which of the following is set down in statute as a liability that exists without any need to prove fault?

A.

Strict liability

B.

Current liability

C.

Contingent liability

D.

Non-current liability

Full Access
Question # 17

Streaming Ltd is a music streaming provider based in the UK. The company is looking for extending its presence in the US. To achieve this, the company needs to outsource the data centre service to a local company. To monitor the performance, the procurement manager would like to introduce a service level agreement (SLA) to the data centre service provider. Which of the following should be included in the SLA?

1. System availability

2. The mean time to recover from system failure

3. The actual number of on-time service delivery

4. Dispute resolution procedure

A.

1, 3 and 4 only

B.

1, 2 and 4 only

C.

1, 2 and 3 only

D.

2, 3 and 4 only

Full Access
Question # 18

Bandpro is a reseller of branded computer products to the private and public sector. The procurement team must purchase 500 items each day solely by multiple phone calls and emails to suppliers. Due to this practice, it takes a lot of time to track and collect relevant documents.Some important documents even get lost, which makes procurement audit more burdensome. Which of the following would increase the robustness of audit trails in procurement activities?

A.

Every evidence must be recorded by paper

B.

Adopt e-procurement

C.

Spend less time on auditing procurement procedures

D.

Rectify non-compliant activities

Full Access
Question # 19

Buyer D agrees a contract with Supplier C which includes the words 'to be agreed' in relation to the date for delivery of the goods. At the time of the contract, Buyer D is aware that the goods take two days to produce and one day to deliver. Buyer D contacts the supplier one week later, requesting the goods be delivered the following day. Supplier C is unable to deliver the next day but rather delivers the goods three days later. Is it the case that Buyer D can legally refuse to pay for the goods because Supplier C is in breach of contract?

A.

Yes, because the delivery date is an express term within the contract

B.

Yes, because the goods should have been delivered within three days

C.

No, because the goods were delivered within a reasonable time

D.

No, because there is a contract in place and the delivery date does not matter

Full Access
Question # 20

Transformers & Rectifiers Ltd wanted to buy some specialist gaskets. They sent a request for quotation with specification to Needs Ltd. The supplier replied with a quotation in which had its own terms and conditions. The buyer edited delivery terms on the quotation and sent the document back to Needs Ltd. Gaskets were delivered to Transformers’ premise with an invoice from Needs Ltd. Which of the following is most likely to be the governing terms if the two companies must settle the dispute at court?

A.

Edited terms and conditions

B.

Terms and conditions in the request for quotation

C.

Terms and conditions in the invoice

D.

Terms & conditions in the original quotation

Full Access
Question # 21

Which of the following standards gives guidance on the layout and preparation of specifications?

A.

BS EN 60601-1-11:2015

B.

BS 5864:2019

C.

BS 5975:2019

D.

BS 7373-1:2001

Full Access
Question # 22

Which of the following clauses addresses fraud, bribery and corruption?

The Company has undertaken commercially reasonable efforts to eliminate Conflict Minerals from each Company Product and any products currently proposed to be manufactured by the Company or on its behalf in the future. “Conflict Minerals” means columbite-tantalite (coltan),cassiterite, gold, wolframite, or their derivatives, which originate in the Democratic Republic of the Congo or other country the exploitation and trade of which is determined by the United States to be financing conflict in the Democratic Republic of the Congo or other country.

A.

Customer will be responsible for and shall ensure that while Service Provider employees, agents or contractors are on Customer’s premises, all proper and legal health and safety precautions are in place and fully operational to protect such persons.

B.

Nothing in this Agreement shall prevent a Party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this Agreement; provided, however, that each Party shall require its subcontractors to comply with all applicable terms and conditions of this

C.

Agreement in providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor.

D.

Each Party hereby undertakes that, at the date of the entering into force of the Contract, itself, its directors, officers or employees have not offered, promised, given, authorized, solicited or accepted any undue pecuniary or other advantage of any kind in any way connected with the Contract and that it has taken reasonable measures to prevent subcontractors, agents or any other third parties, subject to its control or determining influen

Full Access
Question # 23

Which of the following could be the last document in a 'battle of the forms'?

A.

Quotation

B.

Order acknowledgement

C.

Purchase order

D.

Invitation to Tender (ITT)

Full Access
Question # 24

A procurement officer decides to approach the supply market regarding a procurement activity that will specify the use of technology that is very new to the market. The procurement officer is taking this step before the formal tender process is started. Is this approach permitted?

A.

Yes, but only as part of early market engagement and with no commitment of contracts

B.

No, it is time consuming and can delay tenders unnecessarily

C.

Yes, it is a good way to understand who will have the highest prices and start negotiations

D.

No, all suppliers must wait for the invitation to Tender (ITT) to be released

Full Access
Question # 25

Cleveland Insurance (Cleveland) offers a range of insurance services. The main software used in the call centre is a customer relationship management (CRM) system. Cleveland perceived an urgent need to replace the existing CRM system to deal with the increasing number of customers and services.

Urgent Digital Ltd (Digital) is one of the bidders of Cleveland’s ITT. Its bid team is led by Hank Irvine, its technical director. Hank realises that winning the Cleveland contract (valued at approximately £50M) will enhance his career. During discussions with Cleveland, Hank offers certain assurances regarding timescales for the project. He has not carried out any investigations into the viability of the timescales. Hank has little idea whether the timescales can be met.

Cleveland decides that Digital’s bid meets with its requirements, especially given the assurances in timescale offered by Hank, and decides to proceed with it, subject to a formal contract. Eventually, a formal contract is signed by both parties. The initial assurances given by Hank about the timing of the project are never going to be achieved and are at best grossly exaggerated.

Hank’s pre-contractual assurance is most likely to be an example of which of the following?

A.

Inaccuracy in communication

B.

Threat

C.

Initial impossibility

D.

Fraudulent misrepresentation

Full Access
Question # 26

An organization has a normal tender process that often last 1 month from defining the needs to contract award. Manufacturing department suddenly required a new special part that they could not foresee within a month. Which of the following should be the priority actions of procurement manager in this urgent situation? Select TWO that apply:

A.

Design new specification

B.

Develop relationships with potential suppliers

C.

Review contract performance

D.

Get high-level authority approval

E.

Submit full business justification

Full Access
Question # 27

What are disadvantages of a buyer contracting on the supplier's terms? Select TWO that apply.

A.

Materials will not be changed without the buyer’s consent

B.

The buyer would not be subject to any indemnity clause obligations

C.

Title to goods may remain with the supplier until payment is received

D.

Goods received late will incur penalties for the supplier

E.

Prices may increase without notification to the buyer

Full Access
Question # 28

Information assurance protects information systems and...?

A.

Hard copy

B.

Computers

C.

Inventory

D.

People

Full Access
Question # 29

Cleveland Insurance (Cleveland) offers a range of insurance services. The main software used in the call centre is a customer relationship management (CRM) system. Cleveland perceived an urgent need to replace the existing CRM system to deal with the increasing number of customers and services.

Urgent Digital Ltd (Digital) is one of the bidders of Cleveland’s ITT for designing, building and managing the new CRM system. Its bid team is led by Hank Irvine, its technical director. Hank realises that winning the Cleveland contract (valued at approximately £50M) will enhance his career. During discussions with Cleveland, Hank offers certain assurances regarding timescales for the project. He has not carried out any investigations into the viability of the timescales. Hank has little idea whether the timescales can be met.

Cleveland decides that Digital’s bid meets with its requirements, especially given the assurances in timescale offered by Hank, and decides to proceed with it, subject to a formal contract. Eventually, a formal contract is signed by both parties. The initial assurances given by Hank about the timing of the project are never going to be achieved and are at best grossly exaggerated.

Cleveland brought the case to the court and sought rescission of contract with Digital. Is Cleveland’s claim appropriate in this case?

A.

Yes, because Cleveland needs to seek rescission first before claiming for damages

B.

Yes, because both parties agreed with rescission of their contract

C.

No, because the work had been carried out which could not be returned

D.

No, because the contract does not include any provision on rescission

Full Access
Question # 30

Which of the following would be steps in the preparation of an invitation to tender? Select TWO that apply.

A.

Re-writing a model form contract

B.

Creating a detailed specification

C.

Learning International Standards

D.

Advertising the requirement

E.

Publishing your company's financial reports

Full Access
Question # 31

Which of the following are likely to be implied terms in a contract? Select TWO that apply:

A.

Legal precedence

B.

Definition & interpretation

C.

Contract appendix

D.

Statute

E.

Contract clause

Full Access
Question # 32

In what way might a contract clause be used to stop the supplier from making unwarranted price increases during the term of the contract?

A.

The buyer deletes any contract clauses that may refer to stage payments

B.

The buyer inserts a contract clause that stipulates the invoice payment dates

C.

The buyer inserts a price adjustment clause in the contract

D.

The buyer deletes any contract clauses that may refer to price increases

Full Access
Question # 33

As part of a tender, which of the following are advantages that a purchasing organisation would expect to achieve by specifying that suppliers hold certification to an international environmental management standard, such as ISO 14001?

It provides assurance that bidders have achieved a common standard of practice

It provides a guarantee that any polluting suppliers will be unable to tender

The standard is recognisable to local and international bidders

It removes the need to conduct internal environmental training

A.

3 and 4 only

B.

2 and 4 only

C.

1 and 3 only

D.

1 and 2 only

Full Access
Question # 34

One of the important features in the formation of a contract is the need to have a 'consensus ad idem' between the contracting parties. 'Consensus ad idem' can be translated as meaning:

A.

A promise to commit the contract to written form

B.

A meeting of minds where all parties have the same understanding of the terms

C.

Let the buyer beware before agreeing the contract

D.

An agreement on the main item of the contract

Full Access
Question # 35

Which of the following is the most suitable model contract for car lift manufacturing?

A.

ITC

B.

FIDIC

C.

IMechE/IET

D.

CIPS

Full Access
Question # 36

The cost in cost reimbursable contract is...?

A.

Actual cost

B.

Variable cost

C.

Fixed cost

D.

Profit

Full Access
Question # 37

Which of the following are implied terms in sales contracts? Select THREE that apply.

A.

Payment method

B.

Customer satisfaction

C.

Transfer of ownership

D.

Risk transfer

E.

Fitness for purpose

F.

Mode of transportation

Full Access
Question # 38

A senior buyer is preparing specification for the next purchase. He intends to embed social and environmental criteria that align with his organisation's overarching strategy. Which of the following provides the social and environmental objectives that an organisation pursues?

A.

Economic performance

B.

Procurement Systems and Technology

C.

Economy of scale

D.

Organisation’s CSR policies

Full Access
Question # 39

Under a framework agreement, which of the following are supplier selection mechanisms? Select TWO that apply:

A.

Rescission of contract

B.

Mini competition

C.

Contract for lease

D.

Direct call-off

E.

Call off contract

Full Access
Question # 40

Which of the following statement is true about one-off contract?

A.

Suppliers have many opportunities to improve the quality during the performance of one-off contract

B.

One-off contracts can be used for services and works

C.

Ad-hoc purchase is not a type of one-off purchase

D.

One-off contracts only apply to low-value, low-risk purchase

Full Access
Question # 41

The pricing arrangement in which markup is added into cost base to calculate the final price is known as...?

A.

Fixed Price approach

B.

Market based approach

C.

Price indices

D.

Cost plus pricing

Full Access
Question # 42

In order to reduce the internal cost of administration from the raising of high-volume, low-value orders such as office stationery, a procurement manager implements the use of call-off orders for such circumstances. Is this an acceptable thing to do?

A.

No, the procurement manager fears that they will lose staff and prefers to keep the administration costs high

B.

No, as the role of the administration staff is to keep a check on the items being ordered and they would lose this ability

C.

Yes, as the procurement manager will be able to track more easily the volume of small orders and where the spend is occurring

D.

Yes, the use of a blanket order cuts the staff administration time and paperwork that would be involved in numerous small orders

Full Access
Question # 43

ABC Ltd is a UK based company. It plans to enter into a contract with XYZ Ltd which is based in Singapore. Which of the following are the mandatory elements for the contract between ABC Ltd and XYZ Ltd to be legally binding? Select THREE that apply.

A.

All parties must have capacity to contract

B.

The two parties must have intention to be bound

C.

The invitation to tender must be sent by the agreed deadline

D.

There must be an offer and an acceptance

E.

An amount of money must be paid upfront

F.

There must be an invitation to treat

Full Access
Question # 44

SFO procurement manager sent a request for quotation to Vogon International in which he determined the contract terms and specification. In SFO's standard terms and conditions, it is stated that 'Goods shall be delivered and Services performed by the applicable Delivery Date. Supplier must notify Buyer 3 days prior to the Delivery Date if Supplier is likely to be unable to meet a Delivery Date.'

Vogon replied with a quotation without any amendment to SFO's terms & conditions. The SFO procurement manager found the prices were reasonable and submitted to senior management. Senior management team accepted that quotation and sent a notification to Vogon. On the Delivery Date, Vogon said they had no capacity to supply the product as the quotation due to a workers' strike. Did Vogon breach any agreement with SFO?

A.

No, because Vogon had no intention to be bound by the quotation, therefore, it didn’t constitute a contract

B.

No, because the strike is a force majeur event, so Vogon did not breach any contract with SFO

C.

Yes, because the contract was formed since Vogon had sent the quotation as an acceptance to SFO’s offer

D.

Yes, because the contract had been formed between SFO and Vogon with the quotation as an offer and the notification as an acceptance

Full Access
Question # 45

John Powers is the managing director of ACC Trading Ltd, which provides components to the automotive industry. His company has been providing number plates to Elite Motors Ltd for many years. As John Powers and Peter Ellis, the MD of Elite, have been friends for a long time, there has never been a formal contract agreed between the companies. Following a downturn in the market, Elite Motors Ltd has now been placed in administration. ACC recently delivered 200 number plates but have not received payment. As the number plates have been fitted to some vehicles, the administrators are being very slow to return them. Which clause in a formal agreement would have helped John?

A.

Force Majeure

B.

Retention of Title (Romalpa)

C.

Liquidated Damages

D.

Penalty Clause

Full Access
Question # 46

Which of the following should be used in a contract for window cleaning during the next three months?

A.

Variable pricing arrangement

B.

Fixed pricing arrangement

C.

Standard schedule of rates

D.

Cost-plus arrangement

Full Access
Question # 47

Royal Naval Hospital at Rockstown, Anyport manages a fleet of nine ambulance vehicles. During busy periods, it becomes very difficult to keep track of the location of each ambulance (and the nature of their journey). Continual problems lead to the proposal for a new control system (ERNS).

For this ERNS project, the procurement department has drafted a specification in which only a bullet point list of basic requirements was written down. The procurement manager understands that the specification should be developed more specifically but a cross functional team from the Hospital could not do that. A senior buyer suggests that some of Hospital's pre-qualified suppliers could support them in developing the specification.

Which of the following should be a priority approach of procurement department in developing dialogue with those suppliers about specification development?

A.

Internal discussion

B.

General networking

C.

One-to-one meeting with the suppliers

D.

Request for quotation from the suppliers

Full Access
Question # 48

A buyer and a supplier plan to sign a contract with cost-plus arrangement. If the cost base is $350 and the markup component is 11% then the invoice price will be...

A.

393.26

B.

388.5

C.

368.5

D.

362

Full Access
Question # 49

Which of the following should be applied when measuring frequency of on-time deliveries during a contract period?

A.

Qualitative assessment

B.

Numerical measure

C.

Binary measure

D.

Subjective measure

Full Access
Question # 50

A procurement professional is drafting payment terms for a commercial contract. He is considering about payment method if defective products are found. Which of the following should be embedded in payment terms to control this issue?

A.

Remedies for late payment

B.

Pay-less notice

C.

Invoice preparation

D.

Retention clause

Full Access
Question # 51

Esther Francis has recently changed job from a supply role at Shine Cleaning Services (SCS) to a purchasing role at Southern Commercial Property (SCP). Esther requires industry technical input to develop a cleaning services requirements specification for her new employer. Esther Francis wants to include her former employer SCS in a market engagement exercise to inform the specification. Which of the following would be the most appropriate way to deal with the conflict of interest?

A.

Conduct the market engagement with SCS off the record

B.

Declare the potential conflict of interest to a senior manager of SCS

C.

Ask a colleague to conduct the market engagement with SCS

D.

Conduct market engagement with several capable suppliers, including SCS

Full Access
Question # 52

What is the purpose of using key performance indicators in procurement and supply?

A.

To validate the supplier's bid or tender

B.

To monitor supplier's performance

C.

To ease the termination process

D.

To qualify which supplier is suitable

Full Access
Question # 53

Why would you use a non-disclosure agreement?

A.

To protect parties, where information has been shared that is not in the public domain

B.

To allow parties the freedom to disclose confidential information to the public domain

C.

To agree between parties what information is and is not confidential and what can be in the public domain

D.

To give parties permission to share all information in the public domain

Full Access
Question # 54

A fashion company is drafting a specification for an order in next year. The company wants to expand its supply base in low cost countries. The procurement department is considering applying standard ISO 3759 on method for the preparation, marking and measuring of textile fabrics, garments and fabric assemblies for use in tests for assessing dimensional change after a specified treatment. Which of the following should be taken into account when embedding this standard into the specification?

A.

Date of publication

B.

Supplier selection

C.

Type of specification

D.

Legality

Full Access
Question # 55

If a false statement of material fact is made by one of the contracting parties, the misled party will have remedies for:

A.

Indemnity

B.

Misrepresentation

C.

Recission

D.

Damages

Full Access
Question # 56

Which of the following is a benefit to the buyer of using model form contracts?

A.

The terms used are advantageous to the buyer

B.

It reduces time and costs in developing a formal contract

C.

No legal advice is required as variations are not accepted

D.

Most suppliers are unfamiliar with the terms used

Full Access
Question # 57

Which of the following are always considered as minimum preconditions for a contract? Select TWO that apply:

A.

Specification

B.

Promise

C.

Omission

D.

Consideration

E.

Intention to be bound

Full Access