L4M3 Questions and Answers

Question # 6

MWB operates serviced offices in central London. Rock entered a contractual licence with MWB to occupy office space in Marble Arch and had accumulated licence fees in arrears. The original licence agreement contained a ‘No Oral Modification’ clause that said: 'All variations to this licence must be agreed, set out in writing and signed on behalf of both parties before they take effect'.

After 6 months, Rock director re-negotiated to extend payment period over phone call and MWB credit controller agreed his proposal. Is this agreement considered as an effective variation to the original licence agreement?

A.

Yes, because parties who agree to altering the original contract orally despite a ‘No Oral.

B.

Modification’ clause, must have intended to dispense with the clause

C.

No, because the mechanism for variation has been set out in the original contract

D.

Yes, because the credit controller had agreed with Rock director’s proposal

E.

No, because Rock director assumed that the variation was effective and convinced credit controller to believe it

Full Access
Question # 7

Maximum Score: 1

Buyer O has placed an order for the supply and installation of six new servers for a total amount of £600,000 from Supplier A. Which of the following could potentially be treated as examples of a liquidated damages clause within the contract for the supply of the servers?

    If the supplier delivers any of the servers late, £1,000 per server will be deducted from the order per day

    This contract is subject to delay remedies of £X - the amount to be agreed by both parties during delivery

    The sum for breach of the completion date for the order is £40,000 per day up to a maximum of 50% of the contract price

    If the performance of any of the servers degrades within five years, a full refund of £600,000 will be provided

A.

1 and 2 only

B.

3 and 4 only

C.

1 and 3 only

D.

2 and 4 only

Full Access
Question # 8

A supermarket purchases a new batch of house cleaner from new supplier. The supermarket is concerned about possible damage that the house cleaner may cause to consumers' floor. What type of insurance must they cover?

A.

Fire and explosion insurance

B.

Product liability insurance

C.

Professional indemnity insurance

D.

Public liability insurance

Full Access
Question # 9

Which of the following are likely to be advantages of using invitation to tender? Select TWO that apply:

Short turnaround times

A.

Quick implementation

B.

Driving forward planning culture

C.

Lower administration costs

D.

Reducing risks of bribery and corruption

Full Access
Question # 10

In order to monitor supplier’s performance, an organization decides to draft performance management frameworks. Which of the following are the components of a performance management framework? Select THREE that apply:

A.

Targets

B.

KPIs

C.

Consequences

D.

Indemnity

E.

Force majeure

F.

Justification

Full Access
Question # 11

Which of the following are most likely to be substantive elements of the specification of a truck? Select TWO that apply:

A.

Guarantee

B.

Foreword

C.

Expected lifespan

D.

Ethics

E.

Abbreviation

Full Access
Question # 12

Why would you use a non-disclosure agreement?

A.

To protect parties, where information has been shared that is not in the public domain

B.

To allow parties the freedom to disclose confidential information to the public domain

C.

To agree between parties what information is and is not confidential and what can be in the public domain

D.

To give parties permission to share all information in the public domain

Full Access
Question # 13

Maximum Score 1

Contract terms are statements by the parties to the contract as to what they understand their rights and obligations to be under the contract. It is important from the outset that there is a genuine agreement between the parties as to what the contract terms are. After the contract has been made, it is too late for either party to alter its terms unilaterally.

Which of the following is another role that negotiated contract terms might play?

A.

Defining conditions and contingencies that may alter the arrangement

B.

Ensuring any future contracts will be on the buyer's terms

C.

Providing a guarantee that the supplier will never fail to perform under any circumstances

D.

Identifying the type of contractual disputes in which the courts might decline to adjudicate

Full Access
Question # 14

Which of the following regulates barriers to the provision of services between countries?

A.

CISG

B.

GATS

C.

ADA

D.

Incoterms

Full Access
Question # 15

Maximum Score: 1

A service contract for cleaning is due for expiry after a five year duration. Which of the following are good sources of data to create a specification for the new invitation to tender?

    Incumbent supplier

    Maintenance services

    Alternative suppliers

    Management information

A.

1, 2 and 3 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 4 only

Full Access
Question # 16

When a supplier signs an insurance policy with an insurance company, which of the following is transferred to insurance company?

A.

Right

B.

Risk

C.

Legal responsibility

D.

Contractual obligation

Full Access
Question # 17

A procurement officer decides to approach the supply market regarding a procurement activity that will specify the use of technology that is very new to the market. The procurement officer is taking this step before the formal tender process is started. Is this approach permitted?

A.

Yes, but only as part of early market engagement and with no commitment of contracts

B.

No, it is time consuming and can delay tenders unnecessarily

C.

Yes, it is a good way to understand who will have the highest prices and start negotiations

D.

No, all suppliers must wait for the invitation to Tender (ITT) to be released

Full Access
Question # 18

In which of the following conditions, request for quotation produces the best results?

A.

With an ambiguous specification

B.

Under framework agreements

C.

Under a complex process

D.

With strategic items

Full Access
Question # 19

Bandpro is a reseller of branded computer products to the private and public sector. The procurement team must purchase 500 items each day solely by multiple phone calls and emails to suppliers. Due to this practice, it takes a lot of time to track and collect relevant documents.Some important documents even get lost, which makes procurement audit more burdensome. Which of the following would increase the robustness of audit trails in procurement activities?

A.

Every evidence must be recorded by paper

B.

Adopt e-procurement

C.

Spend less time on auditing procurement procedures

D.

Rectify non-compliant activities

Full Access
Question # 20

Which of the following are express terms?

Sale by description

Fitness for purpose

Passing of risk

Passing of title

A.

1 and 2 only

B.

2 and 3 only

C.

2 and 4 only

D.

3 and 4 only

Full Access
Question # 21

Which of the following statements is true about model form of contract?

A.

When model contracts are employed, there are no requirements for legal advice and input

B.

Model contract form's standard clauses often contain correct legal terminology without recourse to third party experts.

C.

The standard clauses of model contract forms give the offeror legal advantages over the offeree

D.

Only the publishers of model forms of contract can edit the clauses of these forms

Full Access
Question # 22

Which of the following should include in the service level agreement that is an appendix of a contract?

1. How often the service is measured

2. Minimum qualification of supplier staffs

3. Remedies to resolve dispute

4. On time service delivery

A.

1, 3 and 4 only

B.

1, 2 and 3 only

C.

2, 3 and 4 only

D.

1, 2 and 4 only

Full Access
Question # 23

Which of the following can be considered as implied terms in a contract?

1. Case law

2. Statute

3. Trade custom

4. A term can never be implied, it must always be expressed by the parties

A.

1,3 and 4 only

B.

1, 2 and 3 only

C.

1, 2 and 4 only

D.

2, 3 and 4 only

Full Access
Question # 24

Maximum Score 1

A construction company wishes to place the contract for the building of a new hotel to a principal contractor using a model form contract. Which of these is an advantage of using a ‘model form contract’?

A.

It avoids the requirement to create complex contracts each time but can be adapted to suit particular circumstances

B.

Formulae or indices can be included to assess any additional supplier’s claims for contract price adjustment

C.

Incentive payment terms can be included to reward the supplier for attainment of cost savings

D.

Legal advice is still required if significant amendments or variations are to be made to the contract

Full Access
Question # 25

Maximum Score 1

Buyer O has placed an order for the supply and installation of six new servers for a total amount of £600,000 from Supplier A. Which of the following could potentially be treated as examples of a liquidated damages clause within the contract for the supply of the servers?

    If the supplier delivers any of the servers late, £1,000 per server will be deducted from the order per day

    This contract is subject to delay remedies of £X - the amount to be agreed by both parties during delivery

    The sum for breach of the completion date for the order is £40,000 per day up to a maximum of 50% of the contract price

    If the performance of any of the servers degrades within five years, a full refund of £600,000 will be provided

A.

1 and 2 only

B.

3 and 4 only

C.

1 and 3 only

D.

2 and 4 only

Full Access
Question # 26

Maximum Score 1

Which of the following are examples of a lack of ‘capacity’ to enter into a contract?

    A contracting party has a severe mental disorder

    A contracting party has failed to concentrate during negotiations

    A contracting party is 19 years of age

    A contracting party (corporation) has acted ‘ultra vires’ (beyond its defined legal powers)

A.

1 and 2 only

B.

1 and 4 only

C.

2 and 3 only

D.

2 and 4 only

Full Access
Question # 27

Express terms in a contract are stated in which of the following? Select TWO that apply

A.

Orality

B.

Idea

C.

Trade customs

D.

Writing form

E.

Statutes

Full Access
Question # 28

Under a framework agreement, which of the following are supplier selection mechanisms? Select TWO that apply:

A.

Rescission of contract

B.

Mini competition

C.

Contract for lease

D.

Direct call-off

E.

Call off contract

Full Access
Question # 29

According to mailbox rule in some common law countries, at which point the offeree's acceptance will be effective?

A.

When the letter of acceptance is opened and its contents read by the offeree.

B.

When the letter of acceptance is received by the offeror.

C.

When the letter of acceptance has been written.

D.

When the letter of acceptance has been correctly addressed, its postage paid, and posted.

Full Access
Question # 30

Which of the following are driving forces for increasing use of social and environmental criteria in specifications? Select TWO that apply.,

A.

Process efficiencies

B.

Stakeholder pressure

C.

Insufficient financial resources

D.

Scarcity of environmentally sustainable suppliers

E.

Carbon footprint measure

Full Access
Question # 31

A manufacturing company signed a contract with a raw material supplier. The contract includes a clause on liquidated damages in case of late delivery. Purchaser was obliged to pay after 30 days from delivery. Eventually raw material was delivered 1 week later than initial plan due to supplier’s slow production process. There is no defect in the delivered batch. Which of the following can be claimed by the manufacturing company?

A.

Rights to refunds or repairs

B.

Right of set-off

C.

Right of third party

D.

Right of extending payment

Full Access
Question # 32

Maximum Score 1

A service contract for cleaning is due for expiry after a five-year duration. Which of the following are good sources of data to create a specification for the new invitation to tender?

    Incumbent supplier

    Maintenance services

    Alternative suppliers

    Management information

A.

1, 2 and 3 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 4 only

Full Access
Question # 33

Which of the following are most likely to be liabilities of suppliers under a guarantee clause?(SelectAny Two)

A.

TWO that apply

B.

Repair

C.

Decommissioning

D.

Upgrading

E.

Replacement

F.

Installation

Full Access
Question # 34

Nestle gave away records of “Rockin’ Shoes” or a voucher to people who sent in three wrappers from Nestle’s 6d. milk chocolate bars as well as 1s 6d. Which of the following were the consideration of Nestle’s customer? Select TWO that apply

A.

Three wrappers

B.

1s 6d

C.

“Rockin’ Shoes” record

D.

The voucher

E.

Milk chocolate bar

Full Access
Question # 35

Which of the following statement is true about insurance?

A.

An insurance policy can be mechanism of substance to back up indemnity

B.

The supplier must always pay the insurance premium for goods-in-transit

C.

An insurance policy transfers the legal liabilities from the insured to the insurer

D.

Professional indemnity insurance provides the insured business with financial protection against the liabilities caused by or arising out of the products supplied

Full Access
Question # 36

Which of the following statements is FALSE on contracts for the leasing of assets?

A.

The party responsible for maintenance, insurance and taxes is subject to negotiation

B.

In lease agreement, the possession and right of use of an asset are transferred to the lessee

C.

The ownership of leased asset is transferred to the lessee at the end of the period

D.

The lessee may bear some risks of ownership, such as the liability to insure the asset

Full Access
Question # 37

According to rule of contract formation, which of the following is a valid acceptance?

A.

The person orally agrees to pay the offered price

B.

The person states that she is able to pay the offered price

C.

The person asks for a lower price

D.

The person says that she will think about it overnight

Full Access
Question # 38

Maximum Score 1

The Bravo Engineering Company is negotiating a maintenance contract with Express Deliveries Ltd. This large logistics company uses modern robotic storage and picking warehouse machinery to identify, sort, and facilitate over 200,000 orders each day. The volatile nature of the business means that the parties should build maximum flexibility into the performance management aspects of the contract.

Which of the following would be most appropriate to set out the parties’ obligations under the maintenance contract?

A.

A formal appendix to the maintenance contract

B.

A non-binding side-agreement to the maintenance contract

C.

A Service Level Agreement issued after the maintenance contract

D.

A clause that disclaims all accountability for the contract for the buyer

Full Access
Question # 39

Esther Francis has recently changed job from a supply role at Shine Cleaning Services (SCS) to a purchasing role at Southern Commercial Property (SCP).

Esther requires industry technical input to develop a cleaning services requirements specification for her new employer. Esther Francis wants to include her former employer SCS, in a market engagement exercise to inform the specification. Which of the following would be the most appropriate way to deal with the conflict of interest?

A.

Conduct the market engagement with SCS off the record

B.

Declare the potential conflict of interest to a senior manager of SCS

C.

Ask a colleague to conduct the market engagement with SCS

D.

Conduct market engagement with several capable suppliers, including SCS

Full Access
Question # 40

Streaming Ltd is a music streaming provider based in the UK. The company is looking for extending its presence in the US. To achieve this, the company needs to outsource the data centre service to a local company. To monitor the performance, the procurement manager would like to introduce a service level agreement (SLA) to the data centre service provider. Which of the following should be included in the SLA?

1. System availability

2. The mean time to recover from system failure

3. The actual number of on-time service delivery

4. Dispute resolution procedure

A.

1, 3 and 4 only

B.

1, 2 and 4 only

C.

1, 2 and 3 only

D.

2, 3 and 4 only

Full Access
Question # 41

Which of the following are the 'fundamental' labour standards laid down by the International Labour Organisation?

1. Elimination of child labour

2. Payment of a minimum wage

3. The right to collective bargaining

4. Abolition of forced labor

A.

1, 2 and 4 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 3 only

Full Access
Question # 42

Solus Trading has begun a project to improve the level of delivery performance from its suppliers. They need to develop a key performance indicator (KPI) to measure the performance improvement. Which KPI would be suitable to use?

A.

Percentage of on-time in full

B.

Percentage of rejects and returns

C.

Percentage of cost reduction

D.

Percentage of customer complaints

Full Access
Question # 43

Maximum Score 1

An effective key performance indicator should be:

A.

Standardised, meaningful, achievable, realistic, typical

B.

Sustainable, measurable, analysed, realistic, timely

C.

Specific, measurable, achievable, realistic, timely

D.

Specific, meaningful, analysed, realistic, typical

Full Access
Question # 44

Which of the following is the model form of contract for construction which is recommended by World Bank?

A.

ITC

B.

JCT

C.

CIPS

D.

FIDIC

Full Access
Question # 45

Under English law's general legal principles of contract formation, which of the following are likely to be offers? Select TWO that apply.

A.

Invitation to tender

B.

Quotation

C.

Purchase order

D.

Advertisement

E.

Catalogue

Full Access
Question # 46

As part of a tender, which of the following are advantages that a purchasing organisation would expect to achieve by specifying that suppliers hold certification to an international environmental management standard, such as ISO 14001?

It provides assurance that bidders have achieved a common standard of practice

It provides a guarantee that any polluting suppliers will be unable to tender

The standard is recognisable to local and international bidders

It removes the need to conduct internal environmental training

A.

3 and 4 only

B.

2 and 4 only

C.

1 and 3 only

D.

1 and 2 only

Full Access
Question # 47

Since services are intangible, so KPIs for services must be qualitative in all circumstances. Is this statement correct?

A.

No, KPIs for services must always be quantitative so that they can be measured easily

B.

No, some KPIs for services are measurable by means of outcome, time and space performed

C.

Yes, quantitative KPIs are limited to timeliness of supply of goods, defective rates and in-full quantities, which are applied to monitor supplier of physical goods

D.

Yes, the only measure mattered to supply of services is end-users' satisfaction

Full Access
Question # 48

To expand its operation, Steel Co. decides to build a new plant. Despite of excitement, the senior management is very concerned about the complexity and risks of such project. Hugo, the procurement manager, suggests that the company can adopt a model form of contract. What is the advantage of using model form of contract?

A.

It shifts the balance of power in the favour of the buyer rather than the contractor

B.

The company could avoid the need to draft a complex contract from blank

C.

Model form of contract eliminates the need for legal advice totally

D.

The company does not need to draft the drawings as well as specification anymore

Full Access
Question # 49

GPP, the employer, and Prosolia UK, the contractor, entered into five EPC contracts for the development of five different solar power generation plants in the United Kingdom. Four out of the five developments failed to be commissioned by the relevant due dates, with the delays ranging from 44 to 285 days.

Among other claims, GPP, acting through its two investment vehicles, claimed liquidated damages of £500 per day in all four contracts for Prosolia UK's failure to achieve completion of the plants by the due date. The liquidated damages claimed amounted to £1,804,221 across the four delayed contracts.

Prosolia, alongside various other defences, raised the defence that the liquidated damages provision in each contract was a penalty, and therefore unenforceable against it. Is Prosolia contractually obliged to make the payment to the plaintiff?

A.

No, the amount claimed is too excessive and it may put Prosolia into insolvency. The clause must be void

B.

No, the clause must be treated as a penalty clause which is unenforceable in UK

C.

Yes, the amount is a reward to the employer as they have supervised and monitored the projects

D.

Yes, the clause is a genuine estimate of possible losses that GPP may have suffered and therefore, it is enforceable.

Full Access
Question # 50

When should liquidated damages clauses be written into a contract?

A.

When the innocent party wants to punish the breaching party.

B.

When the breaching party wants to exclude all its liabilities

C.

When the court approves the damages amount before the contract is executed.

D.

When the loss to the innocent party will be either too uncertain or too difficult to calculate.

Full Access
Question # 51

Cleveland Insurance (Cleveland) offers a range of insurance services. The main software used in the call centre is a customer relationship management (CRM) system. Cleveland perceived an urgent need to replace the existing CRM system to deal with the increasing number of customers and services.

Urgent Digital Ltd (Digital) is one of the bidders of Cleveland’s ITT for designing, building and managing the new CRM system. Its bid team is led by Hank Irvine, its technical director. Hank realises that winning the Cleveland contract (valued at approximately £50M) will enhance his career. During discussions with Cleveland, Hank offers certain assurances regarding timescales for the project. He has not carried out any investigations into the viability of the timescales. Hank has little idea whether the timescales can be met.

Cleveland decides that Digital’s bid meets with its requirements, especially given the assurances in timescale offered by Hank, and decides to proceed with it, subject to a formal contract. Eventually, a formal contract is signed by both parties. The initial assurances given by Hank about the timing of the project are never going to be achieved and are at best grossly exaggerated.

Cleveland brought the case to the court and sought rescission of contract with Digital. Is Cleveland’s claim appropriate in this case?

A.

Yes, because Cleveland needs to seek rescission first before claiming for damages

B.

Yes, because both parties agreed with rescission of their contract

C.

No, because the work had been carried out which could not be returned

D.

No, because the contract does not include any provision on rescission

Full Access
Question # 52

If a false statement of material fact is made by one of the contracting parties, the misled party will have remedies for:

A.

Indemnity

B.

Misrepresentation

C.

Recission

D.

Damages

Full Access
Question # 53

Danielle buys a car from Aaron. Not long after, she receives an proposal from Brian, who isinterested in buying the car but his budget is very constraint. Then, Brian decides to sign a hire purchase agreement with Danielle which lasts 4 years. Brian lives very far from Danielle, so hehires Charlie to deliver the car to his place. During the transport, Charlie has an accident and the car is written off. At the time of accident, who has the title of the car?

A.

Charlie

B.

Aaron

C.

Brian

D.

Danielle

Full Access
Question # 54

Which of the following are benefits of using model form contracts? Select TWO that apply.

Liability is greatly reduced for suppliers

Suppliers can renegotiate terms more easily

They improve contract consistency

They are widely accepted in certain industries

A.

1 and 3

B.

1 and 2

C.

2 and 4

D.

3 and 4

Full Access
Question # 55

Which of the following are implied terms in sales contracts? Select THREE that apply.

A.

Payment method

B.

Customer satisfaction

C.

Transfer of ownership

D.

Risk transfer

E.

Fitness for purpose

F.

Mode of transportation

Full Access
Question # 56

CISG will be most likely to apply to which of the following transactions?

A.

Sale of electricity

B.

Sale of a property

C.

Sale of iron ores

D.

Sale of a ship

Full Access
Question # 57

Which of the following should be specially noticed in market dialogue with suppliers in specification development?

A.

Both parties must respect confidentiality

B.

The buying organisation must avoid social media at all cost

C.

Market dialogue is banned in the public sector

D.

Market dialogue should only be conducted with well-known supplier

Full Access
Question # 58

Which of the following KPIs is qualitative?

1. Openness and co-operation of supplier

2. Responsiveness of supplier

3. Customer satisfactory ratings

4. Cost management

5. OTIF deliveries

A.

2 and 5 only

B.

1 and 3 only

C.

2 and 3 only

D.

1 and 4 only

Full Access
Question # 59

Which of the following is the type of insurance that cover the liabilities of service provider such as legal advice, accountancy, technical designs, etc?

A.

PII

B.

Product liability

C.

Employer’s liability

D.

Public liability

Full Access
Question # 60

Which of the following are advantages of using a model form contract in negotiations between buyer and seller?

These contracts can save time in negotiations

Each contract is approved by the courts

These contracts are appropriate for all complexities

The contracts are well-known to both parties

A.

1 and 2

B.

2 and 3

C.

3 and 4

D.

1 and 4

Full Access
Question # 61

A tire manufacturer entered into a contract with a distributor. In the contract, the distributor is prohibited from selling the tire under the price list. The distributor must pay $5 for each tire sold in breach. The amount of $5 is known as...?

A.

Penalty

B.

Quantum meruit

C.

Liquidated damages

D.

Caveat Emptor

Full Access
Question # 62

A fashion company is drafting a specification for an order in next year. The company wants to expand its supply base in low cost countries. The procurement department is considering applying standard ISO 3759 on method for the preparation, marking and measuring of textile fabrics, garments and fabric assemblies for use in tests for assessing dimensional change after a specified treatment. Which of the following should be taken into account when embedding this standard into the specification?

A.

Date of publication

B.

Supplier selection

C.

Type of specification

D.

Legality

Full Access
Question # 63

Which of the following is always an advantage of using fixed price arrangement in a contract for buying organisation?

A.

Buyer can allocate budget with certainty

B.

Buyer can harness falling market price

C.

Supplier always receives a fixed margin

D.

Suitable for contracts that last 5 years or more

Full Access
Question # 64

In the application of price adjustment formulae, which of the following would be acceptable for a supplier to increase its selling price?

A.

Rising share prices

B.

Rising fuel costs

C.

Rising market expectations

D.

Rising incidence of defects

Full Access
Question # 65

Which of the following is a key feature of liquidated damage clauses?

A.

The amount of damage is predetermined

B.

Liquidated damage is a penalty

C.

The amount of liquidated damages must be exceptionally larger than the actual damages incurred

D.

The liquidated damages are non-negotiable

Full Access
Question # 66

Curnoe Ltd supplied tyres to Garage Ltd. Garage Ltd agreed in the contract that for any specified breaches of contract, it would pay Curnoe Ltd £5 per tyre sold in breach. It subsequently sold tyres at below the listed price, which was one of the breaches mentioned in the contract. What is the £5 per tyre provision an example of?

A.

Quantum meruit

B.

Exclusion clause

C.

Liquidated damages

D.

Unliquidated damages

Full Access
Question # 67

Which of the following is a disadvantage of using input specifications?

A.

It is difficult to assess suitability of each quotation

B.

It requires a more proactive approach to monitoring

C.

There is less opportunity for innovation

D.

There is no limit to the number of suppliers who can quote

Full Access
Question # 68

Which of the following statement is true about one-off contract?

A.

Suppliers have many opportunities to improve the quality during the performance of one-off contract

B.

One-off contracts can be used for services and works

C.

Ad-hoc purchase is not a type of one-off purchase

D.

One-off contracts only apply to low-value, low-risk purchase

Full Access
Question # 69

Which of the following is an invitation to treat?

A.

Purchase order

B.

Invoice

C.

Price list

D.

Tender bid