What project cost elements would NOT normally be reflected in the Activity 1000?
Crane operators require 1 hour prep and 1 hour clean-up and inspection per day. There is only 1 crane operator allocated per crane. Crane operators are not allowed to work more than 8 hours a day. Lunchtime break lasts 1 hour. Assuming a 10 minute cycle time, how many lifts per day can be expected?
Determine the correct formula and date for the late finish for Activity 2002.
In its simplest form, what is the main drawback of critical path method scheduling?
What day would Activity C complete if the duration of Activity A was reduced by five days?
Which of the following is NOT a tool or technique used to perform scope planning?
Assuming a total of 30 lifts per crane per day, what is the maximum number of lifts that could be accomplished using 3 small tower cranes over a 5-day period?
In the "normal" schedule, excluding Activity 1000, what activity(s) are concurrent with Activity 3001?
In order for a claimant to be entitled to an extension of contract time for a delay event (and further to be considered compensable):
Using the "normal" schedule, and assuming you are billing on the last day of the month for previous month and for appropriate partial months, how many invoices will you have for this project?
Determine the correct formula and date for the late finish for Activity 9004.
Which of the following will NOT affect the total float calculation of a non-resource leveled schedule?
The addition of which of the following relationships would cause a logic loop?
The amount of time that an activity can be delayed from its early start date without delaying project completion is called:
If someone wanted to constrain a project's end date so that any project slippage would cause negative float, they would do so by using
For activity 11001. why would the crashed direct cost be greater than the direct cost of the normal schedule?
What owner action could have mitigated the late completion of the project?
If a new hammock activity covering activities 6001 through 6003 is developed, what are governing predecessor and successor activities?
The congested site only has room for 3 cranes to operate concurrently. Only 1.75 cubic yard ICY] or1.34 cubic meter [CM] concrete buckets are available. Each crane can perform up to 35 lifts per day. Assuming a total of 30 lifts per crane pet day. what is the maximum volume of concrete that could be placed using 3 small tower cranes over a 5-day period?
Of the following update procedures, which is the least important in achieving an accurate forecast for completion of a construction schedule?
Which of the following parties is NOT a stakeholder of the Spring Highway project?
During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained?
If Activity A was delayed 5 days from starting, which of the following adjustments will NOT maintain the completion date of Activity C at Day 40?
Which letter of the alphabet best approximates the graphical shape of a project's cumulative cost baseline, or budgeted cost of work scheduled?
Which of the following will always describe the critical path? The path with
Project schedules help control all of the following EXCEPT for_____________________.
Based on the stated costs, what percentage of the total cost comes from the 2000 series of activities?